O PSEG Public Service Electric and Gas Company P. O. Box A Hancocks Bridge, New Jersey 08038 Hope Creek Generat:ng Station March 12,1984 Mr. Harold Denton, Director Office of Nuclear Reactor Requirements U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

Please find attached, data sheets reflecting the current and proposed experience levels for Hope Creek licensed operators. This information is being sent at the request of Mr. Don Schnell, Union Electric Company, St. Louis, MO.

Very truly yours, R. S. Salvesen General Manager -

Hope Creek Operations GCC/ro Attached

- CC:

Mr. Hugh Thompson Director, Division of Human Factor Safety U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Donald F. Schnell Vice President Union Electric Company P. O. Box 149 St. Louis, Missouri 64503 8403140007 840312 PDR ADOCK 05000354 On V

PDR

/

1

){\\

The Energy People w

..c

1 Daft:

3/9/84 OPERATING SHIFT EXPERIENCE (AT FUEL LOAD)

PLANT NA4 : Hope Creek Attichment 1 OTILITY:

PSE&G JOB TIT!E: Shift Supervisor (senior Shift Supervisor)

NUCLEAR POWER PLANT EXPERIENCE (NOTE 2) 0.L. DATL:

1/86 FOR OPERAi1NG 5HIFT POSITIONS (NOTE 1)

ENTER UATA: MONTHS /Pt)NTHS X WElGHTING FACTOR WE lum Ti m

  1. MX ipt>M TYPE OF EXPERIENCE FACTOR CREuli 1

2 3

4 5

6 7

8 9

10 1.

SAPE Tf 9E COM4dCIAL SRO 6/6 l

2.

OTHER COMT ACIAL S40 1.

S. Saunders 0.75 NO LIMIT 18/1 3.5 2.

L. Aversa 3.

SAME TYPE COM4dCIAL RO 3.

E. Riley 1.C0 NO LIMIT 56/56 4.

M. Trum 4.

OTHEd COMidCLnt RO 5.

Future 1984 0.75 NO LIMIT 84/63 6.

Future 1984 5

NAWY (MILITANY) NVCLE Ad (RO. EWO, EOUW, PPWS) 36 PONTHS 102/3b 0.50 (U THtN) 0.20 6.

SIMULA TUR (NLFEWENCE PLANT) 12 MONTHS

.7/3.5

.7/3.5

.7/3.5

.7/3.5 5.00 (12 MONTHS)

(SI NILAW) 3.00 (9 Ph>NIHS)

.7/2

.7/2 7/2 7/2 7.

NOCLEAd PLANT EXPEd!ENCE ON SHIFT (OWN PLANT) 24 MONTHS 18/12 18/12 18/12 18/12 (LESS THAN 1-1/2 YE Ads PR!tM TO F.L.)

0.75 (12 MONTHS)

(Mode THAN 1-1/2 YEARS PRIUR TO F.L.)

(12 MONIHS) 8 LICENSED CLASWOM TRAIN!% AND EXAM 0.50 9 MONTHS (OWN PLANTJ 12/6 12/6 12/6 12/6 9

PARTICIPATION AT UPExATIS PLANT 0.75 12 M0NTHS 3/2.5 3/2.5 3/2.5 lu. OTHLR NUCLE AR PLAN T EXPENIENCE l

)

i 0.25 12 MONTHS 30/1.5 18/4.5 II. CONuuCTIE LICENSE TRAINI%

0.25 12 MONTHS

12. DEGREL (LNGINEERIE, APPLito SCIENCE OR EQUIVALEN T)

(SACHELuRS DEbHEE) 12 MONTHS lu (ASSOCIATLS DEGREE)

(12 MONTHS)

(6 MONTHS)

TOTAL NOCLE AR PLANT EXPERIENCE:

1 30.4/

64.4/

203.4/

52.4/

  • A minimum of 6 Senior 102.25 33.25 131.5 30.25 Shtft Supervisors, and/or Shift Supervisors.tll nav at least 6 monthfpatton HOT PARTICIPATION EXPERIENCE 8W on-snif t hot partic Tid > 201 PWR/BW (WKS) 6 (BW) 6 (B W) 24(BW) 6 (BW)

STANTUP & SHUT 00WN (YES/NO)

YE S YES VE S(RO)

YES Pt)NTHS ON SHIFT 6*

6*

62*

6*

NOTE 1:

SEE *iMSTRUCTIONS FOR USL OF NUCLE AR POWER PLANT EXPERIENCE FAC'oWS FOR O

a.

UPEdATim SHIFT P0hlT10NS (0L APPLICANTS]"

Snif:

the utility pian.aavisors se ne useo to satisry tne not partici at$on evgerience requirements of P

NOTE 2:

INCLUtt. ALL SHIFT SUPERVISURS (SS), SHIFT SRO'S, REACTuR OPEaATuRS (RO)

O n.

