ML20081F462

From kanterella
Jump to navigation Jump to search
Public Version of Rev 10 to Emergency Plan Implementing Procedure Erpip 4.1.17, Security Team Leader
ML20081F462
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/11/1983
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20081F467 List:
References
ERPIP-4.1.17-03, ERPIP-4.1.17-3, NUDOCS 8311030011
Download: ML20081F462 (11)


Text

-

N~

ERP!P 4.1.17

. Rev.10 (Ya. u f d 5 /i/ 6 SECURITY TEAM e

ge RESONSIBLE INDIVIDUAL :

SECURITY Team Leader q -3 g1 CONDITION:

Alert Site Emergency General Emergency

- CAUTION -

Failure to consult the Radiation Protection Director during an emergency may result in undue radiation exposure to personnel and violation of ALARA principles.

- NOTE -

Order of actions is not mandatory.

Initialing step completion must not delay action.

ACTION:

/

Signature Date 1.

DISPATCH security representative to OSC.

Action Complete 2.

INTERROGATE the personnel recall answering system (ref.

Action Complete

- ), complete Attachment 2.

l 3.

CALL Emergency Personnel listed on Attachment 2 (SEC &

Action Complete PS first) to satisiy quota. Note: Recall quota in 60 minutes.

4.

ESTABLISH access control point on access road (s) at site Action Complete boundary.

5.

At Access Control Point:

ADMIT expected emergency vehicles.

(STEP CONTINUED ON NEXT PAGE) 8311030011 831026 PDR ADOCK 05000317 PDR g

ERPIP 4.1.17 Rev.10 STOP non-emergency vehicles.

INFORM plant workers (CategoriesA thru D) to report directly to assembly areas.

DENY access to plant visitors, unless authorized by OSC Director /SEC.

IF PLANT EVACUATION is ordered, ADMIT only Category A and B personnel unless entry is authorized by OSC Director /SEC.

RECORD, on Attachment 4, name and destination of personnel granted access.

I 6.

ACCOUNT for visitors signed in at South Processing Action Complete Building.

7.

SEARCH areas for personnel.

Action Complete Visitors Center Record visitors names / addresses on Attachment 5.

Escort off-site; close center.

Farm plots /bulldings Direct to Farm Demo Building.

Record names on Attachment 5.

Waterfront Direct to appropriate assembly area.

Camp Canoy Direct personnel to Camp gate.

Close Camp.

Warehouse, laydown areas, etc.

Direct to appropriate assembly area.

8.

UNLOCK emergency equipment in South Processing Building.

Action Complete 4

9.

UNLOCK Alternate Emergency Control Center.

Action Complete

10. INTERROGATE security computer 25 minutes after emer-Action Complete gency is declared. DETERMINE personnel remaining In Protected Area.

2

ERPIP 4.1.17 Rev.10

11. REPORT accountability to SEC as soon as practicable.

Action Complete

12. SEARCH for missing persons.
13. Control Protected Area access / egress:

ADMIT ONLY catagory A and B workers unless cleared by OSC Director /SEC.

- CAUTION -

Undue delays for Dosimetry issue may endanger life or equipment.

ISSUE Dosimetry to arriving emergency workers; complete Attachment 3.

WAIVE expected emergency vehicle searches.

ESCORT emerg-ncy vehicles. Only first of several vehicles going to a single location requires escort.

ALLOW emergency workers leaving protected area to keep their dosimetry.

14. ASSIST other emergency workers whenever possible.
15. FORWARD this checklist and all records related to this emergency to Supervisor-Emergency Planning Unit.

6 3 of 3

ERPIP 4.1.17 Rev. 10 ATTACHMENT 1 PAGER ANSWERING MACHINE INTERROGATION 1.

Write the digital tape counter number on Attachment 2.

2.

Press " REWIND" button.

3.

Press " PLAY" button when tape counter reaches zero.

4.

Note responses on Attachment 2.

4.

Press "STOP" button when tape counter reaches the number noted in Step 1 above.

5.

Press " AUTOMATIC" button.

