Forwards Summary of Remedial Soils & Const Completion Program 831013 Monthly third-party Assessment Meeting Re Status of Independent Assessment of Underpinning & Remedial Soils Work
ML20081F104
Person / Time
Site: Midland
Issue date: 10/24/1983
From: Amoruso A
STONE & WEBSTER, INC.
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8311020350
Download: ML20081F104 (10)


Text

-.

/PRlij0 LEAL STAFF V?A r<f 32 e

v STONE & WEBSTER MICHIGAN, INC.

Tw w

<C l

P.O. box 2325. BOSTON. M ASS ACHUSETTS O2107 30 WS re x

/_

43 ENr

,Fi10 (fay' Mr. J. J. Harrison October 24, 1983 4

Nuclear Regulatory Commission J.0. No.

14509 799 Roosevelt Road Glen Ellyn, IL 60137 RE: DOCKET N0. 50-329/330 MIDLAND NUCLEAR COGENERATION PLANT MONTHLY THIRD PARTY ASSESSMENT MEETING The protocol governing communications for the Remedial Soils and Construction Completion Programs at the Midland Plant, specifies a monthly meeting to discuss thiro party assessment activities and assigns preparation of the minutes of those meetings to Stone & Webster.

Enclosed are minutes of the meeting held on October 13, 1983.

[ffzuw-A. P. Amoruso CIO Project Manager Enclosure APA/ka cc: JWCook, CPCo DLQuamme, CPCo DCT3 1 1983 8311020350 831024 s

DR ADOCK 05000 hbf h

. p-MINUTES OF THE 11EETING ON OCTOBER 13, 1983 STATUS OF INDEPENDENT ASSESSMENT OF UNDERPINNING AND REMEDIAL S0ILS WORK

' Purpose To discuss Third Party Overview activities of Stone & Webster (S&W) and problems encountered regarding underpinning and remedial soils work.

Summary Mr. A. S. Lucks, Project Manager for the Independent Assessment of Under-pinning and Remedial Solis Work, presented a summary of the assessment pro-gram for the past year. Highlights follow:

  • Assessment Team has been on site for over twelve months.
  • The scope of work for the Assessment Team includes overviewing the construction of the underpinning and all remedial soils activities, the Quality Assurance activities associated withthe underpinning and remedial soils activities, and reviewing the Work Activity Packages for completeness.
  • The Assessment Team includes staff with expertise in.Geotechnical Engineering, structural engineering, Quality Assurance, construction, and underpinning.

' The underpinning activities are proceeding on a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> day, 7 days per week schedule and the Assessment Team operates as'two units to provide 7 day coverage. One unit is headed up by W. E. Kilker, the second unit is headed up by P. J. Majeski.

  • The Assessment Team submits weekly reports, Nonconformance Identification Reports (NCRs) a 1d periodic summary reports directly to the NRC with copies to Consumers Power Company (CPCo).

t

Minutes of Meeting PAGE 2

  • To-date 16 underpinning piers have been installed for the Auxiliary Building underpinning and the first set of grillages have been installed.
  • Work at the Service Water Pump Structure (SWPS) has included installation of the soldier piles and dewatering systems in prepar,ation for underpinning.
  • Preparations are in progress for the extension of the Borated Water Storage Tank foundations.
  • The Assessment Team has had the opportunity.to see most of the operations nece'ssary for the underpinning work.
  • A total.of 55 weekly reports, 15 NCRs and a 90-Day Summary report have been issued.

Based on activities during the past twelve _ months, the Assessment Team has_the.

following observations:

  • The underpinning that has been installed is of a very high quality.
  • The Quality Assurance staff are performing as an effective quality organization.
  • All of the organizations involved in the underpinning have demonstrated a positive attltude and concern,towards quality.
  • The instrumentation system installed to monitor building movements adds l

to the confidence in the success of the underpinni,ng work.

  • Both CPCo and Bechtel have been responsive to the requests and needs of the Assessment Team.
  • Currently 14 of the 15 NIRs have been closed out. Seven of the NIRs

.were related to Specifications or Construction Procedures, six were i

related to QA Procedures, and two were hardware related.

.~. -_

l l

Minutes of Meeting i

PAGE 3

  • From time-to-time the Assessment Team has stated that the completions of underpinning piers, from excavation to load transfer, should be accomplished in a more t'imely manner. This item is still,of concern to the Assessment Team, although some improvement has taken place and Quality has not been impacted.

