' ^ ~" 5--'
[h,
r q
COOPER NUCE *.R STATON
~
P.o, sox es, SRoWNVLG, NEBRASKA 88321
. Nebraska Public Power District
" N TA""
w C
.NLS950065-February 22, 1995
+
h' U. S.-Nuclear Regulatory Commission Attention: Document Control Desk Washington D. C. 20555-Subj ect:
Revision to the Response to Inspection Report.50-298/93-26
Reference:
NPPD Response to Inspection Report 50-298/93-26 (Reply to a Notice of Violation) dated January 28, 1994 Gentlemen:
The purpose of this letter is to revise one of the corrective actions delineated in-the above reference.
The reference contains the following action under " Corrective Steps Taken and' Results Achieved":
CNS Procedure 6.4.5.2.12, " Fire Door Annual Inspection,"'was revise'd to specifically identify-those doors which' form either the control room isolation, or the secondary containment, envelope.
By this l'etter, the above action is being clarified further to read as follows:
CNS Procedure 6.4.5.2'.12, " Fire Door Annual Inspection," has been revised to indicate those doors which are " Essential" and therefore form part of the control room isclation envelope or secondary containment.
The reason for revising the corrective action taken is to specifically identify the=
control room isolation and secondary containment envelope doors as " Essential" instead of providing a specific ~ reference to their function in CNS Procedure 6 ':.5.2.12.
The revised wording that presently exists in the procedure would prevent any failure to recognize these doors as " Essential" during maintenance activities.
1 This revision results in neither a reduction in commitment nor a change in scope and-
)
intent of the original corrective action presente?.ln the reference.
o f
O 0 00 r *x 9503060190 950222- -
[y 0
l
)
PDR ADOCK 05000298
- 1 0.
Q PDR i
Powerful Pride in Nebraska
~..=.c.
c:.
.. ~.. nc ~ -
.x..
_.u
- n....
. _n
,.__;~.,...
~.
+-
w
+4
-.,~ ~
pl %, 'y %ff %
ec y
- D
.e
~
YAM 1[u&yy,.; February;22,.1995<.
gir
?NLS9}0065...,
_. o s..
A1..
nw
- Page;2l ' -
- gy
.,.% r
.s w
'g' M.
a
- is If there
- are;any questions.regarding the information presented on these matters,-
m; g;, --please contact mec f.
$j.: ~, '
- l s
TJ hn H.;Mueller Site Manager-c/nr. 4 .cc: ' Regional Administrator USNRC - Region-IV Arlington, Texas ~ =NRC' Resident Inspector.0ffice Cooper Nuclear Station 4 f NPG Distribution. ' i 1 4 + ? 6 Y .E r 5 g 6 4 h a f L h ','[', f m ,..s A
r-a A LIST OF NRC COMMITMENTS l ATTACHMENT 3 ' Correspondence No: NLS950065 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments. COMMITTED DATE COMMITMENT OR OUTAGE None PROCEDURE NUMBER 0.42 l REVISION NUMBER 0 l PAGE 10 OF 16 l}}