Provides Clarification for Commitment Made to NRC in Response to Insp Rept 50-382/90-23.Group of Safety Related Fuses Will Be Provided for Sampling During Refueling Outage 4 & Procedures Being Formulated
ML20082A469
Person / Time
Site: Waterford 
Issue date: 07/08/1991
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-91-0374, W3F1-91-374, NUDOCS 9107100338
Download: ML20082A469 (2)


Text

- - -

.g

~== ENTERGY F"'P" """* " '" *'

n-

>;lA;>

, a4(-

~ _. _ _. _ ~. _. _. _.. _... _ _.. - _

R. F. Ourski m

t W3F1-91-0374 A4.05 QA July 8, 1991 U.S. Nuclear Regulatory Commission httn: Document Control Desk Washington, D.C.

20555

Subject:

Waterford 3 SES Docket No. 50-382 Licenso No. NPF-38 Waterford 3 Response To NP.C Inspection Report No. 50-382/90-23 and Clarification of Commitment Gentlemen:

As discussed with the NRC Resident Inspector for Waterford 3, on June 25, 1991, the purpose of this letter is to provide clarification for a commitment made to the NP.C in the response to NRC Inspection Report No. 50-382/90-23, reference Waterford 3 letter W3F1-91-0298.

In Waterford 3 letter W3F1-91-0298, response 2.c, Waterford 3 specifically stated:

"At this time, the task force has initiated the following:

1)

Provide a group of safety related fuses *or sampling during the refuel 4 outage.

2)

Asulgned responsibility for 6eveloping a fuse control interim procedure until long term solutions are formu]ated.

The results of both of the above actions will be available for review by June 30, 1991."

The intent of commitment 2) was to have a procedure avalleble which was cubstantially developed and reviewed by the fuse control task group.

In this manner, any provisione from the results of the sampling effort could be i

c

[yih h

l PDR ADOCK 05000382

)

-O PDR

d."

W3F1-91-0374 Page 2 July 8, 1991 integrated, if needed, into the final approved procedure. Such a procedure has been prepared and is currently in the review process. The interim procedure will ne approved by August 15, 1991.

Should you have any questions concerning this matter, please feel free to :ontact R.J. Murillo at (504) 739-6715.

Very truly yours, sts RFB/RJM/dc cc: