ML20080M337

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 1.3 Re Estimation of Source Term,Epip 1.4 Re Radiological Dose Evaluation & EPIP 6.2 Re Plant Evacuation
ML20080M337
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/19/1983
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20080M321 List:
References
NUDOCS 8310030616
Download: ML20080M337 (1)


Text

_ _ _ _ . _ . _ . _ . _ _

1 Wisconsin Electnc rowca cournur 231 W. MICHIGAN, P.O. BOX 2046 MILWAUKEE, WI 53201 September 19, 1983 I

Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555' Attention: Mr. J. R. Miller, Chief Operating Reactors Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are two copies of revisions to the Point Beach -

Nuclear Plant Emergency Plan Implementing Procedures. These revisions consist of page changes which should be filed in your copies o,f.the procedures in accordance with the attached instructions.

Please return the receipt form for these two copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours,

./Y

. dtd ig Vice President-Nuclear Power C. W. Fay Attachments Copies to NRC Resident Inspector Incident Response Center, Region III f005 ,

D DO OOO 6 g F PDR