Monthly Operating Rept for Feb 1994 for Wolf Creek Generating Station
ML20081B923
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/28/1995
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20081B920 List:
References
WO-95-0047, WO-95-47, NUDOCS 9503170035
Download: ML20081B923 (6)


Text

(. ,,

i 3

AttOchment to WO 95-0047 s

}

i e

WOLF CP:2K NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION MONTHLY OPERATING REPORT MONTH: February YEAR: 1995 Docket No.: 50-482 Facility Operating License No.: NPF-42 i

Report No. 120 [

i l

6 t

i i

i

?

Wolf Creek Generating Station Monthly Operating Report February, 1995 -

9503170035 950313 Page 1 f6 -

PDR ADOCK 05000482 R ,oDR

Attcchment to WO 95-0047 7

SUMMARY

.l i

Tha following report highlights the operating experience of Wolf Creek Generating Station '

for the month of February, 1995. This report is being provided pursuant to Technical Sp cification 6.9.1.8.

I.

SUMMARY

OF OPERATING EXPERIENCE

'The unit operated at or near 100% for the month of February, 1995.

f MAJOR SAFETY RELATED MAINTENANCE ACTIVITIES NONE ,

i i

t r

I 2

i l

)

I

.J t

i l

1 I

Wolf Creek Generating Station Monthly Operating Report February, 1995 Page 2 of 6 i

j

~ Attachment to WO 95-0047 OPERATING DATA REPORT l DOCKET NO. 50-482 WOLF CREEK GENERATING STATION

'AOLF CREEK NUCLEAR OPERATING CORPORATION DATE 3-03-95 TELEPHONE 316-364-BB31 OPERATING STATUS

1. Reporting Period: February, 1995 Gross Hours in Reporting Period: 672
2. Currently Authorized Power Level (MWt): 3565 Max. Depend. Capacity (MWe-Net): 1160 Design Electrical Rating (MWe-Net): 1170 -
3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A i
4. Reasons for Restriction (If Any) : N/A This Month Yr. to Date Cumulative >
5. Number of Hours Reactor was Critical 672.0 1416.0 67,384.1

'6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8

7. Hours Generator on Line 672.0 1,416.0 66,570.6 ,
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0 ,
9. Gross Thermal Energy Generated (MWh) 2,383,600 5,023,403 220,055,721
10. Gross Electrical Energy Generated (MWh) 828,453 1,745,429 76,509,644
11. Net Electrical Energy Generated (MWh) 796,713 1,678,231 73,052,905
12. Reactor Service Factor 100.0% 00.0% 81.0%
13. Reactor Availability Factor 100.0% 100.0% 81.4%
14. Unit Service Factor 100.0% 100.0% 80.0%

l

15. Unit Availability Factor 100.0% 100.0%' 80.0%

l

16. Unit Capacity Factor (Using MDC) 102.2% 102.2% 77.5%
17. Unit Capacity Factor (Using Design MWe) 101.3 101.3% 75.1%  ;

l

18. Unit Forced Outage Rate 0.0% 0.0% 5.0%
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each)-

No outages are scheduled at this time.

l

20. If Shut Down at End of Report Period, Estimate Date of Startup: N/A j AVERAGE DAILY UNIT POWER LEVEL Wolf Creek Generating Station Monthly Operating Report February, 1995 Page 3 of 6

- . l Attcchment to WO 95-0047

.- DOCKET NO. 50-492

~

WOLF CREEK GENERATING STATION

' . . WOLF CREEK NUCLEAR OPERATING CORPORATION l

, DATE 3-03-95 l TELEPHONE 316-364-8831

' MONTH- February, 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i (MWe-Net) (MWe-Net) )

1 1187 17 1189  !

2 1180 18 1188 f

3 1184 19 1188 4 1187 20 1188

'S 1187 21 1189

.f 6 1187 22 1188 7 1186 23 1172 8 1186 24 1180 i

i 9 1180 25 1186 t 10 1189 26 1186 i 11 1108 27 1185  ;

12 1188 28 1185 i 13 1188 29 N/A f 14 1188 30 N/A  ;

15 1188 31 N/A 26 1182 P

i Wolf Creek Generating Station 7 Monthly Operating Report i February, 1995 Page 4 of.6

Attachment to WO 95-0047 .

UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO. 50r482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 3-03-95 TELEPHONE 316-364-8932' Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS '

No Date S: SCHEDULED (Hours) (1) OR REDUCING POWER (2)

None

SUMMARY

The unit operated at or near 100% for the month of February, 1995.

1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUIVMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUED
5. REDUCED LOAD
9. OTHER Wolf Creek Generating Station Monthly Operating Report February, 1995 Page 5 of 6

l

, Attachnient to WO 95-0047 WOLF CREEK NUCLEAR OPERATING CORPORATION WOLF CREEK GENERATING STATION UNIT NO. 1 MONTH February, 1995

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating . experiences for this month which required load reduction or resulted in significant non-load related incidents.

DATE TIME EVENT None None None 1

Wolf Creek Generating Station  !

Monthly Operating Report I February, 1995 Page 6 of 6