Forwards Remedial Soils Work Activity List for Nov 1983 & Supplemental Work Activity List for Dec 1983,per ASLB 820430 Order.Review,Comments & Authorization Requested
ML20081H244
Person / Time
Site: Midland
Issue date: 10/31/1983
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6967, NUDOCS 8311070366
Download: ML20081H244 (20)


Text

.-.

O CORSumBIS Power

~

" ' ' ' ' ' ' ' ^ ' " ' " '

CO@W p

r' Atilland Ivoject Office t

General Offices: 1945 West Pernell Road, Jackson, MI 49201 + (517) 788 0774 l

_a jPRINiPAL STAFF Jg?

y}k October 31, 1983 i.3 3

.x x

IV

-}

U Mr J J Harrison U

fL.

fg

/

Midland Project Section y je U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File: 0485.16 UFI:

42*05*22*04 Serial: CSC-6967 12*32 We are enclosing the proposed list of work in accordance with the "NRC and CPCo Work Authorization Procedure" for the period between November 1, 1983 and November 30, 1983. Please review this work list and authorize the specific work items as established in the procedure.

Also enclosed is a Supplemental Work Activity List for December, 1983.

Your review, comments and authorization of the specific work items as in accordance with the procedure are similarly requested.

Activity #207050620 was inadvertentiv given an incorrect designation of "R" on the two previous reports. Refer to footnote number six for details.

YCO JAM /AEB/k1w Attachments a

Nov

-C Ol 8311070366 831031 PDR ADOCK 05000329 J,, v Il. 0 A

PDR

1 Consumers Power Company Attachment to Serial CSC-6967

Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION GENERAL QUALITY PROGRAM 102351100 Approval of MPQP-2, Rev 1 A (10/22/82) 102351125 Approval of MPQP-1, Rev 7 A (9/27/83)

AUXILIARY BUILDING & FIVP UNDERPINNING PROGRAM 145054000 Pit Method for Construction of Aux Bldg Perm Wall Underpinning (concept only)

WEST FIVP 102150010 Install Anchor Bolts & Rods 1 (8/12/82) A (8/13/82)

(includes hardness test on rods, drill concrete & steel and tensioning)

EAST FIVP 112150010 Install Anchor Bolts & Rods 1 (8/12/82) A (8/13/82)

(includes hardness tests on rods, drill concrete & steel, and' tension)

BUILDING MONITORING 136050043 Maintain Instrument System 3 (8/12/82) A (8/12/82) 132550050 Install, wire conduit and raceway from pier 2(12/13/82) A(12/13/82) to data room for Pier Instrumentation 165052021 Terminate Cables in Data Room & Terminal Boxes A (3/10/83)

& Pier Instrumentation miO882-2439d173-163 JEKostielney 10/29/83

2 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR TIIE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION GENERAL TEMPORARY DEWATERING 125150050 Continue Monitoring Utility Protection Pits (4) 3 (8/12/82) A (8/12/82) 115150020 Continue Operation of Freeze System & Wells 3 (8/12/82) A (8/12/82) 522550025 Excavate, Repair and Backfill Piezometer MP-2 1 (4/5/83) 522550020 Repair Six (6) Existing Observation Wells (WB-1, WP-2, COE-10, PD-18, W-2, PD-38) 1 (4/5/83) A (9/23/83) 4 j

125150052 Repair Ductbank (Pit 4) 1 (8/25/82)

(includes excavate, drift, repair and backfill) 115150026 Remove 36" Casing and Backfill 42" Hole 1 (9/17/82) A (9/27/83) 115150025 Clean out and backfill abandoned ejector holes (ME26A, ME28A and HE54)

R 102550135 Install piezometers BB1 & BB2 in Auxiliary Building A (7/28/83)

