-,_ _ _._____ _ ___. _______. -. _ _ _ _ _. -. _ _ _ _ _
r 1 NUMBER OF PERSONNEL AND MAN-REM EXPOSURE BY WORK AND JOB FUNCTION l
Number of Parsonnel ( > 100 crcm)
Total Man-Rea
, ]
WORK AND JOB FUNCTION Station Utility Contract Workers-Station Utility Contract Workers,l Employees Employees and Others Employees Employees and Others l
REACTOR OPERATIONS AND SURVEILIANCE Maintenance Personnel 78 13 717 15.070 2.650 85.080 Opercting Personnel 70 24.630 llealth Physics Personnel 54 1
70 14.400 0.080 5.790 Supervisory Personnel 69 85 54 21.595 21.365 5.085 Engineering Personnel 38 32 164 8.730 5.085 12.905 ROUTINE MAINTENANCE Maintenance Personnel 90 6
499 64.430 2.705 108.690 l
Operating Personnel 46 9.300 lisalth Physics Personnel 36 85 9.220 12.485 Supervisory Personnel 44 17 26 15.795 2.145 3.345 Engineering Personnel 23 3
76 7.340 0.345 11.670 l
INSERVICE INSPECTION Maintenance Personnel 66 27.245 Operating Personnel lisalth Physics Personnel 1
12 0.295 4.740 1
Supervisory Personnel 2
12 0.240 5.545 j
Engineering Personnel 3
16 0.250 5.670 A
B402290202 831231 i
PDR ADOCK 05000293 R
NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION
_f Number of Personnel ( OP 100 mrem)
Total Man-Rem WORK AND JOB FUNCTION Station Utility Contract Workers Station Utility Contract Workers-Employees Employees and Others Employees Employees and Others SPECIAL MAINTENANCE Maintenance Personnel 35 4
336 3.875 0.695 252.755 Operating Personnel 25 1.775 H;alth Physics Personnel 27 37 5.810 7.760 Supervisory Personnel 18 5
15 2.925 0.180 1.880 Engineering Personnel 8
1 44 1.065 0.070 11.535 WASTE PROCESSING Maintenance Personnel 48 2
35 9.305 0.080 8.060 Operating Personnel 14 11.545 Health Physics Personnel 24 29 5.400 7.465 Supervisory Personnet 5
1 0.625 0.500 Engineering Personnel 2
4 0.065 1.160 REFUELING Maintenance Personnel 50 2
19 15.775 0.790 1.605 Operating Personnel 28 1.265 Health Physics Personnel 8
18 0.120 1.715 Supervisory Personnel 15 2
2 2.360 0.035 0.065 Engineering Personnel 8
9 0.595 0.270
- TOTAL Maintenance Personnel 301 (136) 27 ( 16) 1672 (1289) 108.455 6.920 483.435 Operating Personnel 183 ( 74) 48.515 Health Physics Personnel 150 ( 62) 1 (
1) 251 ( 135) 35.245 0.080 39.955 Supervisory Personnel 153 ( 91) 109 (100) 110 ( 88) 43.540 23.725 16.420 Engineering Personnel U2 ( 58) 36 ( 33) 313 ( 243) 18.045 5.500 43.210 GRAND TOTAL 869 (421) 173 (150, 2346 (1755) 253.800 36.225 583.020
- The total number of persont el is higher than the true 1 otal due to some ind viduals being reported under more than one catagory.
The true total I wmber of per: onnel is shown in parenthesis, s
7...
PNPS RADIATION EXPOSURE NRC MANMTED REQUIREMENIS (01/01/83 - 12/31/83)
CATAGORY.
EXPOSURE (MAN REM)
IMI Modifications 108.755 Blockwalls 0.235 L:
Torus Intemal/ External Modifications.
32.470 Pipe Support llangers/ Bolts 68.370 Scram Discharge Electrical 34.280
'As Built Walkdowns 1.085 1UIAL 245.195
EOSTON EDISON COMPANY 500 BOYLSTON ETREET SOSTON, MASSACHUBETTS D2199
- WILLIAt4 c. HARRINGTON egreen wees reseassuv ts% Leam
-y 9$
o February 10, 1984 BECo. #84-025 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 631 Park Avenue King of Prussia, PA 19406
Dear Sir:
In'accordance with the reporting requirements of U. S. NRC Regulatory Guide 1.16, Pilgrim Nuclear Power Station is forwarding the enclosed annual report regarding personnel and man-tem exposure by job function.
Sincerely, W. D. Harrington WDH/ko cc: Messrs.
A. L. Oxsen J. E. Howard H. F. Brannan P. A. Foulsham A. R. Trudeau Boston Edison Reading Room American Nuclear Insurers L