ML20080P395
| ML20080P395 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/01/1995 |
| From: | Maxfield G WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19325F473 | List: |
| References | |
| NUDOCS 9503070346 | |
| Download: ML20080P395 (3) | |
Text
{{#Wiki_filter:Wisconsin ' Electnc POWER COMPANY Point Beach Nuclear Ront 6610 Nuclear Rd., Two Rivers, WI 54241 (414) M 2321 PBL 95-0073 March 1, 1995 I Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen: DOCKET NOS. 50-266 & 50 301 EMERGENCY PLAN IMPLEMENTING PROCEDUKES POINT BEACH NUCLEAR PLAtTT, UNITS 1 &2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions. Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms. Sincerely, G. J. Maxfield Manager gah Enclosure cc: NRC Resident Inspector (w/o/e) Incident Response Center, Region III Y, fpf'fQW V s 9503070346 950301 F PDR ADOCK 05000266 \\ F PDR ') A subsduyofIlisawsm Exqy Caprva&w
%gn(n]M}y[ [ $ 'l' 9+ ~ ] } y s + IS $ he ,., J s'
- ,.'m
&;$jyb x 4 4,. %w i ] m-g i r w: - Marchb 1995 J y
- e. '
l ,,t',\\ 5 -{ I' y' 7 ' [ '
- ;PUBUC DOCUMENTS s
1 HNuclear' Regulatory Conunission : 4 I N, ' ' l Document Control Desk L 7.- F
- Washington DC 20555
r yp;w . Manual:_ EPIP J ~ M Manual No.: 80: f,, q 1 'l, . ISSUE DATE: ; March 1,1995 l( JIhe following change (s) have been made to the Emergency Plan Implementing Procedures Manual. Please - ~ ~ - L remove the previous revision (s) and replace them with the updated revision (s) that are attached.' Be sure to e j remove any temporary changes pending'against these procedures. L1J EPIP Index,' Revision 28i d 2.
- EPIP Form Index, Revision 24.
i ' EPIP 1.1, Plant Operations Manager: Initial Respcase, Revision 26, 73..
- EPIP 1.1.1, Plant Operations Manager Radiological Release Evaluation, Revision 15.
l 4. 5. EPIP 1.1.2, Plant Operations Manager, General Emergency - Protective Actions, Revision 9.- 6.- ^ EPIP 2.1, State and County Agency Notification, Revision i1 - EPIP 3.3,' Notification and Response for Headquarters Support Personnel, Revision 16. ? 7.. ' EPIP 4.1, Technical Support Center Activation, Revision 22. a J 8. j < 9.' EPIP 4.4, Alternate Emergency Operations Facility (AEOF) Activation, Revision 3. y 10. EPIP 11.2, Injured Person's Immediate Care, Revision 9. i1. EPIP-12, Incident Report Form, Revision 7. l 12. EPIP-13, Status Update - Plant, Revision 2. .13. ' EPIP-13a, Status Update - Radiological, Revision 0.- 114. EPIP-23, Offsite Agency Emergency Call List, Revision 14.~ 1 1, 'After updating your mar.ual, please complete the attached receipt form and return to the Distribution Center, ~ Point Beach Nuclear Plant. j 1 fif you have any questions, please call the Distribution Center at Extension 6349, 6386, or 6433. 1 ~ ****** Special Distribution Notes *****
- +
NAMES AND NUMBERS TO BE DELETED MAKE SURE _WE's RETURN ADDRESS IS ON THE - RECEIPT AND A WINDOW ENVELOPE IS ENCLOSED. t/ 1I ' ' Distribution Center i PBNP G."A. Housterberg/K. M. '1hompson/D. M. Stuebs 1 o l .. Attachment f CONTROLLED q q l - 1 i il I .-,,-l- = ar , -, ~ = *. i. = e-i
s3 ~ ~ .) 3; f );. 4 f; s ..I . M arch 1,1995 l' i b y !r To:' - Distribution Center - PBNP 'I
- Manual:
EPIP. ~. Manual No.: 80 -- d 4 n , Issue Date: March 1,1995 The procedures listed below have been received by the undersigned and inserted into the Emergency Plan implementing Procedures Manual. ' l. EPIP Index, Revision 28. 2. . EPIP Form ladex, Revision 24 3. EPIP 1.1, Plant Operations Manager:. Initial Response, Revision 26. 4. EPIP 1.1.1, Plant Operations Manager Radiological Release Evaluation, Revision 15. EPIP 1.1.2, Plant Operations Manager, General Emergency - Protective Actions, Revision 9. 5.. EPIP 2.1, State and County Agency Notification, Revision 11. 6. . 7. EPIP 3.3, Notification and Response for Headquarters Support Personnel, Revision 16. 8. EPIP 4.1, Technical Support Center Activation, Revision 22i 9. EPIP 4.4, Alternate Emergency Operations Facility (AEOP) Activation, Revision 3. 10. EPIP 11.2, injured Person's immediate Care, Revision 9. 11. EPIP-12, Incident Report Form, Revision 7. 12. EPIP 13, Status Update - Plant, Revision 2. 13. EPIP-13a, Status Update - Radiological, Revision 0. 14. EPIP-23, Offsite Agency Emergency Call List, Revision 14.- Date PUBUC DOCUMENTS r ) ? ? . _,..- -}}