Control Tower i

CRACK MAPPING (includes scaffolding platforms, ladders and

]

extra-ordinary clean up) 102250200 EPA (East & West) 3 (8/12/82) A (8/12/82) 102250105 FIVP (East & West) 3 (8/12/82) A (8/12/82) 102250100 Control Tower & Remainder of Aux Bldg 3 (8/12/82) A (8/12/82) m.iO882-2439d173-163 JEKostielney 10/29/83

3 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER 12W 165054010 Install & Load Pier 12W3 1 (8/12/82) A (12/9/82)

PIER 11W 165054015 Install & Load Pier 11W3 1 (8/25/82) A (2/22/83)

(includes install bituminous plywood forms)

PIER 9W 165054005 Install & Load Pier 9W3 1 (9/17/82) A (2/24/83)

PIER 12E 155054010 Install & Load Pier 12E3 1 (8/12/82) A (12/9/82)

PIER 11E 155054015 Install & Load Pier 11E3 1 (8/25/82) A (2/22/83)

PIER 9E 3

155054005 Install & Load Pier 9E 1 (9/17/82) A (2/24/83)

PIER 8E 155054020 Install & Load Pier 8E3 1 (9/17/82) A (5/3/83)

GRILLAGE STRUCTURE AT PIER 8E 155055010 Install & Load Grillage Structure at Pier 8E I (9/17/82) A (6/20/83)

PIER 8W 165054020 Install & Load Pier 8W3 1 (9/17/82) A (5/3/83)

GRILLAGE STRUCTURE AT PIER 8W 165055010 Install & Load Grillage Structure at Pier 8W 1 (9/17/82) A (6/20/83) miO882-2439d173-163 JEKostielney 10/29/83

4 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR TifE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITl! ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III I

REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER W10 165054030 Install & Load Pier 10W3 1 (4/5/83) A (5/3/83)

PIER E10 155054030 Install & Load Pier 10E3 1 (4/5/83) A (5/3/83)

PIER KC2 165054315 Install & Load Pier KC23 1 (9/17/82) A (4/22/83)

PIER KC11 155054315 Install & Load Pier KC113 1 (9/17/82) A (4/22/83)

PIER KC3 165054305 Install & Load KC33 A (07/28/83)

PIER KC10 155054305 Install & Load KC103 A (07/28/85)

?

PIER E13 155053040 Excavate Pier E132 A (08/29/83) 155054035 Install Pier E13 A (08/29/83)

PIER W13 165053040 Excavate Pier W132 A (08/29/83) 165054035 Install Pier W13 A (08/29/83) 1 miO882-2439d173-163 JEKostielney 10/29/83

5 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR TIE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER KC4 1

155052032 Finger Drift to KC4 A (9/23/83) 155053315 Excavate Pier KC42 A (9/23/83) 155054310 Install & Load Pier KC48 A (9/2J/83)

PIER KC9 1

165052032 Finger Drift to KC9 A (9/23/83) 165053315 Excavate Pier KC92 A (9/23/83) 165054310 Install & Load Pier KC93 A (9/23/83)

LEVEL C WALES 165055305 Install Level C Wales, West Side A (08/29/83) 155055305 Install Level C Wales, East Side A (08/29/83)

SUPPORT BRACKET 152555010 Install Temporary Support Bracket at El 162555010 Install Temporary Support Bracket at W1 PIER CT12 155052035 Drift to CT12 from UAT1 A (9/30/83) 155053050 Excavate Pier CT122 A (9/30/83) miO882-2439d173-163 JEKostielney 10/29/83

j Consumers Power Company Attachment to Serial CSC-6967 j Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS RFGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION i

o 155054045 Install & Load Pier CT123 PIER CTI i

165052035 Drift to CTI from UAT1 A (9/30/83) 165053050 Excavate Pier CT12 A (9/30/83) i 165054045 Install & Load Pier CT13 9

LONG DRIFTS 155052030 Drift to KC3 from KC21 A (07/28/83)

