ML20080T924

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1984
ML20080T924
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1984
From: Cowan K, Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8403020097
Download: ML20080T924 (4)


Text

.

?.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT l#1P-2 DATE 02/09/84

j. K.O. Cowan COMPLETED BY TELEPHONE (509) 377-2501 X2815 I

MONTH January 1984 l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net)  ;

1 0 0 37 2 0 0

__ is 3 0 0 3, ,

4 0 g o 5 0

.. 21 0 s O n 0 7 0 n 0 s 0

,, o g 0 0 3  !

10 0 2s 0 11 0 0 27  ;

12 0 0 2s 13 0 0 29 14 0 3 0 15 0 0 33 r

is 0~

NOTE: Initial criticality achieved January 19, 1984 at 2143. This condition was achieved in Plant Mode 5.

INSTRUCTIONS On this form, list the awrap daily unit power level in MWe Net for each day in the reparting month. Compute to the

r.earest whole mepwatt.

These Agures wdl be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used fo dw not electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet shoulJ be footnoted to explam the apparent anomaly.

8403020097 840131 PDR ADOCK 05000209 R PDR

OPERATING DATA REPORT DOCKET NO. 50-397 UNIT IdNP-7 DATE '17/04/M COMPLETED BY On rma n __ ,,

TELEPHONE (509) 377-2501 '

X2815 OPERATING STATUS

1. REPORTING PERIOD:

January 1984 GROSS HOURS IN REPORTING PERIOD: 0

2. CURRENTLY AUTHORIZED POWER LEVEL (MWti: 166 MAX. DEPEND. CAPACITY (MWe-Net): 11CO DESIGN ELECTRICAL RATING (MWo. Net): 1100
3. POWER LEVEL TO WHICH RESTRICTED (lF ANY) (MWe Net): 51 Grnte B&l
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUM88R OF HOURS REACTOR WAS CRITICAL , . . . . . . . . . . . . . 13.93 13.93 13.93
6. REACTOR RESERVE SHUTDOY N HOURS . . . . . . . . . . . . . . . . . . .

0 0 __ 0 0 0 0

7. HOURS GENER ATOR ON LI NE . . . . . . . . . . . . . . . . . . . . . . . . . .
8. UNIT RESERVE SHUTDOWN HOURS ......................

0 0 __

0

9. GROSS THERMAL ENERGY GENERATf D (MWH) ..............

0 0 0

10. GROSS ELECTRICAL ENE.9GY GENERATED (MWH) . . . . . . . . . . . . . 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (MWH) .............,

0 0 0

~

12. R EACTOR SE RVICd F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A _N/A N/A
13. REACTOR AVAILABILITY FACTOR . . . . . . . . . . . . . . . . . . . . . . . _ N/A N/A N/A
14. UNIT SERVICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A l5. ' UNIT AVAILA88 UTY F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A
16. UPIT CAPACITY FACTOR (Using MDC) ..................... N/A N/A N/A
17. UNIT CAPAC?TY FACTOR (Using Design MWe) ..... . .........

N/A N/A N/A

18. UNIT FORCED OUTAGE RATE . . . . . . . . . . . . . . . . . . . . . . . . . . N/A N/A N/A 1s. SauTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPJ. DATE. AND DURATION OF EACHl: 03/29/84 to 04/03/84, 04/25/84 to 04/27/84, and 05/11/84 to 05/21/84; all for maintenance during the power
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ascension phase.
21. UNITS IN TEST STATUS IPRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITI AL CRITICALITY 01/16/84 01/19/_M INITIAL ELECT'ICITY 03/18/84 COMMERCIAL CPERATION 07/01/84 I .

DOCKET NO. 50-397 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME W "2 ,

l) ATE 02/09/84 COMPLETED BY _ K.D. Cowan REPORTMONTH January 1984 TELEPilONE (509) 377-2501 X2815 METt900 OF

. TYPE SHUTTING DOWN -

F: FORCED DURATION THE REACTOR OR NO. DATE 5: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2)- CORRECTIVE ACTIONS / COMMENTS 840119 F 29.67 A 1 IRM li,B&D failed to respond to increasing neutron flux. Per Tech Spec, suspended operations and inserted control rods.

840121 S 10.42 B 1 Full core shutdown margin demonstration; test completed.

840123 S 209.35 B 1 Open drywell for entry; perform scheduled tests and maintenance.

SUMMARY

i (t) REASON E: OPERATOR TRAINING ANI) (2) METilOD i A: EQUIPMENT FAILURE (EXPLAIN) LICENSE EXAMINAllON 1: MANUAL D: SIAIN r. OR TEST F: ADMINIS1 R ATIVE 2: MANUALSCRAM.

C: REFUl:1 ING C: OPI R ATIONAL I RRoR (EXPLAIN) 3: AUIOMATIC SCR AM 4: OTilER lEXPLAIN)

D: Rt.GULATORY RESTRICriON II: OIllER (EXPl.AINI

w. .c Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland Washington 99352 (509)372-5000 Docket No. 50-397 February 9, 1984 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PROJECT NO. 2 MDNTHLY OPERATING REPORT Trar,smitted herewith is the Monthly Operating Report as required by our Techr.ical Specifications.

Very truly yours, J. D.

- 84 a tin (927M) /

hv WNP-2 Plant Manager JDM:1p Enclosure -

cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site

'h

- -_ --- ----- - - - - - --