Responds to IE Bulletin 83-06, Nonconforming Matls Supplied by Tube-Line Corp. Installed Caps & Tees Certified to Be in Compliance W/Asme Section Iii,Class 2, Requirements
ML20081M152
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/10/1983
From: Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 1-388, IEB-83-06, IEB-83-6, NUDOCS 8311170118
Download: ML20081M152 (4)


Text

.

TOLEDO

%mm EDISON Docket No. 50-346 RCHARO P, CROUSE g nc v

License No. NPF-3 mm asssaai Serial No. 1-388 November 10, 1983 Mr. James G. Keppler Regional Director U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Boulevard Glen Ellyn, IL 60137

Dear Mr. Keppler:

On July 25, 1983 Toledo Edison received IE Bulletin 83-06 (Log No. 1-823) concerning nonconforming materials supplied by Tube-Lice Facilities.

The enclosed attachment provides Toledo Edison's response to this bulletin.

Very truly yours, 5fk;=:

RPC/CTD dm d/23 cc:

U.S. Nuclear Regulatory Commission Document Control Desk NRC Resident Inspector 8311170118 831110 PDR ADOCK 05000346 f)

G PDR sII l

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652

4 ATOMIC ENERGY ACT OF'1954 ~

SECTION 182a SUBMITTAL IN RESPONSE FOR THE

~ DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1

- FACILITY OPERATING LICENSE NPF-3 i.

This letter is submitted in~conformance with Atomic Energy Act of 1954-Section 182a in response to IE Bulletin 83-06'(Log No. 1-823). -This deals with nonconforming materials supplied by Tube-Line Corporation facilities at Long Island City, New Ysrk; Houston, Texas, and Carol Stream, Illinois.

7 :

Vice President, Nuclear Sworn to and subscribed'before me this 10th day of November, 1983.

j}

Not'g Public -

LINDA L' COSTELE Notary Putlic, State of Ohio My commission expires feb. 15,1987 d

9

-,'-~,y rm-y--

,w r--

+,

,---e-


+v

Toledo Edison Response to IE Bulletin 83-06:

. Request 3a:

Provide a list of the T-L supplied materials and identify the systems in which the materials are installed.

Response 3a:

The following Tube-Line materials have been installed in safety-related systems at Davis-Besse Unit #1.

Material System 4'ea. 6 inch, SA234 WPB, Schedule 80 Auxiliary Feedwater Caps, Heat #NDUC 2 ea. 6 inch, SA234 WPB, Schedule 80 Auxiliary Feedwater Tees, Heat #NDLG 16 ea. 3: inch 600 pound, SA105 Flanges Auxiliary Feedwater Heat Numbers EKP and EVVA Table 2 of IE Bulletin 83-06 indicates that Davis-Besse was also a recipient of stainless steel materials supplied by Tube-Line. These materials had not yet been installed at Davis-Besse. They have been removed from stock and re-turned to Capitol Pipe and Steel Company through which they were originally procured.

All other material received from Tube-Line has been in-stalled in non-safety related systems.

Request 3h:

Implement a program as discussed in 2b or 2c above.

2b.

Implement a program which provides assurance that received materials comply with ASME Code Section III and applicable procurement specification requirements, or which demonstrates that such materials are suitable for intended service. This program should include specific verification that received austenitic stain-less steels are in a nonsensitized condition.

2c.

Replace fittings and flanges with materials which have been manufact, red in full compliance with ASME Code Section III aad the applicable procurement specifica-tion requirements.

During the 1983 refueling outage, samples were taken from the installed caps and tees. These samples were tested by the Babcock and Wilcox Company for conformance to the material specification. As a result of this analysis, the caps and tees have been certified to be in compliance with ASME Section III Class 2 requirements.

~

The flanges were replaced during the 1983 refueling outage by new flanges which had been manufactured in full compli-ance.with ASME Code Section III Class 2 requirements.

ea,

Request 3c:

Provide a basis for continued plant operation if the-program requested by Item 3b has not been completed by the

. time'of the bulletin response.

Response,3c:.

This item is not applicable as a~ result of.the action taken to.3b noted above.

Request:- Although the specific details involving the nonconforming materials supplied by T-L may not directly apply for your facility, you are requested to' review the general concerns expressed in the bulletin for applicability at your facility.

Your response should describe the results of the review, and if the' general concerns apply, you. should describe the short-term and long-term corrective actions to be taken and the schedules thereof.

Response: Toledo Edison recognizes the safety concerns that the supplier practices described in this bulletin raises.

It is Toledo Edison's opinion that destructive testing on either a sampling or each heat received basis would be the only way in which misrepresented materials could be detected. Such a testing program would require the ordering of extra material'of each heat and sending it to a testing lab for destructive testing.- Although this program could be set up on a sampling basis, its. implementation would be extremely time consuming and difficult to manage. Alternatively, Toledo Edison considers an approach through the ASME survey system to be more practical.

In.this approach, ASME should be requested to modify their survey system of suppliers to require that a representative portion of material heats be selected and tested.under the auspices of ASME to verify the validity of the associated

-material test report.