Monthly Operating Repts for Feb 1995 for Comanche Peak Ses
ML20081D876
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/28/1995
From: Sirois E, Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-95069, NUDOCS 9503210051
Download: ML20081D876 (9)


Text

'

FE Log # TXX 95069 File # 10010.2 3

3 Ref. # 10CFR50.36 itIELECTRIC c.ta.cor,rry March 15, 1995 Gecap Yke PresMeno, Nuclear U. S. Nuclear Regulatory Commission Attn: Document Control Desk Was'iington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

UNITS 1 AND 2 DOCKET N05. 50-445 AND 50 446 HONTHLY OPERATING REPORT FOR FEBRUARY 1995 Gentir. men:

Attached is the Monthly Operating Report for February 1995, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2, Operating License Nos. HPF 87 and NPF-89, respectively.

Sincerely.

C. L. Terry By:

D. R. Woodlan Docket Licensing Hanager JHK/jmk Attachment c

Hr. L. J. Callan, Region IV Hr. D. Kirsch, Region IV Resident Inspector, CPSES (1)

Mr. T. J. Polich, NRR 210124 950321005 950228 PDR ADOCK 05000445 R

PDR

[

l Energy Ptaza 160s Bryan scnet Dallas. Texas 75201 3411 p.

t Attachment to TXX-95069 Page 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO.:

50-445 UNIT:

CPSES 1 DATE:

03/14/1995 COMPLETED BY:

Ed Sirois TELEPHONE:

817-897 5664 OPERATING STATUS 1.

REPORTING PERIOD: FEBRUARY 1995 GROSS HOURS IN REPORTING PERIOD: 672 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150

  • DESIGN ELECTRICAL RATING (MWe Net): 1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

NONE 4.

REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO LATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL 672 1,416 32,629 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 2,440 7.

HOURS GENERATOR ON LINE 672 1,416 32,161 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 2,292,703 4,824,336 103,759.442

10. GROSS ELECTRICAL ENERGY GENERATED iMWH) 770,311 1,620,755 34,517,382
11. NET ELECTRICAL ENERGY GENERATED (MWH) 740,402 1,557,654 32,921,101
12. REACTOR SERVICE FACTOR 100.0 100.0 81.9
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 88.0
14. UNIT SERVICE FACTOR 100.0 100.0 80.7
15. UNIT AVAILABILITY FACTOR 100.0 100.0 80.7
16. UNIT CAPACITY FACTOR (USING MDC) 95.8 95.7 71.8
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 95.8 95.7 71.8 1 f.

UNIT FORCED OUTAGE RATE 0.0 0.0 4.6

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)

Refueling outage began March 4; duration of 63 days expected.

20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATED u

c; 1

]

i Attachment to TXX-95069 -

Page 2 of 8 -

~ AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO.:

50445-UNIT:

CPSES 1 '

1 DATE:

03/14/1995 COMPLETED BY:

Ed Sirois TELEPHONE:

817-897-5664 MONTH : FEBRUARY 1995

-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' (MWe-Net)

(MWe-Net) -

1

'.602 17 1103 2

1103 18 1102 3

1102 19 1102 4

1102 20 1101 5

1102 21 1101 6

1102 22 1101 7

1101 23 1101 8

1101 24 1101

)

9 1102 25 1103 10 1103 26 1105 11 1102 27 1105 12 1102 28 1092 13 1102 29 14 1103 30 15 1103 31 16 1103

s 9

j ;;< ~,

Attachment to TXX-95069 Page 3 of 8

SUMMARY

OF OPERATING EYPERIENCE FOR THE MONTH DOCKET NO.:

.50-445 UNIT:

CPSES 1 DATE:

03/14/1995 COMFt.ETED BY:

Ed Sirois TELEPHONE:

817-897-5664 MONTH : FEBRUARY 1995 DAY TIME

. REMARK / MODE 02/01 0000 Unit started month in MODE 1.