Mr. W. E. Kilker presented a description of the major underpinning activities during the previous month. Highlights follow:

  • The installation of the Pier 8 grillage beams on the east and west ends of the Auxiliary Building was the major underpinning activity during the month. They were installed in accordance with project procedures, and the Assessment Team was particularly impressed with the teamwork i

demonstrated during the load transfer to the beams.

  • Progress was made in obtaining. access for underpinning activities through the Utility Access Tunnels. The soil stabilization by grouting is being effectively accomplished. Grout takes are high.
  • Outstanding NCRs on the reinforcing steel for the BWST foundations have been resolved and. installation of the reinforcing steel has begun.
  • At the SWPS the installation of the soldier piles is almost complete and initial testsof the dewatering systems suggest that it may be more effective than anticipated.
  • Miscellaneous activities have included installation of cathodic protection systems, removal of two 36 inch casings, piezometer installation and soil investigation work.
  • During the installation of a piezometer there was an incident of drilling into a beam that extends from the Auxiliary Building. A stop work order was issued on drilling and the occurrence was investigated.

In the future, structural drawings will be reviewed, in addition to utility

Minutes of Meeting PAGE 4 drawings, before a drilling permit is issued.

  • One NCR was issued during this period.

It concerned certification of QC supervisors.

This NCR has been closed.

  • Five Work Activity Packages were reviewed and Assessment Team questions were satisfactorily resolved.

Questions and Answers

  • Mr. J. J. Harrison (NRC) asked if Stone & Webster tracked commitments made by CPCo in closing open items from the daily meetings, for example, Item 52-14. A check by the NRC had shown that some six weeks after the commitment had been made the drawing had not been changed. Mr. W. E. Kilker (S&W) replied that Stone & Webster does not track an item after closing, but the item would be brought to CPCo 5ttention if the drawing were to be used for crnstruction without' the change being made.

R. A. Wells (CPCo) stated that if it is flagged on a formal quality document it would be tracked.

J. A. Mooney (CPCo) stated that he will check on the CPCo tracking process.

Mr. R. Landsman (NRC) canmented that a drawing with a detail noted as Non-Q had been identified and this also had not been corrected.

  • Mr. J. J. Harrison (NRC) remarked that daily meeting notes indicated that an item on a drawing was only a suggested method and not a i

requirement and asked why it was shown on the drawing, if it is only a suggestion. Mr. W. E. Kilker (S&W) stated that the procedure associated with this item points out that it is a suggested method.

Mr. J. A. Mooney (CPCo) stated that he will check on-this item.

  • Mr. J. J. Harrison (NRC) commented that in weekly report No. 49, the Assessment Team suggested a solution to possibly avoid problems with welding. This suggestion had also been made in weekly report No. 30.

Minutes of Meeting PAGE 5

/

l t

)

,e He asked why had CPCo not acted sooner J. A. Mooney (CFCo) stateo L

that they had reviewed the situation and had thought that the existing procedure was adequate but that this was' subsequently not the case-and the suggested change had been implemented. Mr. W. E. Kill'ef. (S&W) con- '

/

firmed that the change was being made.

  • Mr. R. B. Landsman (NRC) asked if the lag'ging spacing problerr had been

/

He noted thatit had appeared again in recent weekly rbports."

/

solved.

Mr. W. E. Kilker (S&W) stated that at the Auxiliary Building,'the

/

Contractor had opened up the lagging spacing as requested by the Assessment Team.

The latest occurrence was at the SWPS and the problem has now been addressed.

  • Mr. R. 8. Landsman (NRC) asked what is being done to resolve the Ienting problems associated with the grouting of bearing plates.

Mr. W. E. Kilker (S&W) stated that the Assessment Team was tracking this-problem.

It occurs when the foundation surface is very irregular, i

~

~

and the Assessment Team is aware that the Contfactor is expending considerable effort to solvethe problem. The inspection of the cured.

l l

grout is being perfonned very carefully.

  • Mrs. Sinclair, member of public, asked Mr. J. J. Harrison (NRC), if he was satisfied with the answer to the question on tracking commitments used in closing items from daily meetings. Mr. Harrison stated that CPCo hadcommittedtotrackingthoseitems;however.thesubjectwouldhave l

to be discussed further at the next monthly meeting.

l l

l i

I t

5.