Snif e aavisors.iii Prosasi, ne requireo, at ieast for some snirts.

AN0 SHIFT TtCHNICAL ADVISORS (S TA).

2.0 33 h

c.

Do not plan to use shif t advisors L'tess some unforeseen circumstance arises.

DATE:

3/9/84 OPERATING SHIFT EXPERIENCE (AT FUEL LOAO)

PLMT NAME: Hope Creet JOB TITLE: Shift SRO (Shift Supervisor)

UTILITY:

PSE&G (NOTE 2)

NUCLEAR POWER PLANT EXPERIENCE 0.L. DATE:

1/86 F0d OPERATING SHIFT POSITIONS (NOTE 1)

ENTER UATA: MONTHS / MONTHS a WEIGHTINC FACTOR WE lbHT] E MAXIMUM TYPE OF EXPERIENCE FACTOR CRE0!T 1

2 3

4 5

6 7

8 9

10

-1.

SAME TYPE CUMEdCIAL SNO 4/4 1.

T. Russell 2.

OTHER CDMERCIAL SRO 0.73 N0 LIMIT 9/6.75 3.

F. Hughes 2.

R. Stamato 3.

SAE Tf fE COMERCIAL R0 1.00 NO LIMIT 48/48 5.

R. Ebright 4

D. Powell 6.

R. Thorson 4 OTHEN COME dCIAL RU 0.75 NO LIMIT 108/81 108/81 112/84 7.

F. Higgins 5.

NAWY (MILITAWV) NOCLE Aa 36 MONIHS 76/36 84/36 48/24 72/36 72/36 93/36 9.

Future 1984 8.

L. Newman (Rd. EWD. EJUW. PNS) 0.50 (OTHEd) 0.26

10. Future 1984
11. Future 1984 6.

SIMOLATog 12 MONTHS

.7/3.5 7/3.5

.7/3.5 7/3.5

.7/3.5

.7/3.5

.7/3.5

.7/3.5 (REFixENCE PLANT) 5.00 (12 MONTHS)

( SIMILAN) 3.00 (9 MONTHS)

.7/2 7/2

.7/2 7/2

.7/2

.7/2

.7/2 7/2 7.

NUCLE Ad PLANT EXPERIENCE UN SHIFT (0WN PLA1T) 24 MONTHS 18/12 18/12 18/12 18/12 18/12 18/12 18/12 18/12 (LEs$ THAN 1-1/2 YEARS PRION TO F.L.)

U.75 (12 MONTHS)

(MONE THAN 1 1/2 YEAHS PuluR To F.L.)

(12 MONTHS) 6/3 6/J 6/3 6/3 6/3 6/3 6/3 6/3 8.

LICENSE 0 CLASWOM TNAINIE ANJ EXAM 0.5 u 9 m NTHS 12/6 12/6 12/6 12/6 12/6 12/6 12/6 12/6 (OWN PLANT) 9.

PANilCIPATION AT OPERAT!L PLANT 0.75 12 MONTHS 25/12 9/6.75 1U. OTHER NUCLE Ad PLANT EXPERIENCE 0.25 12 MONTHS 36/9 3b/9 38/9.5

11. ComUCTis LICENSE TNAIN!%

0.23 12 MONTHS 1t. OthWLt (ENbimttni ms. APPLitu SCILNCE 0x Eyu! VALENT) 12 MONTHS

($ALHtLONS UEGRLE)

(12 MONTHS) 4 (ASwCI ATLS DEGREE)

(6 MONTHS)

  • A minimum of 6 Senior TOTAL NUCLE AR PLANT EXPEd!ENCE:

170.4/

154.4/

234.4/

'b7.4/

121.4/

165.4/

141.4/

127.4/

Snif t Supervisors. and/or 119.5 114.25 153.2d 11.5 59.5 1 18.5 66 62.5 gigpgrgsors wjil nave HOT PARTICIPATION EXPERIENCE snitt hot parthpation experience.

TIE > Zu1 PWR/$wR (WKS) 6(8*)

6(8W) 0($W) 6(BWR) 6(8*)

16(BWR) 6(BW) 6(BW)

STANIUP a SHuTouwN (VES/NO)

YE S YES YES YES YES VES VES YES MumINS ON SHIFT 6*

6*

b*

0*

b*

6*

6*

NVIE 1: SLE *lNSidUCTIONS FON USL UF N0 CLEAN POWER PLANT EXPEklLNCE F ACiuks r04 O

a.

Snitt aavisors must ne usea to satist, tne not Particigation e gertence reRuirements ur OPEdAllE SHtFi POSITIONS (OL APPLILWTS)*

Ine utility plan.

NOTt 2: INCLUUL ALL SHIFT SUPERVIS0d5 (SS) SdlFT SRO'S, NEACTUR UPERATORS (20)

O o.

