Forwards Signed Affidavit & Resume of Z Zizak Assigned to Const Implementation Overview Staff
ML20081A966
Person / Time
Site: Midland
Issue date: 02/24/1984
From: Karr J
STONE & WEBSTER, INC.
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
OL, OM, SWM-033, SWM-33, NUDOCS 8403060411
Download: ML20081A966 (5)


Text

- - _ _ _ _ _ - _ _ - _

l P9Jf;OiPAL ST/ FF l

n ntana STONE 8: WEBSTER MICHIGAN, INC.

),

P.O. Box 2325. BOSTON. M ASSACHUSETTS O2107 R% g,93 gj /.

g;3 50- M9

]

l-y f-)

Sb - SD

~

Mr. J. J. Harrison February 24, 1984 Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

DOCKET N0. 50-329-330 MIDLAND NUCLEAR C0 GENERATION PLANT RESUMES AND AFFIDAVITS FOR CIO STAFF MEMBERS SERIAL N0. SWM - 033 Attached is the signed affidavit and resume for Mr. Z. Zizak, who has been assigned to the CIO staff at the Midland Nuclear Plant.

t)

J.E. Karr CIO Program Manager Enclosures JJR/als cc: CIO General Files 9

1 8403060411 840224 PDR ADOCK 05000329 8

1@f i \\

Figure 3-1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket No. 50-329 OM CONSUMERS POWER COMPANY 50-330 OM (Midland Plant, Units 1 and 2)

Docket No. 50-329 OL 50-330 OL AFFIDAVIT OF ZELJK0 ZIZAK My name is Zeljko Zizak I am employed by Stone & Webster Michigan, Inc.

as Quality Assurance Engineer I am currently assigned to the team which is proposed to conduct a Third Party Construction Implementation Overview at the Midland Nuclear Plant site.

Prior to being given this assignment, I have never worked on any job or task associated with the Midland Project, or any job or task fc." or on behalf of Consumers Power Company or Bechtel relating to issues that I will be re-viewing.

I have never been employed by Consumers Power Company or Bechtel.

I do not own any shares of Consumers Power Company or Bechtel stock. Mutual funds or other funds in which I may have a beneficial interest, but over which I have no control, may own shares of Consumers Power Company or Bechtel stock, of which I am unaware. A list of such funds in which I have an interest are attached.

I have no relatives which are or have been employed by Consumers Power Company or Bechtel.

e!

Signe

/

Sworn and Subscribed Before Me This 43 Day of February 1984 erz 0 Au NOTARTPpBLIC mirHCIA A. FUhn -

e fictary Public, Bay Countf. M5

/

tIdx C'xmnissican Expires Mar. 4, D%

My Commission Expires

&V-86

February 1984 ZIZAK, ZELJX0 QUALITY ASSURANCE PROJECT ADVISORY GROUP EDUCATION Nautical College, Split, Yugoslavia, four years National Board of Boilers and Pressurc Vessels Inspector Shool Non-Destructive Examination Course Authorized Inspector School (AI)

Authorized Nuclear Inspect 3r School (ANI)

National Board School for ANI All of the above courses consisted of: General theory involved in Non-Destructive Examination, Quality Control systems, Quality Assurance systems, Audit systems, Welding General Shop Inspection procedures, specific requirements of the ASME Code Section I, III, IV, V, VIII and IX.

EXPERIENCE

SUMMARY

Mr. Zizak has 10 years of experience in the Quality Assurance / Quality Control Inspection Industry. Currently, as Quality Assurance Engineer, he is assigned to Project Advisory Group.

Prior to joining SWEC, Mr. Zizak was a Quality Control Manager for Cherne Con-tracting Corporation, were he was responsible for all Quality Control Depart-ment at Marble Hill Construction ' site.

Prior to joining Cherne Contracting Corporation Mr. Zizak was a Quality Verification Supervisor for J. A. Jones Construction Company, NC., were he was responsible for planning, scheduling and controlling group activites.

Prior to Joining J. A. Jones Construction Company, Mr. Zizak was a authorized Nuclear Inspector for Hartford Steam Boiler inspection and Insurance Company.