~

9 e

ERPIP 4.1.1/ REY.10 ATTACHMENT 2 Tape Counter 3 Page 1 of 2 Tape Counter 2 DATE:

Tape Counter 1 WORK PAGER CALL TITLE HOME PHONE PHONE NUMBER QUOTA NAME BACK Site

-ONE-

3. A. Tiernan Emergency R. E. Denton Coordinator
3. M. Moreira S. E. Jones i

-ONE-L B. Russell i

Plant Superintendent 3. T. Carroll R. P. Heibel i

Plant

-ONE-R. L Wenderlich Superintendent 3. R. Hill i

Assistant

3. M. Yoe Radiation

-ONE-N. L. Millis Protection 3. T. Carlson l

Director B. A. Watson l

i Radiological

- THREE -

E. T. Reimer

! / essment L 3. Smialek sirector P. T. CrInigan j

A. G. Miranda j

K. 3. Nietman l

l l

Technical

- ONE -

D. W. Latham Support Center 3. A. Mihalcik Director M. 3. Miernicki Core i

Engineers

-ONE-M. E. Bowman 3. P. Steelman Operational

-ONE-S. M. Davis C. R. Mahon l Support Center Director R. T. Jennings Chemistry

-ONE-G. E. Brobst Director R. E. Sprecher

3. M. Bills

^

I l

dicated

- TWO -

A. M. Vogel

~ Phone L L. Weckbaugh

@ommunicators G. F. Wall l

Elect. Engr.

- ONE (1) -

E. R. Bauer

-w.

m

  • ERP!P 4.1.17 Rev.10 ATTACHMENT 2 Tape Counter 6 J

Page 2 of 2 Tape Counter 9 i

DATE:

Tape Counter 4 WORK PACER CALL YlTLE HOME PHONE,

PHONE NUMBER QUOTA NAME BACK sams

-s simetry F.EKbmm J. Brown ate ac

-ON Access M. T. W. Denham j

l e-entry M. T. S. D. Koranek l

On-Site

- THREE -

Hutson M. T. G. P. Phair B. F. Sears WO-erry qu:d Release W. B. Radford M. T.

W. D. Sewell Site

-F M. T. E. H. Roach 1

L. H. St.Laurent i

C. H. Griffin R. Wyvill P. Wright 1

D. F.Harshbarger First Aid

-ONE

-O o

ectri gr.

. Engtneer

-ONE-L. O. Wenger B. C. Rudell T

- FOUR -

J. A. Snyder Inst. Maint. H. E. Winter G. Q. Murray R. D. Elliott D. P. Buder

3. G. Sites j

l ERDCT Elect. Maint. 3. A. Crunkleton K. M. Riggleman R. F. Weekly ERDC

-ONE-R. P anko Mech. Maint. D. A. Ensor R. W. Talley W. L. Whitaker l

F. M. Bruce P. 3. Boote i

f M. J. Warren teate I

, A. A. Barth Phone Comm.

A. G. Bukowski l

K. M. Hof fman l

R. M. Lloyd

[

l E. L. Campo W. E. Putman 1

_ m-e ~ n _ _. a m __ _ _ _a <.__ _ _, nw ( n,

CJ, Anriecm _

ERPIP 4.1.17 Rev.10 ATTACHMENT 3 BALTIMORE GAS & ELECTRIC COMPANY CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY DOSIMETRY ISSUE Dr.te:

ENTRY EXIT SRD ISSUED NAME & SOCIAL SECURITY #

SRD READ TLD #

READING BY:

TIME OF EMERGENCY PERSONNEL READING SY (NAME)

TIME I

I f

L Dosimetry removed from protected area:

(

) Yes

(

)No

a m,<

s_.

k e

ERPIP 4.1.17 Rev.10 ATTACHMENT 4 PERSONNEL ACCESS Date TIME NAME DESTINATION IN OUT 4

e t.

=

=

. ~ - - - -.

ERPIP 4.1.17 Rev.10 ATTACHMENT 5 i

PERSONNEL LIST j

Date NAME ADDRESS I

e I

i I

i e

h i

l l

ERPIP 4.1.17 REV. 10 CALVERT CLIFFS NUCLEAR POWER PLANT EMERGENCY RESPONSE PLAN IMPLEMENTATION PROCEDURES ERPIP PAGE REV.

I 10 2

10 10 10 to attachment 3 to 10 1

10 1

l; p

A

..)

s

~ - - -

,~

~

a

,,._,m-

-_nv,,

m-p.,_,

. ~..

s

=

1

-~

..l t

r

,ERPIP 4.1.17 REVIEW / APPROVAL 5

REVISION CHANGE REVIEWER SIG/

SUPERVISOR POSRC PLANT SUPERINTENDENT i

DATE EPU SIG/DATE MTG

/DATE l

laDV

.YtN&bt L. - E.2-14I D.fil lik/7z

/-

b I4 33 CT Sb t, ud/ / / s.

3dM"// W&lk n-n lak bdin io f

'I O

e e

n 4

l t

u i

(.

l-e I-l

.n$

(

L

.y

'e,'. [ e

.I e

e ee&-

4,"*

e o N,'

.~.-t #'3F

.. -f

..___._.--,.~.._7_=5' "I

-., -.,g

.,,e F -

8