Snirt.avisors tii pros.ni, ne requireo. at ieast for some snitts.

ANu SHIFT TtCHNICAL ADVISORS (SIA).

2.u33 0

c.

Do not plan to use shif t advisors unless'some unforeseen circumstance arises.

DATL:

3/9/84 OPERATING SHIFT EXPERIEr3E ( AT FUEL LCOD)

Attothmeat 3

. PLAN T NAE :

Hope Creek UTILITY:

PSE&G JOB TITLE: Shift Technical Advisor

- (NOTE 2)

NUCLEAR POWER PLANT EXPERIENCE 0.L. DATE:

1/86 FOR OPERATING SHIFT P0$lTIONS (NOTE 1)

ENTER D4TA: pt)mTHS/ MONTHS a WEIGHTING FACTOR WE t uM TIE tmI! mum TYPE OF EXPERIENCE FACTOR CRE0li la 2*

3 4*

5'

'6*

7 8

9 10 1.

SAME TYPE CUMTdCIAL SRO I

2.

OTHER COMTRCIAL Sau 1.

J. Johnson U.75 N0 LIMIT 2.

W. 0*Malle; 3.

ii. Young 3.

SAE TYPE COMTdCIAL R0 1.00 NO LIMIT 4

J. 0*8rten 4 OTHER COMTRCIAL R0 5.

G. Nayler 0.75 N0 LIMIT 6.

M. Anaro b.

NAff (MILITARY) NUCLE Ad

,36 NNTHS

  • W111 also license (RO. EWO. EJUW PHdS) 0.50 (O TMEd) as SRO 0.20 6.

SIMULATtm 12 MONTHS 7/3.4

.7/3.5

.1/3.5

.7/3.5

.7/3.5

.7/3.S (REFERENCE PLANT)

$.00 (12 MONTHS)

(SIMILAR) 3.00 (9 PL;NIH))

1/3

.7/2 7/2

.7/2

.7/2 7/2 7.

NUCLE Ad PLANT EXPERIENCE ON SHIFT (OWN PLANT) 24 N NIHS 12/9 12/9 12/9 12/9 12/9 12/9 (LESS THAN 1-1/2 YEAds PRitM TO F.L.)

0.75 (12 NNTHS)

(HORE THAN 1-1/2 YEARS PRIOR TO F.L.)

(12 NNIHS) 8.

LICENSED CLASSeJUM TRAINIE AND EXAM 0.50 9 MONTHS (OWN PLANT) 12/6 12/6 12/6 12/6 12/6 12/6 9.

PARTICIPAT!0N AT UPERATIE PLANT 0.74 12 MONTHS 1u. OTHER NUCLEAd PLANT EXPERIENCE 0.25 12 ft)MTHS 6/1.5 19/4.75 33/8.25 31/7.75

11. CONuuCTIE LICENSE TRAIN!E 0.2d 12 MONTHS '
12. UEGREE (ENGINEERIE, APPLILO SCIENCE OR EQu! VALENT) 12 MONTHS (BAWELURS DEGREE)

( AShuCIATLS DFGREE)

(12 MONTHS) 12 12 12 12 12 12 (6 Pt)NTHS)

TOTAL NUCLE AR PLANT EXPERIENCE:

4J.7/

37.4/

37.4/

d6.4/

70.4/

68.4/

34 32.5 32.5 37.2d 40.73 40.23 Hui PARTICIPATION EXPiRIENCE TIME > 20% PWR/ ban (WKS) 6 6

6 6

6 STAdIUP a SHUTDOWN (TES/NO)

MONTHS ON SHIFT NOTE 1: SEE " INSTRUCT 101S FOR JSE OF NOCLE AR POWER PLANT EXPERIENCE FACTURS FOR C

a.

0FidATIE SHIFT PUSI TidNS (OL APPLICANTS)"

Shif t advisors must be used to satisfy the "not participation experience" requirements of

~

tne utility plan.

NdTE 2:

INLLuuE ALL SH!FT SUPEdVISORS (SS), SHIFT S65. REACIVd OPERATOR $ (RO) C b.

Shif t advisors will probably be required. at least for some shif ts.

AND SHIFT TLCHNICAL ADVISORS (STA).

Z.u JJ E

c.

Do not plan to use snitt advisors unless sone unf oreseen circumstance arises,

IDATE:

3/9/84 OPERATING $HIFT EXPERIENCE (AT FUEL LOAD)

PLANT NAE: Hope Creek JOB TITLE:' Reactor Operator (Nuclear Control Operator)

UTILITY:

PSE4G (NOTE 2) 4 NUCLEAR PuutR PLANT EXPERIENCE 0.L. DATE:

1/86 FOR OPERATING SHIFT POSITIONS (NOTE 1)

CieTER uATA: M3NTHS/ MONTHS x WEIGHTimG FACTOR WE IGHTIE PRXIMUM TYPE OF EXPERIENCE FACTOR CREuli 1

2 3

4 5

6 7

8 9

10 1.

