ML20080K009
| ML20080K009 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 02/09/1984 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, John Miller Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20080K012 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.F.1, TASK-TM 662A, GL-83-37, NUDOCS 8402150267 | |
| Download: ML20080K009 (2) | |
Text
.
VIRGINIA ELECTRIC AND PowEn COMPANY RIcunoNn,VIHOINIA 202G1 l
W. L. STEWAT?T Vaca Pomarnswr February 9, 1984 wucoma o,. 4uo..
Me. Harold R. Denton, Director Serial No. 662A Office of Nuclear Reactor Regulation N0/JDH: jab Attn: Mr. James R. Miller, Chief Docket Nos. 50-338 Operating Reactors Branch No. 3 50-339 Division of Licensing License Nos. NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C.
20555 Gentlemen:
~ AMENDMENT TO OPERATING LICENSES NPF-4 AND NPF-7 a0RTH ANNA POWER STATION UNIT NOS. 1 AND 2 S_UPPI EMEET TO PROPOSED TE':HNICAL SPECIFICATION CHANGE In our letter dated.!anc 3, 1983 (Seria) No. 333), the Virginia Electric and Power Compan'; requested an amendment, in the form of changes to the Technical Specifications, to Operating Licenses NPF-4 and NPF-7 for the North Anna Power Station, Unit Nos. I and 2.
The proposed changes pertained to NUREG-0737 item II.F.1, except item II.F.1.2.
A supplement to the proposed changes to include NUREG-0737 items II.F.1.2 and II.B.3 is enclosed.
The proposed change. adds a description of the post-accident sampling program to Section 6, Administrative Controls, in fulfillment of the requirements of NUREG-0737 item _II.F.1.2, Sampling and Analysis of Plant Ef fit.ents, and iteta II.B.3, Post-Accident Sampling.
The proposed specifications are consistent with the guidance provided in NRC Generic Letter 83-37 and fulfill cur commitment in our December 9, 1983 (Serial No. 662) letter.
The proposed Technical Specification change is provided in AttacFment I with a discussion of the proposed change in Attachment 2.
This request has been reviewed and apprcved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.
>t has been determined that this request does not pose an unreviewed safety question as
' defined in 10CFR50.59 nor a significant hazards consideration as defined in 10CFR50.92.
Very truly yours, 8402150267 840209 J
[.
Q,/
-PDR ADOCK 05000338 P
PDR Lh W. L. Stewart Attachments:
l g
1.
Proposed Technical Specification Change 2.
Discussion'of Proposed Chan n
a Vauorm C2.scraic Awn Powsm COMPANY TO Mr. Harold R. Denton cc:
Mr. James P. O'Reilly Regional Administrator Region II Mr. M. W. Branch NRC Resident Inspector North Anna Power Station Mr. Charles Price Department of Health 109 Covernor Street kichmond, Virginia 23219 t:
1 l
_ _ _ _ _ _ _.. _ _ _ _..