Informs That Fire Portion of Plant IPEEE Completion Date Now Expected to Be 951115
ML20080Q437
Person / Time
Site: Grand Gulf 
Issue date: 03/01/1995
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-95-00026, GNRO-95-26, NUDOCS 9503080356
Download: ML20080Q437 (3)


Text

-

dllII i

~~#

ENTERGY P#22"'""*'.

' 1 Gibson, MS 39150 Tel fal 437 2800 C. R. Hutchinson Vee Piesad Ocea*ons March 1, 1995 ce conme sen U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.

20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Individual Plant Examination of External Events (IPEEE) Schedule GNRO-95/00026 Gentlemen:

In a letter dated December 20, 1994, (GNRO-94/00148)

Entergy Operations, Inc. submitted the Grand Gulf Examination of External Events (IPEEE) addressing all external events with exception of internal fires.

We cammitted to providing you a realistic schedule for the submittal of the fire portion of the Grand Gulf IPEEE by 3/1/95.

The purpose of this letter is to inform you that the fire portion of the Grand Gulf IPEEE completion date is now expected to be November 15, 1995.

A meeting of Entergy Operations' facilities was held in January 1995 to compare insights, improvements and assumptions associated with the internal fire analysis in order to critically i

evaluate how these analyses were conducted.

The meeting identified and initiated actions to address several areas of possible over conservatism in the analysis. Additional models are being developed in the area of fire growth and development to reduce the currently perceived uncertaiuties in those areas.

In addition to the time required for model development and the time for analysis required to complete the IPEEE, Grand Gulf's Refueling Outage No. 7, scheduled to begin in April 1995, will j

cause an additional delay of our planned submittal.

Due to the heavy personnel demands during refueling outages, no significant progress on the IPEEE is expected during the outage.

i f lf

~

/g At Entergy Operations, we believe that the use of probabilistic safety assessment (PSA) is critical to our future ability to wisely allocate resources to safety 070034 9sosososs6 9sosoi 0

PDR ADOCK 05000416 F

PDR

~

?

Ec1 P+3.

.i 31 arch 1,1995

.GNRO-95/00026

-j Page 2 of 3 l

t l

=significant activities.

It is our intent'to not'only meet the literal comunitment to conduct an internal. fires

~

IPEEE study, but to also develop realistic useful fire risk-insights that will serve as-a future tool in reducing overall site risk.

'i Please feel free to contact Wayne Russell at (601) 437-l 2717 should you have any questions or require additional information.

i i

Yours truly, t

CRE/ WAR /amb cca Mr. J. E. Tedrow Mr. H. W. Keiser Mr. R. B. McGehee Mr. N. S. Reynolds Mr. E. L. Thomas l

Mr. Stewart D. Ebneter Regional Administrator U.S. Nuclear Regulatory Comunission Region II i

101 Marietta St.,

N.W.,

Suite 2900 Atlanta, Georgia 30323 i

Mr. P. W. O'Connor, Project Manager j

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 1353 Washington, D.C.

20555 j

I i

l

~ f l

I i

4 i

b 5

BEFORE THE

,c' UNITED STATES NUCLEAR REGULATORY COBOEISSION LICENSE NO. NPF-29

- 1 DOCKET NO. 50-413 IN THE NATTER OF MISSISSIPPI PONER ti LIGHT COBEPANY and SYSTEN ENERGY RESOURCES, INC'.

and SOUTH MISSISSIPPI ELECTRIC PONER ASSOCIATION and ENTERGY OPERATIONS, INC.

AFFIRNATION

'I, C. R. Hutchinson, being duly sworn, state that I am Vice President, Operations GGNS of Entergy Operations, Inc.; that-on behalf of Entergy Operations, Inc., System Energy Resources,-Inc.,

and South Mississippi Electric Power Association I an authorized by Entergy Operations, Inc. to sign and file with the Nuclear Regulatory Commission, this response to Generic Letter No. 88-20, Supplement 4; that I signed this response as Vice President, Operations GGNS of Entergy Operations, Inc.; and that the statements.made and the matters set forth therein are true and orrypctg p he best of my knowledge, information and belie.

/

/&

C.

R. Hutchinson STATE OF MISSISSIPPI COUNTY OF CLAIBORNE SUBSCRIBED AND SNORN TO before me, a Notary Public, in and for the Count ate above n e d, this

/F day of

-(SEAL) '

L'.

fgg;///

' (

Notary Public BORIED TIRU STEGML NOTARY SERVICE l