SAML TYPE 0) MERCI AL SRO 1.

F. Bonnet 2.

W. Chausse -

2.

OTHER COMERCIAL SRO 0.75 NO LIMIT 3.

J. De00minico 4.

T. Easitck 3.

SAFE TYPE COMERCIAL R0 1.00 NO LIMIT 5.

J. Edwards 6.

A. Faulkner 4.

OTHER COME RCIAL RO 0.75 NO LIMIT-16/12 7.

S. Geary 8.

S. Hanseli 5.

NAVY (MILITARY) NOCLEAR.

36 MONTHS i72/36 72/36 12/36 72/36 12/36 40/20 9.

S. Jones (RO. EWo. E00W, PPWS) 0.50

10. T. Kirmin (OTHER)

U.26 E

6.

SIMULATOR 12 MONTHS 7/3.5

.7/3.5

.7/3.5

.7/3.5

.7/3.5

.7/3.5

.7/3.5 7/3.5

.7/3.5

.7/3.5 (REFERENCE PLANT) 5.00 (12 MONTHS)

(SIMILAR) 3.00 (9 PUNTHS)

.7/2 7/2

.7/2.

.7/2

.7/2

.7/2

.7/2

.7/2

.7/2

.7/2 7.

NUCLEAR PLANT EXPERIENCE UN SHIFT (0WN PLANT) 24 MONTHS 18/12 18/12 18/12 18/12 18/12 18/12 18/12 18/12 18/12 18/12 (LESS THAN 1-1/2 YEARS PRIOR TO F.L.)

0.75 (12 MONTHS)

(MORE THAN 1-1/2 YEARS PRIOR TO F.L.)

(12 MONTHS) 6/3 6/3 6/3 6/3 6/3 6/3 6/3 6/3 6/3 6/3 8.

i.! CENSED CLASSROOM TRAINIE AND EXAM 0.50 9 MONTHS (0WN PLANT) 12/6 12/6 12/6 12/6 12/6 12/6 12/6 12/6 12/6 12/6 9.

PARTICIPATION AT OPERATIE PLidti 0.75 12 MONTHS 27/12 30/12 39/12 28/12 24/12

10. OTHER NUCLEAR PLANT EXPERIENCE 0.25 12 MONTHS
11. CON 00CTIE LICENSE TRAINI%

0.25 12 MONTHS

12. DEGREE (ENGINEER!E, APPLIED SCIENCE OR EQUIVALENT) 12 MONTHS (BACHELORS DEGREE)

(12 MONTHS) 3 6

5 3

(ASSOCI ATES DEGREE)

(6 MONTHS)

TOTAL NUCLE AR PLi.. ' tan.GENCE:

109.4/

109.4/

64.4/

112.4/

115.4/

67.4/

16.4/

109.4/

70.4/

117.4/

62.5 62.5 38.5 65.5 68.5 38.5 38.5 62.5 43.5 73.5 HOT PARTICIPATIO'8 EXPERIENCE TIME > Zut PWR/BWR (WKS)

STARTUP & SHUT 00WN (YES/N0)

MONTHS ON SHIFT NOTE 1: SEE " INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR O

a.

Snirt aavisors must de usea to satists tne not Participation e Pertence requirements or 4

OPtRATIE SHIFT POSITIONS (0L APPLICANTS)-

the utility plan.

NOTE 2: INCLUDE ALL SHIFT SUPERVISORS (55) SHIFT SRO'S, REACTOR (PERATORS (RO)

O n.

Snitt aavisors wiii Prodani, be requireo, at ieast ror some snires.

AND SHIFT TECHNICAL ADVISORS (STA).

4.033 E

c.

Do not plan to use snif t advisors unless some unroreseen circumstance arises.

4

DATE:

3/9/84 OPERATING SHIFT EXPERIENCE (AT FUEL LOAD)

Atttchment 4 PLANT MAff: Hope Creek JOB TITLE: Reactor Operator (Nuclear Control Operator)

UTILITY:

PSE2 (NOTE 2)

NUCLEAA POWER PLANT EXPERIENCE 0.L. DATE:

1/86-FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS x WEIGHTING FACTOR WEIGHTING

-PRAIMUM TYPE OF EXPERIENCE FACTOR CRE0!T 11 12-13 14.

15 16

1.. SAME TYPE COMERCI AL SRO
11. B. Lewis
12. R. Meyers 2.

