ML20081M773

From kanterella
Jump to navigation Jump to search
RO 83-040:on 831014,radiation Monitor RM-L-12 Not Installed on Industrial Waste Filter Sys Common Discharge Per Tech Specs,Due to Failure to Receive Amend 88 to License DPR-50, Changing Tech Specs.Public Safety Maintained
ML20081M773
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/25/1983
From: Toole R
GENERAL PUBLIC UTILITIES CORP.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
5211-83-313, RO-83-040, RO-83-40, NUDOCS 8311170367
Download: ML20081M773 (1)


Text

,

Nuclear I,uct;f =""

Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84-2386 Writer's Direct Dial Number:

October 25, 1983 5211-83-313 Dr. Thomas E. Murley Region I, Regional Administrator U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 LER 83-040 This is to confirm the telephone notification with Mr. F. Young, NRC Resident Inspector and Mr. R. Conte, NRC Resident Inspector by Mr. M. A. Nelson at approximately 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on October 24, 1983.

RM-L-12 has not been installed and made operable prior to issue of T.S.

Amendment 88. RM-L-12 is the radiation monitor to be located on the Indus-trial Waste Filter System (IWFS) common discharge prior to dilution by mechanical draft cooling tower flow. This event is considered reportable under section 6.9.2.a.2 of the Unit 1 Technical Specifications since IWTS/

IWFS releases occurred without satisfying the LCO for RM-L-12. issued by NRC on October 14, 1983 as immediately effective. The amendment was not received by TMI-l until October 21, 1982 and therefore, could not be implemented immediately.

Although reportable, there was no threat to the health and safety of the public since adequate sampling and monitoring was available in acccrdance with Technical Specifications (prior to Amendment 88) .

Corrective action for this event will be covered in the 14 day followup report.

Sincerely, 8311170367 83102S PDR ADOCK 05000289 PDR , @. /y L S ,

J. To e Operations & Maintenance RIT:vj f Director cc: R. Conte GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation i0