Text
_
4-
.,.[
'e cz'ENTERGY ET"B Kilkm LA 70066 -
To! 504 739 6774 R. F. Burski
- Ometor, hear Cafety Wrerterd 3 i
W3F1-95-0042-A4.05 I
PR March 14, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of February, 1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, p
R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment i
cc:
L.J. Callan (NRC Region IV)
C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
i J.T. Wheelock (INP0 Records Center) f l
NRC Resident. Inspectors Office i
9503170093 950228
}\\
PDR ADOCK 05000382
\\
5 R
PDR w
.,.-,c.-
+ a9 b
i
.i NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3
~ :
FEBRUARY 1995 l
The unit operated at an average reactor power of 99.8%'and experienced no shutdowns or s!gnificant power reductions during the period.
3
-t b
i 5
i n
j 4
l
a s
l' a
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3.
During the month of February 1995, there were no pressurizer safety valve failures'or challenges.
a
j 7
i OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1995 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 OPERATING STATUS 1.
Reporting Period: February,1995 Gross Hours in Reporting Period: _Ql2.
2.
Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 3.
Power Level to which Restricted (if any) (Net MWe): N/A 4.
Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE 5.
Numbe. of Hours Reactor was Critical 672.0 1,416 70,138.8 6.
Reactor Reserve Shutdown Hours
' 0- -
7.
Hours Generator was On-line 672.0 1,416 69,260.3 8.
Unit Reserve Shutdown Hours 9.
Gross Thermal Energy Generated (MWH) 2,273,361 4,791,298 229,120,907
- 10. Gross Electrical Energy Generated (MWH) 757,490 1,595,970 76,330,430 i
- 11. Net Electrical Energy Generated (MWH) 726,479 1,530,792 72,773,158
- 12. Reactor Service Factor 100.0 100.0 84.8
- 13. Reactor Availability Factor 100.0 100.0 84.8
- 14. Unit Service Factor 100.0 100.0 83.8
- 15. Unit Availability Factor 100.0 100.0 83.8
- 16. Unit Capacity Factor (using MDC) 100.6 100.6 81.9
- 17. Unit Capacity Factor (Using DER) 97.9 97.9 79.7
- 18. Unit Forced Outage Rate 0.0 0.0 3.1
I OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1995 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Cont 19.
Shutdowns Scheduled over next 6 Months (type, date and duration of each):
N/A 20.
If Shutdown at end of report period, estimated date of startup:
21.
Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 672.0 1,416 82.681.0
- 23. Unit Forced Outage Hours 0.0 0.0 2.210.2 24.
Nameplate Rating (Gross MWe): 1200 25.
If Changes Occur in Capacity Ratings (ltems Number 2 and 24) Since Last Report, Give Reasons: N/A i
i i
t
- ~.. -
r-AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1995 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 MONTH FEBRUARY.1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)
(MWe-NET) 1 1080 17 1081 2
1082 18 1082 3
1082 19 1082 4
1082 20 1082 5
1082 21 1082 6
1082 22 1083 7
1081 23 1081 i
8 1082 24 1084 9
1081 25 1085 10 1081 26 1090 11 1039 27 1088 12 1079 28 1090 l
13 1081 29 N/A i
14 1082 30 N/A 15 1082 31 N/A i
16 1082 i
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
..1 x
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 -
UNIT NAME: WATERFORD 3 DATE OF REPORT: MARCH,1995 COMPLETED BY:
T.S. BECKER TELEPHONE. 504-7394683 REPORT FOR FEBRUARY.1995 Type Method of Shutting F = Fotted Duration Down the Reactor or Cause, Comments and Number Qat.e S = Scheduled (Hours)
Reason (1)
. Reducina Power (2)
Corrective Actions NONE A
l (1) REASON (2) METHOD A=
Equipment Failure (explain) 1=
Manual B=
Maintenance or Test 2=
Manual Scram C=
. Refueling 3=
Regulatory Restriction 4=
Continuation fmm Previous Period E=
OperatorTraining and 5=
Power Reduction Liccpse Examination 6=
Other(explain)
F=
Aoministrative G=
Operational Error (explain)
H=
Other (explain) i a.
.