OTHER COMERCIAL SRO 0.75 NO LaMIT

13. R. Rudy 3.

WE TYPE 0)MERCIAL RO 1.00 NO LIMIT

14. J. Wicks
15. T. Williams
16. P. Wilson 4 OTHER COMERCIAL R0 0.75 NO LIMIT 21/20.5 5 NAVY (MILITART) NUCLE AR 36 MJNTHS I 72/36 72/36 72/36-12/36 (RO. EWO, E00W. PPWS) 0.50 (OTHER) 0.26 6.

SIMULATOR 12 MONTHS

.7/3.5

.7/3.5

.7/3.5

.7/3.5

.7/3.5 7/3.5 (REFERENCE PLANT) 5.00 (12 MONTHS)

($1MILAH) 3.00 (9 MONTHS) 7/2 7/2 7/2

.7/2

.7/2 7/2 7.

NOCLEAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS l18/12 18/12 13/12 18/12 18/12 18/12 (LESS THAN 1-1/2 YE ARS PRIUR TO F.L.)

0.7b (12 MONTHS)

(MORE THAN 1-1/2 YEARS PRIOR TO F.L.)

(12 MONTHS) 6/3 6/3 6/3 6/3 6/3 6/3 8.

LICENSED CLASSROOM TRAINING AND EXAM 0.50 9 MONTHS 12/6 12/6 12/6 12/6 12/6 12/6 (OWN PLANT) 9.

PARTICIPATION AT UPERATIE PLANT 0.75 12 MONTHS 21/12 32/12

10. OTHER NOCLEAR PLANT EXPERIENCE 0.25 12 MONTHS
11. CON 00CTING LICENSE TRAINING 0.25 12 MONTHS
12. DEGREE (ENGINEERING APPLIED SCIENCE OR EQUIVALENT) 12 MONTHS (BACHELORS DEGREE)

(12 M0NTHS) 6 4

2 12 2

(ASSOCIATES DEGREE)

(6 MONTMS)

TOTAL NUCLEAR PLANT EXPERIENCE:

115.4/

89.4/

109.4/

111.4/

121.4/

71.4/

4 68.5 62.25 62.5 64.5 74.5 40.5 HOT PARTICIPATION EXPERIENCE TIME > 2U1 PWR/BWit (WKS)

STARTUP a SHUTOUWN (YES/NO)

MONTHS ON SHIFT NOTE 1: SEE ' INSTRUCTIONS FOR USE OF NUCLEAR POWER PLANT EXPERIENCE FACTORS FOR C

a.

Shif t advisors must be used to satisfy the " hot participation experience" requirements of UPERATING SHIFT POSITIONS (OL APPLICANTS)"

the utility plan.

NOTE 2: INCLUDE ALL SHIFT SUPERVIsuRS (SS), SHIFT SRO'S, REACTOR OPERATORS (RO)

C b.

Snif t advisors will probably be required, at least for some shifts.

AND SHIFT TECHNICAL ADVISORS (STA).

l.033 E

c.

Do not plan to use shift advisors unless !,ome unforeseen circumstance arises.

4 i

DAIE:

3/9/84 OPERATING SHIFT EXPEWlENCE (CURRENT STATUS)

PLAN T NAM : Hope Creek Lttichment b UTILITY:

PSE&G JOB TITLE: Shift Supervisor (Senior Shift' Supervisor)

NUCLEAR POWER PLANT EXPERIENCE (NOTE 2) 0.L. DA(E:

1/86 FOR UPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: MONTHS / MONTHS x WElGHTING FACTOR WEIGITI E WXIMUM TYPE OF EXPERIENCE FACTON CRE0lT 1

2 3

4 5

6 7

8 9

10 1.

SAE TfrE WMERCIAL SNO 6/6 l

i 2.

OTHEd COMERCIAL SHG 1.

S. Saunders U.7 5 NO LIMlf 18/13.5 2.

L. Aversa 3.

SAME TYPE CUMERCIAL R0 3.

E. Riley 1.00 NO LIMIT 56/56 4.

M. Trum 4 OTER COMERCIAL RU b.

Future 1984 0.75 NO LIMIT 84/63 6.

Future 1984 b.

NAVT (MILITARY) NUCLEAN 36 MDNTHS (RO. Ewo. EDUW. PFWS) 0.S0 102/36 (OinEW) 0.26 6.

51MutATm 12 WNTHS (RLFERENCE PLANI)

S.00 (12 MONTHS)

(SIMILAN)

Du (9 PtJNTH5)

.7/2 7/2

.7/2 7.

NUCLEAN PLANT EXPENIENCE ON SHIFT (0WN PLANT) 24 W NTHS (LESS THAN 1 1/2 VEAd1 PRIUR TO F.L.)

U.75 (12 WNTHS)

(MORE THAN 1 1/2 YEAd5 PRIUN TO F.L.)

(12 NMIHS) 8.

