Affidavit of Rl Lykens
ML20081F137
Person / Time
Site: Midland
Issue date: 10/21/1983
From: Lykens R
STONE & WEBSTER ENGINEERING CORP.
To:
Shared Package
ML20081F127 List:
References
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8311020360
Download: ML20081F137 (5)


Text

. .

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-329 OM CONSUMERS POWER COMPANY 50-330 OM (Midland Plant, Units 1 and 2 Docket No. 50-329 OL 50-330 OL February 14, 1983 )

AFFIDAVIT /

e My name is R,4ert /. 4 4-,u I am employed by Stone & Webster Engineering Corporation as Jeh f ce /

  1. 7 ,rer .

I am currently assigned to the team which is conducting an independent Prior to being assessment of soils work at the Midland Nuclear Plant site.

given this assignment, I have never worked on any job or task associated with the Midland Project, or any job or task for or on behalf of Consumers Power Company, Bechtel, or the Mergentime Company relating to soils of underpinning.

IhaveneverbeenemployedbyConsumersPowerCompany,BechteliorMergentime Company. I do not own any shares of Consumers Power Company, Bechtel, or Mergentime stock. Mutual funds or other funds in which I may have a

- beneficial interest, but over which I have no control, may own shares of Consumers Power Company, Bechtel, or Mergentime stock, of which I am unaware.

I have no A list of such funds in which I have an interest are attached.

relatives which are or have been employed by Consumers Power Company, Bechtel, or Mergentime Company.

Sworn and Subscribed Before Me This dhJt, M d & C 'vM j (Cgy to CK. L(NYd hftA GOM Notary Public My Commission Expires bMOl s <

+.z- m es y J dp 2 dW lvos a,Aeyn & '

</n. .z- Loe - &~,,,% u > ,-n]. c.u/s.w

\ aff sJu 8311020360 831027 PDR ADOCK 05000329 A PDR

,o-i May 1983 LYKENS, ROBERT L.

SENIOR QUALITY CONTROL ENGINEER FIELD QUALIIT CONTROL DIVISION EDUCATION University of Tennessee - Engineering (one year only)

U. S. . Military Academy (West Point) Bachelor of Science in Military Science (Engineering) in 1954 LICENSES AND REGISTRATIONS Registered Professional Engineer, State of Alabama,1964 EXPERIENCE SUKHARY Mr. Lykens joined Stone & Webster Corporation (SWEC) in April 1983 as a Senior Quality Control Engineer.

Prior to joining SWEC, Mr. Lykens was a Project Engineer with Arabian American i_

' Oil Company where he monitored and approved design and procurement activities of the Architect-Engineer for projects in Saudi Arabia.

Mr. Lykens was the Quality Control Manager for Exxon Nuclear Idaho Company at Idaho National Engineering Laboratories for construction of a nuclear fuel storage and reprocessing facility.

i EMr. Lykens' employment with Exxon was preceded by 8 years with Bechtel Power Corporation where he was assigned Project Field Quality Control Engineer, Field Engineer, and Construction Superintendent (Civil) on various nuclear power plant construction projects.

Prior to join'ing Bechtel, Mr. Lykens was associated with Boeing Company as a Ee-chanical Systems Test Engineer and Test Conductor on ground support equipment in the Apollo Space Program.

i Before joining Boeing, Mr. Lykens assumed project engineering responsibilities with 4

several firms in the development of the space center in Florida. This work involved studies in-logistics, transportation, market research and contract management.

Prior to entering the space program, Mr. Lykens was an officer in the U. S. Army following his ' commission from the U. S. Military Academy.

1

984277-P 1'

o

- , - - , - - . , , n , , ,, , ,, , , , , -n- - , , . . . . , , - , ,-.,n.,,-,--n,,,,,n-,,,- ..-n. - - -

i DETAILED EXPERIENCE RECORD LYKENS, ROBERT L. 02559 STONE & WEBSTER ENGINEERING CORPORATION, OAK RIDGE, TN (Apr 1983 to Present)

Appointments:

Senior Quality Control Engineer - Apr 1983 Clinch River Breeder Reactor Plant Project, U.S. Department of Energy (Apr 1983 to Present)

As SENIOR QUALITY CONTROL ENGINEER responsible for training and supervision of all Civil Field Quality Control . (FQC) Engineers, Assistant Engineers, Inspectors, and Technicians for all site monitoring, testing, and acceptance inspection for earth fill placement, blasting, rock-bolting, rebar placement, concrete placement, structural steel erection, coatings, laboratory testing, and other work within the Civil Field Quality Control area of responsibility. Coordinate with Construction to Supervision, Construction Engineering, the Architect-Engineer (AE) and the client resolve problems, conflicts, and nonconformances in order to insure that the work conform,s to drawings, specifications, and codes and standards.

ARABIAN ANIRICAN OIL CCMPANY, HOUSTON, TX (Nov 1980-July 1982)

Appointments:

. Project Engineer - Nov 1980 As PROJECT ENGINEER responsible for monitoring, reviewing, and concurring with the design-and procurement activities of the Architech-Engineer for projects to be constructed in Saudi Arabia (pipelines, pump stations, and seawater treat'aent plant).