[

155052320 Drif t From KC3 to 13ft East of KC41 A (09/23/83) l 165052320 Drift From KC10 to 9ft West of KC91 A (09/23/83)

^

SERVICE WATER PUMP STRUCTURE UNDERPINNING PROGRAM POST TENSIONING SYSTEM i

202555170 Post Tensioning Tendon inspection & maintenance 3(12/7/82) A (12/7/82) i DEWATERING 207050605 Install Remaining Ejector Wells A (6/23/83) 207050646 Continuing Monitoring & Repair of the CWIS-SWPS A (9/27/83)

Hydraulic Seal j

207050600 Install Piezometers A (6/23/83)

]

207050601 Install Four (4) Additional Piezometers A (9/07/83)

m.iO882-2439d173-163 JEKostielney 10/29/83

}

7 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 207050635 Install Dewatering Discharge System 2 (9/17/82) A (6/23/83)

(including headers, tank, pumps and electrical) 207050387 Convert 7 Wells used on 72" pipe repair to support SWPS 1(11/1/82) A (2/11/83) dewatering.

(Includes install new ejectors, tempora ry headers, operate, & maintain) i 207050620 Activate, Operate and Maintain Dewatering System 1(9/17/82) A (5/27/83) 8 Fill SWPS Chambers (Bays) 203150165 Fill SWPS Chambers with Water to El 622 (15')

A (9/07/83)

Modify Pipe Supports 202550164 SWPS - Modify pipe supports to allow for design load A (5/27/83)

(30" 0HBC 34, 20 & 16)

ACCESS SHAFT & EXCAVATION 207050781 Excavate, lag, brace and install wales and struts A (9/30/83) in upper east section of SWPS access shaft (soldier piles 14 thru 30 - maximum excavation to EL 618'-3" l

excluding localized excavation at pipe supports).5 207050782 Excavate, lag, brace and install wales and struts A (9/30/83) in upper west section of SWPS access shaft (soldier Piles 1 thru 14 - maximum excavation to EL 624'-9" excluding localized excavation at pipe supports.)s 207050783 Excavate lag, brace and install wales and struts, 1

(7/5/83) A (10/19/83) pour and cure concrete mudmat in lower east section of SWPS access shaft (soldier piles 15 thru 30 -

maximum excavation to EL 618'i6" excluding localized excavation).5 miO882-2439d173-163 JEKostielney 10/29/83

8 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 207050784 Excavate, lag, brace and install wales and struts, 1

(7/5/83) A (10/19/83) pour and cure concrete mudmat in lower west section of SWPS access shaft (soldier piles 1 thru 14 -

maximum excavation to EL 618' 6" excluding localized excavation).5 BUILDING MONITORING 206050105 Crack Map SWPS 1 (9/17/82) A (3/10/83) 206050101 Install Permanent Benchmark Covers I (9/17/82) A (4/20/83) 206050104 Baseline, Operate, and Maintain Instrument System A (9/01/83)

DUCTBANK PENETRATION 852450105 SWPS - Provide Ducktbank Penetration in SWPS Wall and install pull box.

REBEDDING PHASE II 400050100 Install Sheeted Pits Phase IIA BORATED WATER STORAGE TANK FOUNDATION & TANK REPAIR PROGRAM UNIT 1 TANK 312150011 Construct New Ring Beam 1 (8/12/82) A (7/8/83)

(set forms & place rebar, pour concrete) 312550019 Reinstall Electrical Ductbank 2 (9/17/82) A (4/6/83) 312550018 Reinstall Piping, Pipe Hangers and Electrical Facilities A (3/17/83) miO882-2439d173-163 JEKostielney 10/29/83

9 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR TIIE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITll ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III I REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION UNIT 2 TANK 322150011 Construct New Ring Beam 1 (8/12/82) A (7/8/83)

(set forms & place rebar, pour concrete) 322550019 Reinstall Electrical Duct Bank 2 (9/17/82) A (4/6/83) 322550018 Reinstall Piping, Pipe llangers and Electrical Facilities A (3/17/83) 322150212 Repair Tank Weld Defect R