LICEN5LD CLA15%UM TRAIN!E AND EXAM U.50 910NTHS l'2/6 12/6 12/6 (0WN PLANT) 9.

PANTICIPAT10N AT UPERATim PLAMI U.74 12 MONTHS 1/.75 1/.75 l1/.75

{

IU. OTHLM NUCLLAN PLANT EXPERIENCE 0.2$

12 MONTHS 30/7.5 18/4.5

11. CONDUCTIE LICENSE TRAIN!E 0.25 12 MONTHS
12. OEGHEE (ENGINEERIE. APPLIED SCIENCE OR EyulvALENT) 12 M014THS (8ALHELONS DEGREE)

(A550CIAftS DEGREE)

(12 MONTHS) 10 (6 MONTHS) 1 TOTAL NUCLEAR PLANT EXPENIENCE:

114.7/

43.7/

174.0/

31.7/

85.2s 16.2s 108.'t 13.25 HUT PANTICIPATION EXPERIENCE TIE > ZUS PWN/BWR (WKS) 24(8dt)

STANTUP & SHUTGUWN (fES/No)

VES(RO) 10NTHS ON SHIFT 62 2.033 V

.._m

.9 DATE:

3/9/84 OPENAT!I.G SHIFT EXPERIENCE _(CURRENT STATUS)

PLAN T NAT; Hope Creek Attachaient 6 UTILITY:

PSE&G JOB IITLE: Shift SRO (shift Supervisor)

(NOTE 2)

NUCLEAR POWER PLANT EXPERIENCE U.L. DATL:

1/86 FOR OPERATING SHIFT P05til0NS (NOTE 1)

ENTER uATA: MONTHS /WNTHS a WElbHTING FACTOR WElbHil E mIIMUM TYPE OF EXPERIENCE FACT 04 CREDIT 1

2 3

4 5

6 7

8 9

10

}

1.

SM TYPE COM(NCIAL SHO 4/4 2.

OTHEd CUM ( dCIAL SWO 1.

T. Russell

.U.75 NJ LIMIT 9/7.75 2.

R. stamato 3 SW TYPE COMTRCIAL R0 3.

F. Hughes 1.00 No LIMIT 4.

D. Powell 4d/46 4 UTHER COM(RCIAL NJ 5.

R. Ebright 0.75 160 LIMIT 108/81 108/81 112/84 6.

R. Thorson b.

NAVY (MILIIANY) NOCLEAR 7

R. Higgins 36 PUNTH5 76/36 d4/36 48/24 72/36 72/36 93/36 9.

Future 1984 8.

L. Newman (RO. EWo. E0VW. PPWs) 0.50 (OTHEd) 0.26

10. Future 1964 6 SIMULATuN

!!. Future 19ts4 12 MONTHS (RtFERENCE PLANT) 5.00 (12 MONTHS)

(5! MILAN) 3.00 (9 P0 NTH 5) 7/2

.1/2

.7/2

.7/2

.//2 7/2

.7/2 7 NUCLEAR PLANT EXPERIENCE UN SHIFT (0WN PLANT) 24 MONTHS (LESS THAN 1-1/2 YEARS PN!W TO F.L.)

0.75 (12 MONTHS)

(MORE THAN 1-1/2 YE Ad5 PRlW TG F.L.)

(12 MUf4IH5) 2/1 2/1 2/1 2/1 2/1 1/.5 2/1 2/1 8.

LICENSEI) CLASS *)UM TRAIN!% AND EXAM U.50 9 MONTHS 12/6 12/6 12/6 12/6 12/6 12/6 12/6 (0WN PLANT) 9.

PAdTICIPATION AT OPERATIE PLANT 0.75 12 MONTHS 25/12 9/6.75

10. OTHEd MVCLE AR PLANT EXPEd!ENCE

)

0.25 12 MONTHS 36/9 36/9 38/9.5

11. COMUUCTIE LICENSE TNAIN!%

0.24 12 MONTHS 4

12. DLGREL (ENGINEENIO. APPLIED SCIENCE OR i

Eyu! VALE NT) 12 MONTHS 1

(BAWELONS DEGNEE)

(ASwCIATL5 DEbHEE)

(12 MONTHS) 4 4

(6 MONTHS) f TUTAL NUCLE AN PLANT EXPEHIENCE:

2 144.7/

1 31.7/

211.7/

1 34.7/

98.7/

1 29/

124.7/

107.7/

102 96.75 13).75 54 42 92.5 54.5 45 HOT PARTICIPATIUN EXPERIENCE l

TIE > Zut PWR/8WR (WKS)

STARTUP & SHJTOUWN (YES/NO) id(8bR)

MUNTHS ON SHIFT YES 2}

l 2.U O 'J

DATE:

3/9/84 OPERATING 5HIFT EXPERIECIE (CURRECT STATUS) '

PLANT NAE: Hope Creek Cttachment 7 UTILliV:

PSE4G JOB TITLE: Shift Technical Advisor (NOTE 2)

NUCLEAR POWER PLANT EXPERIENCE 0.L. DATE:

1/86 FOR OPERATING SHIFT POSITIONS (NOTE 1)

' ENTER DATA: WNTHS/ MONTHS x WE!GHTIE FACTOR E IGITI E MAXIMUM TYPE UF EXPERIENCE FACTOR CNEDIT l'

2*

3 4*

b*

6*

7-8

'9 10 1.

