tt3e h brese t /4 Consumem POVict Company Midland Project: Po Box 1963, Midland, MI 48640. (Sin 6314650 October 17, 1983 Mr J J Harrison Midland Project Section U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File:
0485.16 UFI:
42*05*22*04 Serial: CSC-6955 12*32 We have completed our review of the documents for the activities below.
Based on our review, we concluded that we are ready to start the work:
155052340 Finger drift to, excavate, install and load Pier KC8 165052340 Finger drift to, excavate, install and load Pier KC5 165052375 Complete drift KC4 to CT1 155052375 Complete drift KC9 to CT12 155052045 Drift to/ access pit at Pier E-15 excavate and install Pier E-15 165052045 Drift to/ access pit at Pier W-15 excavate and install Pier W-15 155052055 Access pit at Pier E-16.
Excavate, install and load Pier E-16 165052055 Access pit at Pier W-16.
Excavate, install and load Pier W-16 155052075 Drift to Pier E-17 from E-16.
Excavate, install and load Pier E-17 165052075 Drift to Pier W-17 from'W-16.
Excavate, install and load Pier W-17 207050783 Excavate, lag, brace and install vales and struts, pour and cure concrete mudmat in lower east section of SWPS access 618'16" excluding localized excavation.)g excavate to EL shaft (soldier piles 15 thru 30 - maximu 207050784 Excavate, lag, brace and install vales and struts, pour and cure concrete mudmat in lower west section of SWPS access shaft (soldier pilts 1 thru 14 - maximum excavation to EL 618'16" excluding localized excavation.)5 0310250507 831019 PDR ADOCK 05000329 A
PDR OC1083-0001A-CN01 r
n
i According to the NRC/CPCo Work Authorization Procedure, we request aut-horization for the above activities.
Dean L. Qua Site Manager DLQ/AEB/klm k
4 4
i a
OC1083-0001A-CN01