ML20081A725

From kanterella
Jump to navigation Jump to search
Forwards Revs 39,40,41 & 42 to QA Policy for Ccnpp
ML20081A725
Person / Time
Site: Calvert Cliffs  
Issue date: 03/09/1995
From: Denton R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20081A726 List:
References
NUDOCS 9503150263
Download: ML20081A725 (1)


Text

1 ROBERT E. DENToN Baltimore Gas and Electric Company Calvert Giffs Nuclear Power Plant Vice President 1650 Calvert Giffs Parkway Nuclear energy Lusby, Maryland 20657 410 586-2200 Ext.4455 local 410 260-4455 Baltimore March 9,1995 i

U. S. Nuclear R.egulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk SUllJECT:

Calvert Clifts Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Ouality Assurance Poliev - Revisions 39. 40. 41. and 42 l

1 Enclosed are Revisions 39,40,41, and 42 to our Quality Assurance Policy submitted in accordance with 10 CFR 50.54(a)(3). This information which was due last November, is submitted late due to an administrative error.

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, i

C W

RED /DWM/bjd v

Enclosures cc:

(Without Enclosures)

D. A. Brune, Esquire j

J. E. Silberg, Esquire L. B. Marsh, NRC D. G Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R.1. McLean, DNR J.11. Walter, PSC D0 9503150263 950309 PDR ADOCK 05000317 g\\

p PDR

\\

-