SME TVPE CUMPtRCIAL SHG -

2.

OTHER CUMPERCIAL SRO l

J. Johnson

'O.75

-N0 LIMIT 2.

W. O'Malley 3.

SAE TfPE COM ( WCIAL MG 3.

G. Youny 1.00 NO LIMIT 4

OTHt'R COMERCIAL R0 4

J. O'8rien 5.

G. Nayler 0.75 NO LIMIT 6.

M. Azzaro b.

NAWf (MILITANY) NUCLE AR (NU. EWu, E00W. PPWS) 3b MONTHS -

  • Will also license 0.50 (O THER) as SNO 0.2b 6 $1MULATOR (REftRENCE PLANT) 12 MONTHS 5.00 (12 WNTHS)

(SIMILAN) 3.00 (9 N NTH 5) 1/3

.7/2

.7/2

.7/2 7/2

.7/2 7

NUCLEAd PLANT EXPEd!ENCE ON SHIFT (UWN PLANT) 24 MONTH 5 (LESS THAN 3-1/2 VE ARS PRIUM TO F.L.)

0.75 (12 W NTHS)

(MORE THAN 1-1/2 VEMS PRIUR TO F.L.)

(12 MONTH 5) 8.

LICEN5E0 CLASSROOM TRAIN!E AND EXAM 0.50 9 MONTHS 12/6 12/6 12/6 12/6 12/6 12/6 (OWN PLANT) 9.

PAdTICIPATION AT OPENATIE PLANT 0.75 12 MONTHS

10. OINER NUCLEAR PLANT EXPERIENCE 0.25 12 MONTH 5 6/1.5 L9/4.75 33/8.24 31/7.73
11. CONOUCTIE LICENSE TRAINIE 0.25 12 WNTHS
12. UEbRLE (Em!NEEulE. APPLIEU SCIENCE OR EQUIVALENT)

(SaCHEtuRS UEGNEE) 12 MONTHS (A550cIATES DLGREE)

(12 MONTHS) 12 12 12 12 12 12 (6 MONTHS)

TOTAL NUCLEAR PLANT (APERIENCE:

31/

24.7/

24.7/

43.7/

57.7/

55.7/

22.S

! t.:

20 24.75 28.25 27.75 HUT PANTICIPATION EXPERlLNCE TIE > Zui PWR/8WR (WKS) sTARTuP 4 SHuTOOWN (VES/NO)

Q NTHS ON SHIFT Z.0JJ

~..

DATE:

3/9/84 OPERATING SHIFT EXPERIENCE (CURRENT STATUS)

Attictmeat 8 PLANT NAE: Hope Creek Sheet 1 of 2 UTILITY:

PSEaG J06 TITLE: Reactor Operator (Nuclear Control Operator)

(NOTE 2)

NUCLEAR POWEst PLANT EXPERIENCE 0.L. DATE:

1/86 FOR OPERATING SHIFT POSITIONS (NOTE 1)

ENTER DATA: PONTHS/PL)*THS x WEIGHTING FACTOR WEIGHTING PEXIPRJM TYPE OF EXPERIENCE FACTOR CREDIT 1

2 3

4

_5 6

7 8

9 10 1.

SAFE TVPE COMERCIAL SR0 1.

R. Bonnet 2.

OTHER COMERCIAL SRO 0.75 NO LIMIT 2.

W. Chausse 3.

J. DeDominico 3.

SANE TYPE OJMERCIAL R0 1.00 N0 LIMIT 4.

T. Easlict 5.

J. Edwards 4.

OTHER COMERCIAL RO U.75 NO LIMIT 6

A. Faulkner 16/12 T.

5. Geary
b. ' NAWT (MILITARY) NUCLEAR 36 MONTHS 72/36 72/36 12/36 72/36 72/36 40/20 9.
5. Jones 8.
5. Hansell (RO. EWD, E00W. PPWS) 0.50 (OTHER) 0.26
10. T. Kirwin 6.

SIMULATOR 12 MONTHS (REFERENCE PLANT) 5.00 (12 MONTHS)

(SIMILAR) 3.00 (9 MUNTH5) 7/2

.7/2 -

.7/2

.7/2

.//2

.7/2

.7/2

.7/2 7/2

.7/2 7 NUCLE AR PLANT EXPERIENCE UN SHIFT (0WN PLANT) 24 MONTHS (LESS THAN 1-1/2 YEARS PRIOR TO F.L.)

