ML20081H842

From kanterella
Jump to navigation Jump to search
Forwards Rev 14 to Operating QA Manual
ML20081H842
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/11/1991
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20081H845 List:
References
ULNRC-2420, NUDOCS 9106200060
Download: ML20081H842 (4)


Text

r --

  • y hSdY

1901 (patiot Street '

Post Ofla tox 149

. SL Lova Mmoun 63166 Y

.314 554 2650 Y

' June 11, 1991 Donald f. Schnell J rI@1 U.

S.

Nuclear Regulatory Commission

~ > nw # e

-Etuernic' Occument contro1 oesx E

Mail Station P1-137 Washington, DC 20555 ULNRC-2420 Gentlemen:

ZeOCKET NO. 50-483 CALLAWAY PLANT OPERATING OUALITY ASSURANCE MANUAlt. REVISION 11

Reference:

1) ULNRC-2220, Dated June 4, 1990 Furnished herewith for your review and approval is a copy of updated pages which constitute Revision 14 of the Callaway Plant Operating Quality Assurance Manual (OQAM). Pursuant to the _ requirements of 10CFR50.54 (a) - and 10CFR50.71(e) (3) (1),

the OQAM has been revised to incorporate changes to the Op9 rating Quality Assurance Program (OQAP) description made

'since the last docketed revision transmitted by Reference 1.

In addition to the OQAM, Rev.sion 14 updated pages, please

-find enclosed one copy each of the following:

1.

OQAM (Revision 14)< mark-up, identifying changes through the use of inserts and strikeovers.

2.

Explanations and justifications for changes to the OQAM.

The changes have been evaluated by Union Electric. There is one change (identified as Item 6 on Attachment 3) which could be interpreted as a lessening of commitment. We believe the proposed change will be more effective in assuring timely procedure updates than the present two-year review cycle. Because of the nature of this change, we believe.it should receive your: approval. prior to imp 22menta-tion. The other changes are not considered reductions in the OQAM commitments previously accepted by the NRC. The revised OQAM continues to satisfy the requirements of 10CFR50, Appendix B.

p 9106200060 910611

/

^

PDRADOCK 03OOO483

/

v/

P PDR I

t.

a

e s

ULNRC-2420 Page 2 Juno 11, 1991 If you have any questions, please contact us.

Very truly yours,

(

Donald F.

Schnell WC A li JVL/RCS/ pas Attachments:

1) OQAM (Revision 14) updated pages
2) OQAM (Revision 14) identifica+. ion of changes
3) Explanations of and justifications for proposed changes to the.OQAM

. ~ - _ -

~. -.

o.

ULNRC-2420 Page 3 June 11, 1991 cc:

A.

B. Davis Regional Administrator U.S.

Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 R.

L. Hague Chief, Reactor Projects Section 3C U.S.

Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn,.IL 60137 M.

D.

Lynch USNRC Licensing Project Manager (2 copies)

Office of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Comminsion Mail Stop 13-E-21 Washington, D.C.

20555 Manager,-Electric Department Missouri Public Service Commission P.O.

Box 360 Jefferson City, MO 65102 B. L. Bartlett /D. R. Calhoun Resident NRC Inspectors, Callaway Plant Callaway Resident Office U.S.

Nuclear Regulatory Commission RR #1 Steedman, MO 65077 Shaw, Pittman, Potts, & Trowbridge w/o 2300 N.

Street, NW Washington, D.C.

20037 i.

-c s ULNRC-2420 Page 4 June 11, 1991 STATE OF MISSOURI )

)

SS CITY OF ST. LOUIS )

Donald F. Schnell, of lawful age, being first duly sworn upon oatn says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the fore-going document and knows the content thereof; that he has executed the same for and on behalf of said contpany with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information, and belief.

O By 4f Donald F.

Schnell Senior Vice President Nuclear I

i SUBSCRIBED and sworn to before me this // day of M,

1991.

f

/At/HisA N

g.ga8 ARA hPp Ak NO l

NatARY PUBlic, STATE Of MissouRt WY C0ppisS10N (IPIRfS APRIL ;2.1993 ST. LOUIS COUNTY l

l l

l i

_ _ _ _ __