PROFESSIONAL AFFILIATIONS National Board of Boilers and Unfired Presser Vessels Inspector - Member Marine Engineer - Reg. No.162/68BS

O 4

DETAILED EXPERIENCE RECORD ZIZAK, ZELJK0 99825 STONE & WEBSTER ENGINEERING CORPORATION, BOSTON, MA (Feb 1984 to Present)

Project Advisory Group - Feb 1984 Appointments Project Advisory Group (Feb 1984 to Present)

As QUALITY ASSURANCE ENGINEER, assigned to the Construction Implementation Overview Group. Mr. Zizak was responsible for monitoring the effectiveness of the Constructicn Completion Program. Evaluation of predetermined procedures and instructions, and quality practices utilized in the construction of the Midland Plant Units 1, 2 and the effectiveness of those practices.

Cherne Contracting Corporation, Minneapolis, MN (Jan 1983 to Feb 1984)

Quality Assurance Department - Jan 1983 to Feb 1984 Appointments:

As QUALITY CONTROL MANAGER at Marble Hill Nuclear Generating Station, responsible for the hiring, supervisors and inspectors. Manager over five (5) supervisors and up to one hundred and ten (110) inspectors. Cherne was a mechanical con-tractor at the Marble Hill Site working the Containments, Auxiliaries, and Turbine buildings for Units 1 and 2. We were responsible for inspection of piping, component support, instrumentation, receiving, equipment installation, and NDE examinations. In July of 1983, Cherne Contracting Corporation did obtain the ASME certificate of authorization for NA and NPT stamp. No violations or findings were identified in the Quality Control department by the ASME rep-resentative, State of Indiana, or NRC personnel from the day Mr. Zizak was hired in. Act as Project QA Manager at the time when the Project QA Manager was absent from the Marble Hill Job-site.

J.A. Jones Construction Company, Charlotte, NC (Feb 1980 to Jan 1983)

Quality Assurance Department - Feb 1980 to Jan 1983 Appointments:

As QUALITY VERIFICATION LEAD SUPERVISOR at WPPSS Unit 1 and 4, responsible for Containment, General Services, and Turbine Generator buildings for the in-stallation of all equipment, piping and of all NSSS piping and components.

Responsibilities include planning, scheduling, and controlling group activities, assuring preparation and maintenance of required reports and documents and evaluating personnel performances. Scheduling training program for problems detected.

2 l

-= -

1 f

ZZ Hartford Steam Boiler Inspection and Insurance Company, Seattle, WA (Sept 1974 to Feb 1980)

Inspector - Sept 1974 to Feb 1980 Appointments:

[

As AUlHORIZED NUCLEAR INSPECTOR (June 1977 to Feb 1980), responsibilities in-cluded monitoring Quality Assurance Program, verifying material compliance with applicable ASME Code requirements, traceability, examination, welding procedures, witness non-destructive examination and perform required inspection by the various ASME Code Section requirements.

Did inspections for the Following Hanford Contractor:

J.A. Jones Construction Company; J.A. Jones Construction Services Company; Westinghouse Hanford Company FFTF; Westinghouse Hanford Company 300 Area; General Electric Company, WNP-2; Johnson Controls, Inc., WNP-2; B.F. Shaw (QA Representative for WNP-1/4; Bovee and Crail Construction Company and General Energy Resources, Inc.

(changed to WHS/B0 ECON /GERI).

As AUTHORIZED NUCLEAR INSPECTOR, (Jan 1977 to June 1977), responsible for 4

inspection on new construction of boilers and unfired pressure vessels at National Steel, Cam Industries and Seattle Boiler Worksi.

As INSURANCE INSPECTOR (Sept 1974 to Jan 1977), responsible for inspection on boilers, unfired pressure vessels, air conditioning, electrical motors and

. pumps for insurance purposes against explosion, wear and tear in-service and idle positions.

l Olga Steamship Company, London England (Apr 1969 to Mar 1973) i Assistant Engineer - Apr 1969 to Mar 1973 J

l Appointments:

l As 3rd ASSISTANT ENGINEER (Apr 1969 to June 1971), responsible for supervision i

of operation and maintenance of all engine room and equipment during work shift.

Responsibilities also included supervision of boiler, oil purifiers, clarifiers, separators and air compressors.

As 2nd ASSISTANT ENGINEER, (Nov 1971 to Mar 1973), responsible for supervison of operation and maintenance of all engine room and equipment during work shift. Responsibilities also included supervision of auxiliary engines and turbines, generators, and all electric motors and pumps.