  • y 3

w.

!'~

Minutes of Meeting PAGE 6 I

e.,

4 T

Action Items l

  • CPCo will review the implement 6 tion of com:nitments made to close out daily meeting items

/!

Stone & Webster Will refine the tracking system for open items.

l 6

O

$( ; l'

.e'

[.

. ^

r 3

s' i

k at

, ',)

d t

Is r

i 5,

f

, k

~ _

y, lr i

e s

?

?

  • /

1 r

9 n,

n.. -, -,

-, -, -,.,,, - -, - - - - -,,,. - - ~ -,. - - -

--g

,p MINUTES OF-THE MEETING ON OCTOBER 13, 1983 STATUS OF CONSTRUCTION IMPLEMENTATION OVERVIEW (CIO) PROGRAM Purpose To discuss Third Party.0verview activities of Stone & Webster (5&W) and problems encountered regarding the Construction Completion Program (CCP).

Summary i.

Mr. A. P. Ardoruso, Project Manager for the CIO Program, presented a summary of the Program from the beginning of CIO activities on April 28, 1983 through September 30, 1983.

I Four main topics were covered:

  • Staffing of the CIO Team. Fourteen people.were assigned to the team as of October.13, 1983. Six additional people are expected to

'_ oin the team by the end of October. The number of people to be added j

i

'n November will be dictated by work activities that are eventually i

scheduled.

i.

  • Status of Developing Inspection Checklists. Inspection checklists are i

used bythe CIO team in conducting assessments. Checklists have been prepared for 69 Project Quality Control Instructions (PQCIs) that are applicable to the verification phase of the CCP and for 40 other areas that hold special interest within the scope of the CIO but are not covered by PQCIs. These checklists are now being maintained current with revisions to base documents.

' Summary of Assessment Activities. Efforts were focused during the period on areas of particular concern to starting up the CCP. Assessment activities also took place for areas outside the CCP but within the scope of the CIO. These areas were the Spacial Systems Interaction Program (SSIP);

Heating, Ventilation, and Air Conditioning Program (HVAC); and the Nuclear

. Steam Supply System (NSSS) Seven Management Review Meetings and some

. fifty other site management meetings were monitored.

. ~,. _.. -. -. -. -. -. - - -,

.c Minutes of Meeting October 13, 1983 4

PAGE 2 Twenty training presentations were monitored and the computer training printout was compared to the training matrix for thirty people. One-hundred and fifty training records and computer entires were sampled. Sixty-nine PQCIs were reviewed. Thirty-five system interactions were evaluated.

Thirtly-two HVAC welder qualifications were checked.

  • Assessment Results.

The CIO team uses the term "0bservation to cover five situations: & deficiency, a nonconformance, a request for clarificeMon and infomation, a request for action, and a question. Observations are reported in weekly reports and tracked by those reports until satisfactorily closed. Nonconfomancesare also reported by Nonconfomance Identification Reports (NIRs). Twenty Observations were reported during the period regarding Management Review Meetings, four were reported regarding PQCIs, five regarding training, and one regarding the SSIP. Of the thirty Observations, one was a-j nonconformance and three were deficiencies. The nonconformance and deficiencies referred to training records.

Four other nonconformances regarding training, records were prepared on September 27th and will be included as Observations under the October summary.

l Questions and Answers I.

,Mr. R. J. Coo %, NRC, asked how changes to PQCIs were incorporated in checklists. Mr. S. W. Baranow, Stone & Webster, replied that revision or change notices for the PQCIs trigger the updating process for checklists.

- Mr. R. J. Cook asked if the adequacy of the training matrix has been evaluated.

Mr. A. P. Amoruso, Stone & Webster, replied that the matrix was under evaluation.

- Mr. R. 8. Landsman, NRC, asked if craft training was included in the training Drogram. Mr. D. B. Miller, CPCo, replied that craft training is included.

4 a

Minutes of Meeting October 13, 1983 PAGE 3

- Mr. J. J. Harrison, NRC, statedthat before NRC released Hold Points, related Hold Points established by Stone & Webster would have to be cleared.

- Mr. D. S. Atri, member of public, asked how a checklist is determined to be adequate or not. Mr. A. P. Amoruso, Stone.& Webster, replied that checklists are M sed on PQCIs which refe mnce applicable specifications.

If specificaticns change, PQCIs and checklists are revised.

Action Items None i