1 Ente y Operations,Inc.
K'ibna LA 70C66 Tel 504 739 6774
/
R. F. Burski Deeckw.
hatar $#ety VMerford 3 i
W3F1-95-0049 A4.05 PR March 30, 1995 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Severe Accident Management Gentlemen:
The purpose of this letter is to inform you that Entergy Operations Incorporated (E01) intends to implement the formal industry position on severe accident management at the Waterford 3 Station.
This position was approved by the Nuclear Energy Institute's Nuclear Strategic Issues Advisory Committee on November 4, 1994. As previously communicated in a letter dated November 21, 1994, from NEI to the Director,. Office of Nuclear Reactor Regulation, the formal position states that each licensee will:
Assess current capabilities to respond to severe accident conditions using Section 5 of NEI 91-04, Revision 1, " Severe Accident Issue Closure Guidelines."
Implement appropriate improvements identified in the assessment, within the constraints of existing personnel and hardware, on a schedule to be determined by each licensee and communicated to the NRC, but in any event no later than December 31, 1998, 1
fe' 03c013 b
9503310302 950330 PDR ADOCK 05000382 P
~.
t LSevers' Accident Management W3F1-95-0049 Page 2
. March 30, 1995 Based on previous interactions between NEI (NUMARC).and NRC staff, we understand that the NRC staff agrees with the need for licensee flexibility in their methods of assessing and establishing severe accident management guidance.
Utilizing the associated implementing guidance (contained in NEI Report 91-04, Revision 1) we. intend to complete the assessment of severe accident mana'gement capabilities and make any identified enhancements by July 1, 1997.
E0I has participated in development of and will utilize the CE0G Generic
- Accident Management Guidelines. -Insights from the Individual Plant i
Examination (IPE) and IPE of External Events (IPEEE), will be. incorporated into the Accident Management Guidelines (AMGs) to make the guidelines plant-specific.
If you have any questions, please contact B.G. Morrison at (504) 739-6682.
Very truly yours, f
i R.F. Burski Director Nuclear Safety j,
RFB/BGM/ssf cc:
L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident Inspectors Office
.