ML20080U219
| ML20080U219 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 01/31/1984 |
| From: | Mcnamara A, Snow B ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8403020202 | |
| Download: ML20080U219 (5) | |
Text
. -
1
+
OPERATING [ ATA REPORT DOCKET NO.
50-244 DATE February 10, 1984 COMPLETED BY D f*WI D v
Andrew E. Mctlam&ra TELEPil0NE (315) S?4-4446 OPERATING STATUS ext. 301 at Ginna
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes
- 2. Reporting Period:
January, 1984 The reactor power level was 1520
- 3. Licensed Thermal Power (MWr):
maintained at 100% for the majority of the report period,
- 4. Nameplate Rating (Gross MWe):
470 with one exception, detailed
- 5. Design Electrical Rating (Net MWe):
3, 490
- 6. Maximum Dependable Capacity (Gross MWe):
470
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Sirice Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr..to Date Cumulative
- 11. Ilours In Reporting Period 744.00 744.0a 124,32n_an 744.00 744.00 04,343.08
- 12. Number of flours Reactor Was Critical 0
0 1,631.32*
- 13. Reactor Reserve Shutdown flours 744.00 744.00 02,255.63
- 14. Ilours Generator On-Line
- 15. Unit Reserve Shutdown flours 1,114,992 1,114,992 127,377,361
- 16. Gross Thermal Energy Generated (MWil) 370,849 370,840
_41,535,710
- 17. Gross Electrical Energy Generated (MWil) 352,963 352,963 3o,379,708
- 18. Net Electrical Energy Generated (MWil) 100" 100%
74.71%
19.' Unit Service Factor 00%
7CM
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 100.94%
100.94%
A9_1 R%
100.94%
100.94%
69.18%
- 22. Unit Capacity Factor (Using DER Net) 0%
0%
7.06%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
March 3, 1084: Annual Refuelina and Maintenance - Annrnvimately 65 dave duration
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Foreca st Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cummulative total commencing January 1, 1975 49 50 t R E V.
1/78) 8403020202 840131M f
b r
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT
- 1, Ginna Station DATE February 10, 1984 COMPLETED BY Andrew E.
McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH January, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PONER LEVEL (MWe-Net)
(!f.fc-Net) 1.
479' 17.
480 2.
480 18.
482 3.
480 19.
481 4.
480 20.
481 5.
481 21.
480 6.
478 22.
481 7.
481 23.
481 8.
480-24.
481 9.
345 25.
481 10.
434 26.
480 11.
476 27.
481 12.
477 28.
480 13.
480 29.
480 14.
481 30.
481 15.
480 31.
480
'16.
480 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
~
IXX:KET NO.
50-244' UNIT NAME #1,Ginna Statira
- UNIT SNUTDOWN AND POWER REDUCTIONS DATE February 10, 1084 COMPLETED liY Andrew E. McNamara REPORT MONTil f = m ey - 1084 TELEPilONE O15) 574-4446
~ ext. 301 at Ginna m
}I 1
Licensee e,:
.E q Couse & Corrective e
- No.
Dt ne
.{
jj
{,e Event-j4 1j
' Action to p
gZ.
y
.ge
~ Report #
gj lU Prevent Recurrence s
g u
o
- PR-001 01/09/84 F
21 A-N/A N'/A CH HTEXCH POWER REDtfCTIO!! TO APPROXIMATELY 45%
REACTOR POWER LEVEL TO REPAIR LEAKING OIL COOLER,18 MAIN FEEDWATER PUMP.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data Il '.!aintenance or Test Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Orvrator Training & License Examination -
F-Administrative 5
G-Operational Error (Explain) ll-Other (Explain)
Exhibit 1 - Same Source
..... i n e v.
're,
- PR - POWER REDUCTION
l NARRATIVE SUBSIARY OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT Ginna Station, Unit #1 DATE-February 10, 1984 COMPLETED BY Andrew E. McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH January, 1984
.The' reactor-power level was maintained at the 100% level for the majoritg of the report period, with the following exception:
On 1/9 the reactor power level was' reduced to ~ 45% to-effect repairs oon a leaking oil cooler, 1B Main Feedwater-Pump.
The reactor power level was restored to 100% after-repairs were completed and remained there until the end of-the report period.
y-
..?~
I.._
Pcge 5 GINNA STATION
-Maintenance Report Summary January, 1984
-During the month of JaLuary, routine inspections and maintenance were completed.
Safety-relatcd maintenance included replacement of pressurizer-steam space manual isolation valve, V-956E-and repair of the 1B Charging Pump.Varidrive.
fi;
,/
j- -rg "i
pg?g5W1-is? juu fy.t.
.,l,'i 7 bym. - t Ibcd" hits '
y,j 2
ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.14649 M
rettewoNr a.ta coot 7i. 546-2700 GINNA STATION February 10, 1984 Director,, Office of Management Information and Program Analysis
.U.S.
NUCLEAR REGULATORY COMMISSION
. Washington, DC 20555
Subject:
Monthly Report for January, 1984 Operating Status Information
'R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244
Dear Sir:
~ Pursuant to our Technical. Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for :the month of January,1984 i
Very truly yours, Bruce A. Snow Plant Superintendent BAS /cib-
. Attachments cca Dr. Thomas E.
Murley NRC (1)
I f
E