Georgians Against Nuclear Energy Petition for Leave to Intervene.* Petitions Commission for License to Intervene in Util Request to Change Testing Schedule Requirements on Emergency Diesel Generators at Facilities
ML20081L476
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/14/1991
From: Carroll G
GEORGIANS AGAINST NUCLEAR ENERGY
To:
NRC COMMISSION (OCM)
Shared Package
ML20081L462 List:
References
OLA-2, NUDOCS 9107050112
Download: ML20081L476 (2)


Text

-

- -. = _ - _ -.

~

..I 4

DOCKETED

. Docket Nos. 50-424 & 50-425 fl d

C JUN I 4-1991 GEORGIANS AGAINST NUCLEAR ENERGY PETITION FOR LEAVE 0 7

CD SECY4RC P

i g

Georgians Against Nuclear Energy (GANE) respectfully petiti s

\\

Commission for' license to intervene in the case of Georgia Power a

i request to change the testing schedule requirements on their emergency diesel generators at Nuclear Plant Vogtle Units I and II in Burke County, Georgia.

(Docket Nos. 50-424 and 50-425, Amendment Request: April 22, 1991, rederal Register Notice Vol. 56,.No. 94, pp.-22468-22469.)

'We believe that safety at the nuclear plant would be compromised if this request'were granted and create a greater possibility of an accident which would threaten the health, lives and property of our members which live in proximity to Plant-Vogtle.

We have many concerns with the requested Technical Specification change to operating procedures for the diesel generators at Plant Vogtle. One of the generators played _a significant role in the Site Area Emergency which occurred at Vogtle I on March 20, 1990, leading to a dangerous loss of power to the cooling systems. A subsequent investigation by your agency spotlighted chronic problems with the generators at Vogtle. The-licensee has been cited on more than one occasion for violations surrounding diesel generator testing. Georgia Power was called to an enforcement conference in 1990 'for the failure of the diesel duringlthe Site Area Emergency. In addition the NRC's Office of Investigation.is investigating allegations-that the licensee lied to the NRC about the reliability of the diesel generators following the Site Area Emergency..Wo believe that deleting the 5:100 criteria from the testing schedule significantly decreases reliability assurance at the confidence-level stated in NRC regulation.

We have been studying the diesel generators at Plant Vogtle for the last year with the Power Company and the NRC and have found a disturbing array of f

questions surrounding the reliability of the generators. We want tc see the generators weaknesses repaired and assert-that' appropriate testinq'of the generators facilitates revelation of the problems..At the minimum, we request that Vogtle's diesel generators be held to the current testing regulations in an effort to reestablish confidence in the problematic diesel generators.

Respectfully submitted, l

gUhf?N

/[lebnCarroll,RepresentativeforGANE Dated and signed June 14, 1991 in Decatur, GA 9107050112 910620 PDR ADOCK 05000424 g

PDR

Service List:

Secretary of the Commission U.S. Nuclear Regula*ory Commission Washington, DC 20555 c/o: Emile Julian 3

Docketing and Services Branch Office of the General r U.S. Nuclear Regulator.

a' en Washington, DC 20555 Arthur H. Domby, Esquire Troutman, Sanders,

  • ockern.sn & Ashmore Candle; Suildin's, Suite 146i 127 Peachtree Stret't NE Atlanta, GA 30303 (Georgians Against Nuclear Energy)

P.O. Box 8574 Atlanta, GA 30306 J