Final Significant Const Deficiency Rept 60 Re Turnover Documentation & Inadequate Hanger Weld Problems T-B. Completion & Documentation Review Scheduled for 831214.Final Rept Will Be Submitted by 840116
ML20080M214
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/15/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
60, Q-3-Q35.07.60, W3I83-0310, W3I83-310, NUDOCS 8310030507
Download: ML20080M214 (1)


Text

--

Lo u isi Ama

,42 oEm,0No, s1e<<1 POWER & LIGHT P O BOX 6008

  • NEW ORLEANS. LOUISlANA 70174. (5041 366-2345 MIDDLE SOUTH UTIUTIES SYSTEM September 15, 1983 h

]hd

.60 v

SEP 2 31983 h-

\\

k, l_r)

Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 60

" Turnover Documentation and Inadequate Hanger Weld Problems T-B" Fifth Interim Report

REFERENCE:

LP&L Letter W3183-0236 dated July 15, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC on September 16, 1983.

At the present time, corrective action is ongoing and the supporting documentation review is in progress. Completion of the corrective action and the documentation review is scheduld for December 14, 1983.

A Final Report will be submitted on January 16, 1984.

Very truly yours, e *'

F. J. Drummond Nuclear Services Manager cc:

1)

Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 2)

Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8310030507 830915

-c PDR ADOCK 05000382