02/28 2400 Unit ended month in MODE 1.

i

-, - l

s ::

i' Attachment to TXX-95069 V-Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50445' UNIT:

CPSES 1

~

' DATE:

03/14/1995 COMPLETED BY:

Ed Sirois TELEPHONE:

817-897-5664 REPORT MONTH : FEBRUARY 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE A.

i l

t l

1 1

1) REASON
2) ' METHOD -

A: EQUIPMENT FAILURE (EXPLAIN)

E:. OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST.

F: ADMINISTRATIVE

' 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN)-

- 3: ' AUTOMATIC SCRAM D: REGULATORY RESTRICTION -

H: ' OTHER (EXPLAIN) 4: OTHER (EXPLAIN)'

1 v

<r a

w w

n u e

v-e-

O y

e.,.

Attachment to TXX-95069 '-

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2

. NRC MONTHLY OPERATING REPORT DOCKET NO.:

50-446 UNIT:

CPSES 2

- DATE:

03/14/1995 COMPLETED BY:

Ed Sirois TELEPHONE:

817-897-5664 OPERATING STATUS 1.

REPORTING PERIOD: FEBRUARY 1995 GROSS HOURS IN REPORTING PERIOD: 672 N

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150

  • DESIGN ELECTRICAL RATING (MWe-Net): 1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Neth NONE 4

REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL

~672.

1,416 10,534 6,

REACTOR RESERVE SHUTDOWN HOURS 0

0-2,154 7.

HOURS GENERATOR ON LINE 672 1,416 10,357 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0'

9.

GROSS THERMAL ENERGY GENERATED (MWH) 2,280,718 4,808,131 32,108,057

10. GFiOSS ELECTRICAL ENERGY GENERATED (MWH) 779,380 1,643,694 10,799,749'
11. NET ELECTRICAL ENERGY GENERATED (MWH) 750,385 1,582,889 10,277,845
12. REACTOR SERVICE FACTOR 100.0 100.0 76.4
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 92.0 14 UNIT SERVICE FACTOR 100.0 100.0 75.1
15. UNIT AVAILABILITY FACTOR 100.0 100.0 75.1 16.' UNIT CAPACITY FACTOR (USING MDC) 97.1 97.2 64.8
17.. UNIT CAPACITY FACTOR (USING DESIGN MWe) 97.1 97.2 64.8
18. UNIT FORCED OUTAGE RATE 0.0 0.0 10.6
19. SHUfDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
20. IF SHUTDOWN AT END OF REPOKTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED i

]

'J,

'I Attachment to TXX 95069 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

50-446 UNIT:

CPSES 2 DATE:

' 03/14/1995 COMPLETED BY:

Eri Sirois TELEPHONE:

817 89/-5664' MONTH : FEBRUARY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1122 17 1108 2

1121 18 1030.

- 3 1121 19 1120 4

1121 20 1121-5 1121 21 1127

'I 6

1121 22 1121 7

1121 23 1121 8'

1120 24 1120 9

1121 25 1118

't 10 1121 26 1117

-11 1120 27 1116 12 1121 28 1115 13 1121 29 i

14 1121 30 i

15 1122 31-16' 1122 4

7 y

u--

,m r,

.-w--

-- -e-s-e.

(

1 Attachment to TXX 95069 Page 7 of 8.

~

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH 8

DOCKET NO.:

50-446-1 UNIT:

CPSES 2 DATE:

03/14/1995 I-COMPLETED BY:

Ed Sirois :

TELEPHONE:

817-897 5664 4

MONTH : FEBRUARY 1995 DAY TIME REMARK / MODE.

02/01 0000 Unit started month in MODE 1.

i 02/28 2400

. Unit ended month in MODE 1.

I W

s l

i 1

.P.4 sa; Attachment to TXX-95069 Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS

(,

I DOCKET NO.:

50-446.

UNIT:

CPSES 2 i

DATE:

03/14/1995 COMPLETED BY:

Ed Sirois TELEPHONE:

817-897-5664 REPORT MONTH : FEBRUARY 1995

-s l

METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE i

e i

1) REASON
2) METHOD A: EQUIPMENT FAILURE (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION -

1: MANUAL

+

4 B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION.

H: OTHER (EXPLAIN) -

4: OTHER (EXPLAIN) e

.