x Commonwealth Edison M/8 i
- f '*
[
.) one First National Ptzt. Chic:go, Illinois 2
a 7 AddrIss R: ply to: Post Othca Box 767 (Q/ Chicago, ll'inois 60690 October 24, 1983 Mr. James G. Keppler, Regional Administrator
- Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Quad Cities Station Unit 2 Response to IE Bulletin No. 83-03 Action Item 5 NRC Docket No. 50-265 References (a):
IE Bulletin No. 83 R. C.
DeYoung letter to All OLs and cps dated March 10, 1983 (b):
P. L. Barnes to J.G. Keppler letter dated June 7, 1983 (PLB 83-62)
(c):
P. L. Barnes to J. G. Keppler letter dated October 24, 1983 (NL-83-0348)
Dear Mr. Keppler:
Reference (a) Action Item 5 requested that the Commonwealth Eoison Company provide, within ninety (90) days of completion of Action Item 3, a written report of inspection results.
We have completed Action Item 3 for Quad Cities Unit 2.
The Unit 2 Diesel Generator Cooling Water Pump (DGCWP) discharge check valve 1-3999-66 was inspected during an outage on October 12, 1983.
Inspection of the valve on disassembly found the disk hinge pin to be missing.
The disk and valve body appeared to be in satisfactory condition.
The hinge pin will be replaced.
The DGCWP will be tested for operability after returning it to service.
To the best of my knowledge and belief the statements contained in the Attachment are true and correct.
In some respects these statements are not based on my personal knowledge but upon information furnished by other Commonwealth-Edison employees, consultants, and contractor.
Such information has been reviewed in sjjl070205e31024 A
,l ZE#
h u,i e M3 -
01:L261983 i
p-(* accordance with Company practice and I believe it to be reliable.
Please address any questions that you or your staff may have concerning our response to IE Bulletin No. 83-03 to this office.
Respectfully, P.
L. Barnes Nuclear Licensing Administrator cc:
USNRC Document Control Desk Washington, DC 20555 RIII Inspector - QC SUBSCRIBED and SWDRN to before me this o74/dday of dif$
1983 (pwL a. 9M
~
Notary Public 7513N