312150015 Relevel Tank-Unit 1 1 (9/17/82) 312550100 Install Instruments (includes testing and calibration) 1 (11/1/82) 322550100 Install Instruments (includes testing and calibration) 1 (11/1/82) l UNDERGROUND PIPE REPLACEMENT, REBEDDING, AND MONITORING PROGRAM i

PIIASE II PROBING & DEWATERING 1

407050400 Shallow prc5ing for Phase II (Ref DWG C-2031)

A (5/27/83) 400050005 Deep Probing for Utilities Phase II 400050020 Installation of Phase II Dewatering Wells and Piezometers (if required)

TRAIN B 0F SERVICE WATER PIPE REPLACEMENT 4 i

402550446 Excavate Existing Pipe 1 (8/12/82) A (9/07/83) 402550550 Remove Existing Pipe A (9/07/83 miO882-2439d173-163 JEKostielney 10/29/83

10 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 402550560 Install new pipe & expansion coupling A (9/07/83) 402550561 Hydro Test new pipe A (9/07/83) j 402550508 Perform Profiling & Ovality Check on New Piping A (9/07/83) 402550562 Temporary Backfill New Pipe 1 (4/5/83) A (9/07/83)

CONSTRUCTION WORK IN SOIL MATERIAL PROGRAMS PERMANENT INTRUSION DETECTION SYSTEM 732050002 Install Wire (inc1 conduit) 3 (8/25/82) A (8/25/82) 732050003 Install Fence (inc1 fence posts & concrete strip) 3 (8/25/82) A (8/25/82) 732050004 Install Grounding 3 (9/17/82) A (9/17/82)

OBS-4 Repair 522550018 Dutch Cone Soil Testing in Vicinity A (07/28/83) of OBS-4 for exploratory purposes i

EMERGENCY PERSONNEL LOCKS - UNIT 2 792550005 Excavate, rebar, pour concrete and backfill Airlock Structure 1 (9/17/82) A (10/11/83) i m.iO882-2439d173-163 JEKostielney 10/29/83

11 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PERMANENT DEWATERING PROGRAM 522150005 Install Remaining Wells 1 (9/17/82) 522550016 Install electrical equipment & conduit 1 (9/17/82) 522550021 Excavate, install and backfill header piping, electrical 1 (9/17/82) conduit, and pumps (including equipment slabs and metering pits) 522550026 Assemble and wire pump control panels A (9/23/83) 522550014 Excavate Headers & Metering Pits, Install Header and Level Monitoring System, Install Pumps, Timers and Backfill DIESEL FUEL SUPPLY LINES 722050001 Install missle shielding 1 (8/25/82) 722050002 Excavate, remove, reinstall and backfill 1 (11/1/82)

DF0 supply lines DIKE MAINTENANCE 812550010 Normal dike maintenance in Q areas A (5/27/83)

CONTROL ROOM PRESSURIZATION TANK SETTLEMENT MARKERS 932450100 Excavate for, install and backfill Control Room pressurization tank settlement markers miO882-2439d173-163 JEKostielney 10/29/83

12 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN NOVEMBER 1, 1983 and NOVEMBER 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REUISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION MISCELLANEOUS 942450200 Remove (excavation) temporary uncontrolled fill located 1 (7/5/83) 4 (9/27/83) in Q areas (DWG C-45Q) as identified on NCRs and the OGSE action item logs, and backfill per Spec C-211Q 942450250 Locate 4" Borehole, East Side of Turbine Building A (9/27/83)

CATHODIC PROTECTION 752050001 Drill and replace annodes (as necessary) 1 (8/25/82) A (10/6/83) 752050002 Drill and install new annodes 1 (11/1/82) A (10/6/83)

CONTAINMENT TENDON ACCESS VENT IIVAC 802550010 Excavate for, Install and Backfill Electrical Duct 1 (9/17/82)

