ML20081L460

From kanterella
Jump to navigation Jump to search
Forwards Final Rept Exercise Rept for Byron Nuclear Power Station Commonwealth Edison Co,Joint Exercise, on 930512
ML20081L460
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/13/1995
From: Hepler O
Federal Emergency Management Agency
To: Spessard R
NRC (Affiliation Not Assigned)
Shared Package
ML20081L461 List:
References
NUDOCS 9503300211
Download: ML20081L460 (1)


Text

- - - -

/,

g Federal Emergency Management Agency I

Washington, D.C. 20472

.Mr. R. Lee spessard, Director Division of Technical Support Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Spessard:

Enclosed is a copy of the final report for the May 12, 1993, plume exposure pathway exercise of the offsite radiological emergency response plans site-specific to the Byron Nuclear Power Station.

The State of Illinois partially participated and Ogle County fully participated in this exercise.

The Commonwealth Edison Company also participated.

The final exercise report was prepared by the Federal Emergency Management Agency (FEMA) Region V staff.

A copy-of this report'will be provided to the State of Illinois by FEMA Region V staff.

There were no Deficiencies identified during this exercise.

There were, however, three Areas Requiring Corrective Action (ARCAs) identified.

One ARCA has been corrected and the results are included in the enclosed report.

FEMA Region V staff will monitor the status of corrective action for the remaining ARCAs.

Based on the results of the May 12, 1993, exercise, the offsite radiological emergency response plans and preparedness for the State of Illinois and the affected local jurisdiction, site-specific to the Byron Nuclear Power Station, can be implemented and are - adequate to provide reasonable assurance that appropriate measures can be taken offsite to protect the health and safety of the public in the event of a radiological emergency at the site.

Therefore, the Title 44 CFR, Part 350, approval of the offsite radiological emergency response plans and preparedness for the State of Illinois site-specific to the Byron Nuclear Power Station, granted on September 12, 1984, will remain in effect.

If you should have any questions, please contact Dr. Anne Maria T.

SuPrise, Chief, State and Local Regulatory Evaluation and Assessment Branch, at (202) 646-4065.

Sincerely, hk E

i O. Meg Hep r, III Director Exercises Division Preparedness, Training, and Exercises Directorate Enclosure h[dj3OO 2Ik

_