ML20080S785

From kanterella
Jump to navigation Jump to search
Organizational Chart for Nuclear Operations Support Dept
ML20080S785
Person / Time
Site: Pilgrim
Issue date: 10/12/1983
From:
BOSTON EDISON CO.
To:
Shared Package
ML20080S780 List:
References
NUDOCS 8310180496
Download: ML20080S785 (2)


Text

_ _

Chief Executive Officer imm Ed

[E RS Sr. Vice President Nuclear Om 8S Director of Nuclear Safety Review _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,

oo Operations Review and Audit Committee I

@u (On-site) i l

i On-site Safety &

l Performance Group) Leader I

(ORO (On-site j

I i

I Vice President Vice President l

Nuclear Engineering and Nuclear Operations g

l Quality Assurance l,

I,'

I I

I I

I I

l Quality Assurance Nuclear Engineering Nuclear Management Nuclear Training Nuclear Operations Nuclear Operations Manager Services Department Department Support Department Department l

(Off-si.e)

(Off-site)

(Off-Site)

(Off-site)

(On-site)

(On-site)

I Manager I

I Operations Review Committee (On-site)

Plant Staff Boston Edison Company -

(On-site)

Organization for Operation of Pilgrim I

- 209 -

PILGRIM NUCLEAR POWER STATION STATION MANAGER (0RC)

CHIEF OPERATING CHIEF CHIEF CHIEF ENGINEER (0RC)

MAINTENANCE RADIOLOGICAL TECHNICAL (SRO)

ENGINEER (0C)

ENGINEER (0RC)

ENGINEER (ORC)

WATCH TECHNICAL TECHNICAL TECHNICAL ENGINE.ER(S)

STAFF STAFF STAFF (SRO)

  • Mechanical
  • Radiation
  • 0n-site Protection Engineering
  • Electrical
  • Chemistry

. Reactor

  • Instrumentation Engineering OPERATING

& Control SUPERVISOR (S)

(RO)

Code:

Member of ORC ORC R0

- NRC Reactor Operator License SR0 - NRC Senior Reactor Operator License NUCLEAR PLANT OPERATOR Pilgrim Station Organization Figure 6.2.2

- 210 -