ML20081J705

From kanterella
Jump to navigation Jump to search
FOIA Request for Drafts of Integrated Design Insp Program Rept for Facility & Matl Outlining Criteria Used to Select Plants for Review
ML20081J705
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/16/1983
From: Levy A
ST. LOUIS GLOBE-DEMOCRAT, ST. LOUIS, MO
To: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-83-334 NUDOCS 8311090085
Download: ML20081J705 (1)


Text

L  ;

1 SL Tonis @ 0Jc-Bemocutt l Gt OI4E DC WX H AT PUIAISHING COMPANY 7to N totainsivo ST LOUIS MO 63101 NE. DOM OF INFORAMT)0N E 314) 342-1212 A M RE W FOIA 23-339 du 'd 6-J / 43 June Ib, 1983 C04Wb cwdib J.M. Felton, director, division of rules and records Office of Administration ,

U.S. Nuclear Regulatory Commission Uashington, D.C. 20555

Dear Mr. Felton:

Under the federal Freedom of Information Act, I would like copies of any and all drafts of the integrated design inspection program report on the Callaway nuclear power plant in Callaway County, No. I do NOT need a copy of the final report, because that has already been sent to me.

In addition, under the federal Freedom of Information Act, I would like copies of any material outlining the criteria used to select which planta or plants would be reviewed as part of the integrated design inspection.

If the total cost of these materials will be more than $50, please write or call before incurring the costs. If they will be $50 or less, please go ahead and send the materials with a bill, which I will have paid.

Thank you. If you have any questions, feel free to call or write. My telephone number is {314} 342-1330 Sincerely, dm [Y D Allen W. Levy, reporter 8311090085 830616 PDR FOIA LEVY 83-334 PDR