Confirms Telcon W/Region III Clarifying Spec Change Notice 13003 Involved W/Remedial Soils Work Authorization & Allowing Access to Train a Pipe Excavation Area for Drilling of Soldier Piles & Dewatering Wells
ML20080K485
Person / Time
Site: Midland
Issue date: 09/21/1983
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6895, NUDOCS 8309290176
Download: ML20080K485 (1)


Text

_

V

)N I

s' O~ CORSumBIS power u--

"^*""

Company

"'".rn"d i+oject Office Asidl General Offices: 9945 West Parnell Road, Jackson, MI 49201 + (517) 788-0774 7 :':;ir?t. y :+ ll

.l']M -..I V

h U ---

September 21, 1983 A.a YW

~

t k,

~~

i:

Mr J J Harrison Midland Project Section y.L 1

I U S Nuclear Regulatory Cormission A.

l (F ; LL 4 s Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CESTER GhD 7020 t

1 RBIEDIAL SOILS ADRK AlmIORIZATION File:

0485.16 UFI: 42*05*22*04 Serial: CSC-6895 l

12*32 This letter is to confirm two telephone conversations between Mr. Kheeler and Mr. Murray of our office and Dr. Ross Landsman of NRC Region III.

The following agreements were reached during these conversations:

1.

A clarification of the specification change notice 13003 was made.

The change involved increasing the allowable deviation of the repeatability of the hydraulic load cell calibration from 2% to 5%.

l 2.

It was agreed that the Train A pipe excavation may be temporarily backfilled with lean flyash concrete. This is to allow access to I

the area for drilling of soldier piles and dewaterings wells. All the temporary lean flyash will be removed at some later date.

If you have any questions, please contact this office.