ML20081D472
| ML20081D472 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/19/1983 |
| From: | Gerrets J, Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 86, W3K83-1590, NUDOCS 8311010212 | |
| Download: ML20081D472 (2) | |
Text
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
LOUISIANA POW E R & L1G HT /Waterford 3 SES/P. O. Box B/Killona, LA 70066 U$USIN SYS October 19, 1983 W3K83-1590 Q-3-A35.07.86 W ;, ~
f ii y
)
OCT2 51983 / f0l Mr. John T. Collins Regional Administrator, Region IV gg U. S. Nuclear Regulatory Commission j
611 Ryan Plaza Drive Suite 1000
) gD7Ji%g.,
Arlington, Texas 76012 l
REFERENCE:
LP&L letter W3183-0309 dated September 15, 1983
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Constructfon Deficiency No. 86 "3A-S Safety Inverter Output Capicator Wiring Burned" Third Interim Report The above referenced letter indicated submittal of a Final Report to the USNRC on October 19, 1983.
At the present time, final review of the supporting documentation is scheduled to be completed on November 7, 1983.
A Final Report will be submitted to the USNRC on November 16, 1983.
Very truly yours.
V T
T. F. Gerrets Quality Assurance Manager TFG:CNil:SSTC cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8311010212 831019 PDR ADOCK 05000382 PDR 10 J
- _... _ _ _ _. _ _ =.. _. -. - _..
i s*
Mr. John T. Collins l
October 19, 1983 i
Page 2 i
cc: Director Office of Management l
Information and Program Control U. S. Nuclear Regulatory Commission j
Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge l
1800 M Street, N.W.
Uashington, D.C.
20036 i
j Mr. W. M. Stevenson j
Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130
)
i 4
i l
b r
1 1
1 4
2
~.
._.._4
._