Forwards Revised Physical Security Plan & Plant Security Personnel Training & Qualification Plan.Encl Withheld
ML20081F181
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/14/1995
From: Walter MacFarland
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9503220025
Download: ML20081F181 (2)


Text

' Walter G.MacFarland,IV, P.E. '

i*

Vica Presdent i8 L '

t.irnenck Gener; tog Staten PECO ENERGY "RJ"rg""~

o Sanatoga PA 19464 0920 610 718 3000 Fax 610 718 3008 Pager 1800 352 4732 #8320 10CFR50.54(p)

March 14,1995 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, DC 20555-

SUBJECT:

Limerick Generating Station, Units 1 and 2 Submittal of Revisions to the Physical Security Plan and Plant Security Personnel Training and Qualification Plan

Dear Sir:

This letter submits, in accordance with 10CFR 50.4(b)(4)(iii), four (4) controlled copies of the revised Limerick Generating Station (LGS) Physical Security Plan and Plant Security Personnel Training and Qualification Plan. The revisions are detailed in the summary of the Plan revisions.

These revisions are being submitted in accordance with 10CFR 50.54(p)(2), and have been determined not to decrease the effectiveness of the LGS Physical Security Plan or Plant Security Personnel Training and Qualification Plan. The changes to the Physical Security Plan reflect changes associated with qualifications for the Supervisor of Personnel Processing. The Plant Security PersonnelTraining and Qualification Plan changes primarily reflect organizational and title changes and an enhancement to the weapons course of fire.

In accordance with 10CFR 73.21, we request that the enclosed revisions to the LOS Physical Security Plan and Plant Security Personnel Training and Qualification Plan, which contain Safeguards Information, be withheld from public disclosure and protected as described in 10CFR 73.21. This tevision to the Physical Security Plan is numbered February 1995, Issue 2, Rev. 3. The revision to the Plant Security Personnel Training and Qualification Plan is numbered February 1995, Issue 2, Rev. O.

Very truly yours, h,

0 kc65 h % d d Attachments T.T. Martin Administrator, Region 1, USNRC (w/att) cc:

N.S. Perry, USNRC Senior Resident Inspector, LOS (w/o att) 9503220025 950314 I

hDR ADOCK 0500035 l

PDR

b' bec:

(w/o attachments)-

D. M. Smith 63C-3 C. L.. Adams SMB2-4 R. W. Boyce GML5-1 J. L Kantner SMB3-1 J. B. Cotton 53A 1 G. A. Hunger 62A 1 M. A. Karney TSC1-2 Correspondence Release Point DAC PA DER BRP Inspector SMB3-1 (w/ attachments)

G. A. Bird PB Support SC1-1 e