ML20080R013
| ML20080R013 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/15/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| W3K84-0325, W3K84-325, NUDOCS 8402280017 | |
| Download: ML20080R013 (2) | |
Text
..%. *n B
POWER & L1GHT 142 DELARONDE STREET F o box 6008. NEW ORLEANS. LOUISIANA 70174 * (5041 366 2345 UrTOYsdYS February 15, 1984 W3K84-0325 Q-3-A35.07.90
@@b Mr. John T. Collins Regional Administrator, Region IV b
j% <
U. S. Nuclear Regulatory Commission v
7 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
REFERENCE:
LP&L letter W3K83-1572 dated October 14, 1983
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 90
" Electrical Conduit Overstressed" Second Interim Report The above referenced letter indicated submitted of the Final Report to the USNRC on February 15, 1984.
Due to the extended analysis and accessibility to implement required corrective action, completion is now scheduled for March 30, 1984.
A Final Report will be submitted to the USNRC on April 13, 1984.
Very truly yours, W
T. F. Gerrets Corporate Qua.11ty Assurance Manager TFG:CNH:VER cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8402280017j4Mh2 PDR ADOCK PDR T E-S \\p
\\
p,.g.
Mr. John T. Collins February 15, 1984 W3K84WO325 Page 2 cc:. Director' Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
.20555 Mr. E.-L..Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson
'!!onroe-& Lemann.
1424 Whitney Building _
New Orleans, Louisiana 70130 Records Center Institute of Nuclear Power Operations 1100 Circle:75 Parkway, Suite 1500 l
Atlanta, Georgia -30339 Ig
____ _ _m