ML20080M248

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept 123 Re Fusion of Conductor Insulation, Rendering Insulation Values Indeterminate.Initially Reported on 830818.Deficiency Not Reportable Per 10CFR50.55(e)
ML20080M248
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/15/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, 123, Q-3-A35.0755E, W3183-031455E, W3183-31455E, NUDOCS 8310030540
Download: ML20080M248 (2)


Text

-

rp -

B

$ussOS$

I OUISI ANA POWER & L1GHT 242 anAnoNoe srncer P. O BOX 6008

\g SEp 2 3 BB3 0

~ ~ ~

Mr. John T. Collins . _ .

Regional Administrator, Region IV U. S. Nuclear Regulatory Commission L_

611 Ryan Plaza Drive, Suite 1003 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Potentially Reportable Deficiency No. 123

" Electrical Cable Insulation Values" Final Report

REFERENCE:

Telecon C. Hooper to W. Crossman dated August 18, 1983

Dear Mr. Collins:

On August 18, 1983 a problem with electrical cables installed at Waterford 3, was reported as Potentially Reportable Deficiency No 123. The condition was further described as fusion of the conductor insulation, rendering the insulation values indeterminate. This letter is to inform you that after further evaluation, this condition is not considered reportable pursuant to the requirements of 10CFR50.55(e).

EVALUATION Following site visits by Okonite on August 23, and Anaconda on August 26, 1983, samples of the questionable cables were returned to the vendors' facilities for evaluation. The results of these evaluations by both vendors indicate that the cables are normal in all respects and there is no evidence of conductor insulation to conductor insulation fusion. The subject cables are therefore acceptable for use at Waterford 3.

- 4 8310030540 830915 PDR ADOCK 05000382 1 O .2 7 '

S PDR 11 r

'It e '

Mr. John T. Collins September 15, 1983 W3I83-0314 Page 2 Based on these evaluations, Potentially Reportable Deficiency No. 123 is considered not reportable under.10CFR50.55(e).

Very tr ly yours, [

Wm F. J. Drummond -