ML20080P550
| ML20080P550 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 02/28/1995 |
| From: | Kaup K COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9503080035 | |
| Download: ML20080P550 (1) | |
Text
.
7] commonwenhh Edison Commonwc3!!h Edison r
~
b 1' S/6EGUARDS INFORMAIl0N
\\
~ g Braidwood Nuclear Power St' ion
'OE
/ Route #1, Box 84
'v/
Braceville, Hhnois 60407 I
N#
F'0' 4 I
ne s 28o1 February 28, 1995 U.S. Nuclear Regulatory! Commission Washington, DC 20555
-Attn: Document Control Desk
Subject:
Braidwood Nuclear Power Station Units 1 and 2 Response to Notice of Violation Inspection Report Nos. 50-456/94023; 457/94023 NRC Docket Numbers 50-456 and 50-457
References:
R. J. Caniano letter to K. Kaup dated January 18, 1995, transmitting NRC Inspection Report 50-456/94023; 50-457/94023 Enclosed is Commonwealth Edison Company's (Comed) response to the Notice of Violation (NOV) which was transmitted with the letter and Inspection Report identified in the reference above.
The NOV cited two Severity Level IV violations requiring a written response.
The referenced letter also requested a discussion of the bases for development of our allowed response time as well as a justification of our ability to interpose responders within the allowed response time.
Comed's response is provided in the attachments.
If your staf f has any at astions or comments concerning this letter, please refer them to 3arry McCue, Braidwood Support Services Director, at (815)458-2801, extension 2214.
Karl I,.
up DR DO ad o
G PDR KLK/JML/mr Attachments cc:
J. B. Martin, NRC Regional Administrator - RIII R. R. Assa, Project Manager - NRR S. G. Du Pont, Senior Resident Inspector f
K. A. Strahm, Vice President PWR Operations SECURITY :ABKI!?G DOES ROT APPLY WHEN THIS oncones.t.vpsi,,ss.vpoeio.4MTE IS EP.4ME F.RW UE UG%WE f,
s '
ContmenwnMS Edinan Q
0>
070118 M,.s mcm WON
$f r;0. 4 a