Requests Review of Westinghouse Rept, Use of Process Noise Measurements to Determine Response Characteristics in Us Plant & Approval of Use of Process Noise Sensor Response Time.Noise Measurement Acceptable Per Ser,Section 7.2.2.5
ML20080Q462
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 09/28/1983
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
7381N, NUDOCS 8310120427
Download: ML20080Q462 (1)


Text

'N Commonwrith Edison

) one First National Plaza, Chicago, Ithnois C

O Address Reply to: Post Office Box 767 Chicago Illinois 60690 September 28, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S.. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Generating Station Units 1 and 2 Braidwood Generating Station Units 1 and 2 Sensor Response Time Testing NRC Docket Nos. 50-454, 50-455, 50-456, and 50-457 References (a):

August 15, 1983, letter from E. P. Rahe, Westinghouse, to D. G. Eisenhut.

Dear Mr. Denton:

This is to request that the NRC review the Westinghouse technical report provided in reference (a) and approve the use of process noise sensor response time testing at Byron and Braidwood Stations.

This approval involves omission of License Condition 4 contemplated in the Byron SER.

As described in Section 7.2.2.5 of the Byon SER, the NRC has found computer-based process noise measurement to be an acceptable techni-que for sensor response time testing.

Because of limited experience with the technique, Westinghouse prepared the technical report provided in reference (a) to document the testing which has been done to demonstrate the validity of this technique.

Special testing is also being done at the Callaway plant.

The Byron SER indicates that special testing will also be required at Byron if the NRC review of the Westinghouse report is not completed by the time the operating license is issued.

It is requested that the NRC review promptly the Westinghouse report "The Use of Process Noise Measurements to Determine Response Characteristics in U.S. Plants," dated August, 1983.

Early completion of this review will make special testing unnecessary at Byron.

Please contact this office if there are questions regarding this matter.

One signed original and fifteen copies of this letter are provided for your use.

Very truly yours, f $ fS "

T. R.

Tramm Nuclear Licensing Administrator

]lCd3 l 1m I

9310120427 830928 PDR ADOCK 05000454 E

PDR 7381N