Bank and Equipment Pad for the Unit 1 HVAC Fan 802550020 Excavate for, Install and Backfill Electrical Duct I (9/17/82)

Bank and Equipment Pad for the Unit 2 HVAC Fan NITROGEN TANK INSTALLATION 782550005 Excavate for, install and backfill electrical duct bank 1 (9/17/82) 782550010 Excavate for, install and backfill piping 1 (9/17/82) 782550015 Excavate for, install and backfill concrete pad 1 (9/17/82) 782550020 Excavate for, install and backfill nitrogen tanks and 1 (9/17/82) associated concrete structures miO882-2439d173-163 JEKostielney 10/29/83 I

1 i

Consusers Power Company Attachment to Serial CSC-6967~

q Midland Plant Units 1 & 2

{

SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1983 AND DECEMBER 31, 1983 i

DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982

)

NEW OR ACTIVITY PREVIOUS REGION III i REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION AUXILIARY BUILDING & FIVP UNDERPINNING PROGRAM BRACE / STRUT E10 & E11 155055320 Install Brace / Strut E10 & Ell BRACE / STRUT W10 & W11 165055320 Install Brace / Strut W10 & W11 EXCAVATION ZONES 1

j 155052070 Excavate / Lag Zone Y3 165052070 Excavate / Lag Zone Z3 i

DOWELS AT FIVP l

155050325 Install dowels at east FIVP 165050325 Install dowels at west FIVP i

LONG DRIFTS 165052375 Complete Drift KC4 to CT1 A (10/19/83)

I 1

155052375 Complete Drift KC9 to CT121 A (10/19/83)

PIER CT3 165052080 Drift To, Excavate, Install & Load Pier CT3,2,3 1

! miO882-2439f173-163 JEKostielney 10/29/83

2 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1983 AND DECEMBER 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III

. REVISED ITEMS IDENTIFIER PROGRAM, WORK 1REA & ACTIVITY DESIGNATION PIER CTIO 155052080 Drift To, Excavate, Install & Load Pier CT10,2,3 1

PIER E5 155052060 Finger drift and demo mudmat on Col 9 to J, excavate & install Pier E5,2,3 1

PIER W5 165052060 Finger drift and demo mudmat on Col 4 to J, excavate & install Pier W5,2,3 1

PIER E5 SUPPORT COLUMNS & GRILLAGE 155055020 Excavate for & install support columns next to containment & install and load grillage structure at Pier E5.

(Including Instrumentation)

PIER W5 SUPPORT COLUNNS & GRILLAGE 165055020 Excavate for & install support columns next to containment & install and load grillage structure at Pier W5.

(Including Instrumentation)

PIER KC5 165052340 Finger drift to, excavate, install & load Pier KC5.1,2,3 A (10/19/83) m-iO882-2439f173-163 JEKostielney 10/29/83

3'

. Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 t

p SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1983 AND. DECEMBER 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 i

r i

NEW OR ACTIVITY PREVIOUS REGION III j REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION i

PIER KC8 l

155052340 Finger drift to, excavate, install & load Pier KC8.1,2,3 A (10/19/83) i I

J PIER E15 1

f 155052045 Drift to/ access pit at Pier EIS, excavate and install Pier E15.

A (10/19/83) i i

PIER W15 165052045 Drift to/ access pit at Pier W15, excavate and install Pier W15.

A (10/19/83)

PIER E16 l

155052055 Access pit at Pier E16. Excavate, install and load Pier E16.

A (10/19/83)

I PIER W16-165052055 Access pit at Pier W16. Excavate, install and load Pier W16.

A (10/19/83)

PIER E17 155052075 Drift to Pier E17 from E16. Excavate, install and load Pier E17.

A (10/19/83) 1 PIER W17 I

t 165052075 Drift to Pier W17 from wl6.

Excavate, install and load Pier W17.

