Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-341/83-17.Corrective Actions:Emergency Diesel Generator 11 Voltage Regulator Mods Halted.New Temporary Mod 44 Issued to Replace Temporary Mod 12
ML20081J987
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/1983
From: Wells D
DETROIT EDISON CO.
To: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20081J972 List:
References
EF2-65290, NUDOCS 8311090225
Download: ML20081J987 (3)


Text

_

  • 3 P.

Donald A. Wells Aggegoujjy Ash'a'ce a$a October 31, 1983 EF2-65290 Mr. R.C. Knop, Chief Projects Branch 1 U.S. Nuclear Regulatory 'M'ssion Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Nonempliance at Enrico Fermi Unit 2 - IE Report 50-341/83-17

Dear Mr. Knop:

This letter responds to the item of nonempliance described in your IE Report No. 50-341/83-17. This inspection of Enrico Fermi Unit 2 construction site activities was performed by Messrs. P.M. Byron, M.E. Parker and B.H. Little on July 1 through August 31, 1983.

The its of noncmpliance is discussed in this reply as required by Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.

The enclosed response is arranged to correspond to the sequence of itms cited in the body of your report. The neber for the item of nonempliance and the applicable criterion is referenced.

We trust this letter satisfactorily answers the concern raised in your report. If you have questions, please contact Mr. G.M. Trahey, Assistant Director - Project Quality Assurance.

Very truly yours, (v

DAW /EHN/pn cc: Mr. Richard DeYoung, Director Office of Inspection and Enforement U.S. Nuclear Regulatory Ccmnission Washington, D.C.

20555 Mr. Paul Byron, Senior Resident Inspector U.S. Nuclear Regulatory Ccmnission 6450 North Dixie Highway Newport, Michigan 48166 a

PNIhCK225 831104 05000341 G

PDR DCT 311983

i i

J THE DETROIT EDISON COMPANY PROJECT QUALITY ASSURANCE ENRICO FERMI 2 PROJECT Response to NRC Report No. 50-341/83-17 Docket No. 341 License No. CPPR-87 Inspection at: Fermi 2 Site, Newport, Michigan i

Inspection Conducted: July 1 through August 31, 1983 APPROVED BY:

, [f/rA T.A.' Alessi, Director Project Quality Assurance I

AY ON

/

/

l 1

I t.

i i

(

l l

., _ _, _.. _ _, -., ~, -.,

Response to NRC Inspection Report No. 50-341/83-17 (83-17-01)

~

l

}

Statment of Noncmn11ance, 83-17-01 l

l 10CFR50, Appendix B, Criterion V states in part:

" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circu:rstances and shall be accmplished in accordance with these instructions, procedures, or drawings".

DECO Quality Assurance Procedure 9.1.1 states:

" Instructions, pro-cedures, or drawings prescribing activities affecting quality shall delineate the meti.od and sequence an activity is performed and include appropriata quantitative or qualitative acceptance criteria for determining th3 activity has been satisfactorily performed."

Contrary to the above, the inspectors observed on August 12, 1983, work being performed on anergency Diesel Generator No.11 Voltage regulator with an illegible and unreadable PN 21, Operating or Maintenance Order, and an electrical single line sketch which had no references or description.

This is a Severity Level IV violation.

Corrective Action Taken and Results Achieved Upon notification of this violation, work was stopped and a new temporary modification, #44, was issued to replace tmporary modi-fication #12. This modification attached a copy of the reviewed design being installed.

Corrective Action Taken to Avoid Further Noncmpliance A procedure connent control form was issued by the Lead Start-Up Engineer (LSTE) - Electrical, to Nuclear Production requesting a revision to the temporary modification procedure 12.000.25T. This would require an attached copy of the reviewed design or sketches to applicable temporary modifications. This will provide an approved reference for installation and design configuration cf the temporary nodification.

Procedure 12.000.25T was revised on Septmber 6,1983, to reflect this change. All Start-Up test personnel have received training with regards to chis procedural revision.

The Date When Full Cmpliance Will be Achieved Full cmpliance has been achieved.

l

--