ML20080K628

From kanterella
Jump to navigation Jump to search
Forwards Procedures 80A0467,Rev 5,80A0471,Rev 1,80A0472,Rev 2,80A0475,Rev 7,80A0476,Rev 1,80A0479,Rev 1,80A0481,Rev 8 & 80A2950,Rev 1 to Preservice Insp Program.Documents Furnished to Comply W/Util Response 1 to NRC Request 121.16
ML20080K628
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 09/15/1983
From: James Smith
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20080K631 List:
References
SNRC-968, NUDOCS 8309290296
Download: ML20080K628 (2)


Text

i LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLEAR POWER STATION am I' - = cr - --

P.O. BOX 618. NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 m

D' nt Dial Number e

September 15, 1983 SNRC-968 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation Light Water Reactors, Branch 4 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Dear Mr. Denton:

Enclosed, please find ten (10) copies each of the following revisions to the Preservice Inspection Program.

80A0467 Rev. 5 80A0476 Rev. 1 80A0471 Rev. 1 80A0479 Rev. 1 80A0472 Rev. 2 80A0481 Rev. 8 80A0475 Rev. 7 80A2950 Rev. 1 These documents are furnished to comply with LILCO's response No. 1 to NRC request 121.16.

Please acknowledge receipt of the documents by signing and returning the enclosed docu-ment transmittal control form.

Very truly yours,

  • J

,p?

(

J.

L.

Smith Manager Special Projects JAB:mc Enclosures cc:

C. Petrone, NRC Site "All Parties" Listed in Attachment 1 j

%cn,,J t

8309290296 830915 PDR ADOCK 05000322 PDR g

FC-8935.1

r j

September 16, 1983 Mr. Harold R..Denton, Director (011)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Preservice Inspection Program Plan Transmittal Shoreham Nuclear Power Station - Unit 1 W. O. 44430/48923 As holder of a controlled copy of the PSI Program Plan Manual, you will receive all revisions to the Manual as they are issued.

At-tached you will find instructions for inserting the enclosed docu-l ments in the PSI Program Plan Manual.

The instructions will also serve as a checklist to assure that you have received all the re-quired material.

ENCLOSURE (S) :

80A0467 Rev. 5 80A0476 Rev. 1 80A0471 1

80A0479 1

80A0472 2

80A0481 8

80A0475 7

80A2950 1

Please acknowledge receipt of these documents by signing and dating this transmittal in the space provided below.

Return the completed transmittal form to:

D. R. Haeffner, Staff Assistant Long Island Lighting Company Shoreham Nuclear Power Station P.O. Box 618, North Country Road Wading River, New Yerk 11792 Attachment & Enclosure cc:

Eng. File /SR2...SHI-397 Signed Date L