0.75 (12 MONTHS)

(MORE THAN 3-1/2 YEARS PRIOR TO F.L.)

(12 MONTH 5) 2/1 2/1 2/1 2/1 2/1 2/1 2/3 2/1 2/1 27 8 LICENSLO CLASSR00M TRAINING MD EXAM 0.50 9 MONTHS 12/6 12/6 12/6 12/6 12/6 12/6 12/6 12/6 12/6 12/6 (OWN PLANT) 9.

PARTICIPATIG.1 AT UPERATING PLANT 0.75 12 MONTHS l

27/12 30/12 39/12 28/12 24/12 l

10. OTHER NUCLE AR PLANT EXPERIENCE 0.25 12 MONTHS
11. CON 00CTING LICENSE TRAINING 0.25 12 MONTHS
12. DEGREE (ENGINEERING. APPLIED SCIENCE OR E0u! VALENT) 12 MONTHS (BACHELORS DEGREE)

(12 MONTHS) 3 6

5 3

(A5SOCI ATES DEGREE)

(6 MONTHS)

TOTAL NUCLEAR PLANT EXPERIENCE:

86.7/

86.7/

41.7/

86.7/

92.7/

44.7/

53.7/

86.7/

47.7/

97.7/

45 45 21 48 51 21 21 45 26 56 HOT PARTICIPATION EXPERIENCE TIME > 2UE PWR/8WR (WKS)

STARTUP & SHUTDOWN (YES/N0)

PR)MTHS ON SHIFT Z.033

DATE:

3/9/84

' OPERATING SHIFT EXPERIENCE (CURRENT STATUS)

She:t 2 Ef 2 PLANT MAE : Hope Creek JOB TITLE: Reactor Operator (Nuclear Control Operator)

UTILITY :

PSEaG (NOTE 2)

NUCLEAR P'MR PLANT EXPERIENCE 0.L. DATE:

t/86 FOR OPERAT!hG SHIFT POS!TIONS (NOTE 1)

ENTER DATA: PONTHS/ MONTHS n WEIGHTING FACTOR WE IGHTIE PRXIMUM TYPE OF EXPERIENrE FACTOR CREDIT 11 12 13 14 15 16 1.

SAE TYPE 0)MERCIAL SRO

11. B. Lewis
12. R. Meyers 2.

OTHER CDM7t.RCIAL SRO 0.75 NO LIMIT

13. R. Rudy
14. J. Wicks 3.

SAE TYPE COMERCl4L R0 1.00 NT LIMIT l'a. T. Williams

16. P. Wilson 4.

OTHER COMERCIAL R0 0.75 NO LIMIT 27/20.5 b.

NAWT (MILITANV) NUCLEAR 36 MONTHS i 72/36 72/36 72/36 72/36 (RO. EWD E00W. PPWS) 0.50 (OTHER) 0.26 6.

SIMULATOR 12 MONTHS (REFERENCE PLANT) 5.00 (12 MONTHS)

(SIMILAR) 3.00 (9 70NTHS)

.7/2 7/2

.7/2 7/2 7/2

.7/2 7 NOCliAR PLANT EXPERIENCE ON SHIFT (0WN PLANT) 24 MONTHS i

(LESS THAN 3-1/2 YEARS PRIOR 70 F.L.)

0.75 (12 MONTHS)

(MORE THAN 1-1/2 YEARS PRIOR TO F.L.)

(12 MONTHS) 2/1 2/1 2/1 2/1 2/1 2/1 6.

LICENSED CLASSROOM TRAIN!E AND EXAM 0.50 9 MONTHS (OWN PLANT) 12/6 12/E 12/6 12/6 12/6 12/6 9.

PARTICIPATION AT UPERATIE PLANT 0.75 12 MONTHS 21/12 32/12

10. OTHER NUCLEAR PLANT EXPERIENCE 0.25 12 MONTHS l
11. CONuuCTIE LICENSE TRAINIE 0.25 12 MONTHS
12. DEGREE (ENGINEERIE APPLIED SCIENCE OR EyulVALENT) 12 MONTHS (BAOtELORS DEGREE)

(12 MONTHS) 6 4

2 12 2

(ASSOCIATES DEGREE)

(6 MONTHS)

TOTAL NUCLE AR PLANT EXPERIENCE:

92.7/

66.7/

86.7/

88.7/

98.7/

48.7/

i 47 45.5 45 47 57 23 l.

HOT PARTICIPATION EXPERIENCE TIE > 201 PWR/BWR (WKS)

STARTUP & SETDOWN (VES/NO)

MONTHS ON SrlFT l

2.033 1

i

. _. _