Forwards Revised Master Restart Schedule,Revised to Include Work on Reactor Coolant Pump 1B Prior to Precritical non-nuclear Hot Functional Testing
ML20080R702
Person / Time
Site: Crane 
Issue date: 02/23/1984
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
5211-84-2041, NUDOCS 8402280381
Download: ML20080R702 (2)


Text

-

J Nuclear tue;fer""

Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

February 23, 1984 5211-84-2041 Office of Nuclear Reactor Regulation Attn:

H. Denton, Director U. 3. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Master Restart Schedule The attached master restart schedule has been revised to include work on reactor coolant pump 1B prior to precritical non-nuclear hot functional testing. Vibration problems necessitate inspection of the pump shaft.

This work will not impact our scheduled capability of June 1, 1984 criticality. We reiterate our pending request for approval to perform the hot testing program.

In order to take best advantage of this " precritical" period, we have scheduled the completion of the other major work items and surveillances, including containment integrated leak rate testing. Modifications for which milestone delays are perceived will be rescheduled beyond restart.

None of the above modifications or plant activities will preclude our ability to complete precritical non-nuclear hot functional testing prior to June 1, 1984.

Sincerely, f

1. D. H ill Director, TMI-l HDH: RAS:vj f Attachment cc:

J. F. Stolz H. Silver J. Van Vliet R. Conte 8402280381 040223 p/

PDR ADOCK 05000289 P

PDR I

GPU Nuclear Corpcration is a subsidiary of the General Public Utilities Corporation

N' PROVED BY:

1 I

GPU PRELEM CORPORATION Baseline Revision 2

Datz: -~02/21/84 TMI-I H. D. Hukill A MASTm RESTmT SCEDLLE Revision No.

Date:

7.

A at or IM1-1 MAJOR EVELUTIONS SLDHWlY R. J. Toole l 'f

/-/dM (ASSlDES 06/01/84 RESTmT) tbdate No.

Date:

O Q 1 rector TMI-l l

FEBRUARY l

MNtCH l

APRIL MAY i

ME l

JR Y AUGUST SEPTDBER OCTWER EDGER l

l-l l

l MRJLE PLANI M.;IIVIIIt.5 Flll RCS &

l l

I l

Test Pump 1B l

1 l

l Repair RC-P-10 1 1 l-l l

f I

I l

I l Prep for RB IILRT (LLRT & INST)l IILRTl-l l

l l

l l

l l

l J

J Balance RCPs l

l l

l I

I I

Inspect PN V l l l,l as RegJired/

l l

l l

l l

l l

Maintain l

I I

I I

I Remove I

l lWet Lay w l-l I

l l

l l

I Reinstall I

Handholes/l Dry l l/l llFTl"l l-l

[

100E Pwr l-l Install i

HandholePI l

l2Al l

l 31 Operations l

I l Layte-l Covers l

,,,4,l1 l Eddy l

l Dehumids 11 l

lI *

-1 lZPPTI-l 485 Pwr 7 755 Pwr l

ll Operator I:

Operator l

l Current i

Criticality 06/01/84 I

IReplace I

l ll-lTrainino l-l-l Trainino l l l-l l

l"l Outace 1"l l

sit i

I I

/i i

I l

l Marway I

'l I

l l

505 Pwr + 120

/l l

l l

l-l Gasketsi l ll 8

l

)

l l

l l

l l

l l

I l WUOR MOURIGAIION5 i

l 1

1 I

I I

[ Prep for 8th l

l l

l l

l Stage Heaters l"l Replace 8th Stage Heaters l"l l

l l

l l

1 1

I I

I I

I I

I l

l Hydro & I Compl. IWL l

l l

l l

l l

l l

l Elec Ck.! Head l

l l

l l

l l

l l

l lHd Ventl lVent l-l IConpl. Head Vent l

l l

l l

l l Improve Eng. Date CRD Constnjet Test CRD l Shunt Trip to Mid Mar.

1 1 mD Shunt Trip lShunt Tripl l l

l r

l l

l l

l IIssue Test IRM-L-12 Eno I"lConpl. Const.l"lRM-L-121 1 1

17 l

l l

I i

l l

l3--

l l

l l

l l Helium Leak Test I

(

H l

nt Hold poin (Flag) l l Mana for RM-13H Il l

Remove U-2 Atmos Install Vlv. Fit l

1 l

l l

l I"lDune Vlvs l lBodies I l Internals 1 1 l

l l

l l

I I

Mac I

IPlant i

l l

l l

l l

l l

l l

l l

Change Cables m Ptmps 1 1 Test l-l lExpedite Erg. for l

ILRT l

1:

1 Legend l

.l l"AterInventory l-l Constructl lDelayl lConstructl l l

l l

l Baseline l

l I

i i

l EFW Long Tem tbgrade-Recire 1

(

l l

l l

l l lLine Reroute & Steports Atmos. Disnpl-l l

l l

Forecast +++++++++++ l l

lI Control Tower Spray on Fireproofino l-l l

l l

l l

l l

l l

l l

l l

l l

l Area Over C.R.

l l

'l 1

PLANS & PROGRAMS DEPT. TMI-l 1

l l

l u__

_