ML20080S785

From kanterella
Jump to navigation Jump to search
Organizational Chart for Nuclear Operations Support Dept
ML20080S785
Person / Time
Site: Pilgrim
Issue date: 10/12/1983
From:
BOSTON EDISON CO.
To:
Shared Package
ML20080S780 List:
References
NUDOCS 8310180496
Download: ML20080S785 (2)


Text

_ _ _ _ _ . . - - _ .-_ -. _ _ _ - _ _ _ _ _.

Chief imm Executive Officer Ed

[E RS Sr. Vice President Nuclear Om 8S Director of Nuclear Safety Review oo _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,

'$ Operations Review and Audit Committee I

@u (On-site) i l

i On-site Safety &

I jl Performance Group) Leader (ORO (On-site I

i

. I Vice President Vice President l

, Nuclear Engineering and Nuclear Operations g

l Quality Assurance l, I,' I I I I I I l Nuclear Training Nuclear Operations Nuclear Operations !

Nuclear Engineering Nuclear Management Quality Assurance Services Department Department Support Department Department l Manager Manager (Off-site) (On-site) (On-site) I (Off-si.e) (Off-site) (Off-Site) I I

Operations Review Committee (On-site)

Boston Edison Company - Plant Staff Organization for Operation of Pilgrim I (On-site)

- 209 -

PILGRIM NUCLEAR POWER STATION .

STATION MANAGER (0RC)

CHIEF OPERATING CHIEF CHIEF CHIEF MAINTENANCE RADIOLOGICAL TECHNICAL ENGINEER (0RC)

(SRO) ENGINEER (0C) ENGINEER (0RC) ENGINEER (ORC)

WATCH TECHNICAL TECHNICAL TECHNICAL STAFF STAFF STAFF ENGINE.ER(S)

(SRO)

  • Mechanical
  • Radiation *0n-site Protection Engineering
  • Electrical
  • Chemistry . Reactor
  • Instrumentation ,

Engineering OPERATING & Control SUPERVISOR (S)

(RO)

Code:

ORC -

Member of ORC R0 - NRC Reactor Operator License SR0 - NRC Senior Reactor Operator License NUCLEAR PLANT OPERATOR Pilgrim Station Organization Figure 6.2.2

- 210 -