A (10/19/83) 1 SERVICE WATER PUMP STRUCTURE UNDERPINNING PROGRAN l

]

202550163 Remove abandoned fire protection pipeline (as necessary) 1 (11/1/82) A (5/27/83) l mi0882-2439f173-163 JEKostielney 10/29/83 i

4 Consumers Power Company Attachment to Serial CSC-6967 Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN DECEMBER 1, 1983 AND DECEMBER 3',,

1953 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION REBEDDING PHASE II 400050110 Install Soldier Beams Phase IIA 400050400 Install Sheeted Pits Phase IID 400050200 Install Sheeted Pits Phase IIB 400050300 Install Sheeted Pits Phase IIC PIER 1 207053005 Excavate, install and load Pier 1 207050005 Set up and perform plate load test Pier 1 PIER 1A 207053010 Excavate, install and load Pier IA CONCRETE SWPS FLOOR TRENCH 200054000 Concreting of SWPS North Floor Trench and core drilling of through anchor bolt holes.

CONSTRUCTION WORK IN SOIL MATERIAL PROGRAMS MISCELLANEOUS 912450100 Repair Condensor Drain Line 2YBJ-8 miO882-2439f173-163 JEKostielney 10/29/83

I FOOTNOTES 1 Drift Activity normally includes 1.

fabricate steel sets 2.

excavate 3.

install steel sets (Hilti bolts as necessary) l 4.

remove concrete (as necessary) 5.

localized dewatering (as necessary) 6.

Install wood lagging 7.

place mudmat 8.

stabilize soil (as necessary) 9.

brace and/or rebrace 10.

concrete invert 11.

slope layback 2 Excavate Pier activity normally includes 1.

excavate 2.

concrete removal (as necessary) 3.

dewatering (as necessary) 4.

fabricate steel lagging 5.

install steel lagging 6.

auger bottom of pit to determine hydrostatic water pressure & plug (piers 10 & 12 E&W) 7.

place mudmat 1

8.

stabilize soil (as necessary) 3 Install'& load Pier activity normally includes 1.

fab & install embeds 2.

fab & install reinforcing steel 3.

install telltales 4.

install Carlson meters (pier 11 E&W) 5.

place concrete 6.

fab & install leveling & bearing plates, jackstands 7.

install jacks 8.

transfer load.

  • 9.

monitor and adjust pier jacks after load transfer 4 These activities have been broken down into Train A and Train B.

They were previously combined under the title " Train A & B of Service Water Pipe Replacement."

s Excavate Access Shaft Activity Normally Includes:

1.

excavate 2.

fabricate and install steel lagging 3.

fabricate and install structural steel supports and bracing 4.

place mudmat 5.

stabilize soil (as necessary) 6.

localized dewatering (as necessary) 7.

support and protect utilities miO882-2439b173-163 I

l

2 6 Activity 207050620 was incorrectly given the designation of "R"

on two previous reports. The approval for this activity was given on 5/27/83 and work had started before the 90-day period.

This report is giving the activity a correct status.

9 l

l i

i miO882-2439b173-163

1 NOTES A single asterisk (*) in left hand column indicates the work activity is a new item.

A double asterisk (**) in left hand column indicates the work activity description has been revised.

Designation 1 in the right hand column indicates additional information is required by NRC Region III on this critical activity.

Designation 2 in the right hand column indicates no additional information is required by NRC Region III on this critical activity.

Designation 3 in the right hand column indicates that the activity is not critical and work can proceed.

The date shown after the designation corresponds to the date of the NRC letter that provided the designation.

An "A" following the designation indicates that Region III has provided approval to proceed with the activity.

The date following the "A" corresponds with the date of the NRC letter that provides authorization to proceed with the work activity.

A "R" in the right hand column indicates that previous designation or approval has been recinded because of a significant revision to the work activity or 90 days has elapsed or is expected to elapse since the work was authorized without the work being initiated.

miO882-2439e173-163