Also assisted in contract development and negotiations; performed liaison with field operating organizations; and developed operating and precommissioning manuals.

EXXON NUCLEAR IDAHO COMPANY, IDAHO FALLS, ID (June 1979-June 1980)

Appointments:

Projects Quality Control Manager - June 1979 As -PROJECTS QUALITY CONTROL MANAGER responsible for training and supervising thirty engineers and inspectors of all disciplines and developing and implementing a qual-ity control program and procedures for modifications and expansion to the Idaho chemical processing plant for processing nuclear waste and construction of a new nuclear fuel processing and storage facility.

1 984277-P

~ - -- . ,

g. -

BECHTEL POWER CORPORATION, SAN FRANCISCO, CA (June 1971-June 1979) j.

i Appointments:

~ Quality Control Engineer - June 1971 Project FQC Engineer - Jan 1972 Field Engineer / Construction Superintendent - June 1975 Lead Civil Quality Control. Engineer - June 1976 Davis-Besse' Nuclear Power Station,' Toledo Edison and Cleveland Electric and Illuminating Co. (June 1971-June 1974)

I As a QUALITY CONTROL ENGINEER (June 1971-Jan 1972), responsible for surveillance of

[ quality control programs. of all civil / structural contractors at the 900 MW Davis-f' Besse,' Unit 1.

As PROJECT QUALITY CONTROL ENGINEER (Jan 1972-June 1974), responsible for training and f supervision of quality control engineers, all disciplines and implementation

~

of the construction management quality control program at the Davis-Besse Project.

I. Turkev_ Point Nuclear Power Station, Units 3 and 4, Florida Power & Light I (June 1974-June 1976) r As PROJECT. QUALITY CONTROL ENGINEER (June 1974-June 1976), responsible for imple-menting the quality control program for construction of rad-waste facility and t modifications to two operating nuclear power plant units.

] As CIVIL FIELD ENGINEER / SUPERINTENDENT (June 1975-June 1976), at Turkey Point re-sponsible for resolution of construction / design problems in the field and for j- planning and coordinating the work of all civil and structural craf ts in nuclear i power plant modifications and expansions.

F Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Arizona Public Service l- (June 1976-June 1979)

[ As LEAD CIVIL QUALITY CONTROL ENGINEER was responsible for training and supervising sixteen quality control engineers and Laplementing the quality control program for all civil structural work in the construction of three 1300 MW units at Palo Verde, THE BOEING COMPANY (BOEING ATLANTIC TEST CENTER) MERRIT ISLAND LAUNCH AREA, FL (June 1965-June 1970)

Appointments:

Systems Test Engineer - June 1965 Test. Conductor - Sept 1967 As SYSTEFG TEST ENGINEER (June 1965-Sept 1967), responsible for fabrication, testing, maintenance, and operation of high pressure pneumatic and hydralic control systems

forl ground support equipment and crogenic service systems for the Apollo launch i vehicle. Member of launch team for several lunar landing launches.

2

{

, 984277-P l

_ . _ . . _ . . _ . _ . _ - _ . _ _ _ _ . . . _ . . _ . . _ _ _ . . _ . . . . _ . _ _ _ . ~ . _ . _ .

C'

~

As TEST CONDUCTOR (Sept 1967-June 1970), responsible for achieving and maintaining launch readiness for all. ground support equipment during test and launch countdown of

.the Apollo launch vehicle. Monitored ground support firing room panel which sum-marized firing status of panels of approximately 25 systems engineers. Coordinated

- with Chief Test Conductor concerning launch configuration during mission countdown (Mechanical Engineer) .

BROWN ENGINEERING COMPANY, CAPE CANAVERAL, FL (Mar 1963-June 1965)

Appointments:

Engineer - Mar 1963 r

Project Engineer - Dec 1963 As ENGINEER (Mar 1963-Dec 1963), performed studies to assist NASA counterparts in determination of space center support requirements, i.e., transportation, food ser-vices, medical facilities, logistics, and maintenance.

As PROJECT ENGINEER (Dec 1963-June 1965), responsible for designing total food ser-vices system, to include facilities and operations, for the space center in Florida.

Developed specifications for all equipment and procured equipment.

THIOKOL CHEMICAL COMPANY, REDSTONE ARSENAL, AL (Aug 1962-Mar 1963)

Appointments:

~

Facilities Engineer - Aug 1962 As FACILITIES ENGINEER performed studies to determine costs for new facilities and modifications to facilities requested by operating departments of manufacturer of solid propellant rocket motors.

MARTIN-MARIETTA CORPORATION, DENVER, CO- (Apr 1961-Aug 1962)

Appointments:.

Manufacturing Engineer - Apr 1961 As MANUFACTURING ENGINEER developed interface control documentation to insure com-patibility between underground launch silos with to-be-installed Titan II ICBMs.

-CONS 0ER-TOWNSEND & ASSOCIATES, NASHVILLE, TN (Aug 1960-Apr 1961)

Appointments:

Assistant Resident Engineer - Aug 1960 As ASSISTANT RESIDENT ENGINEER performed soil tests, concrete tests, surveying, and maintained schedule progress in-place construction materials quantities for construction of municipal airport.

3 984277 P