ML20080J922

From kanterella
Jump to navigation Jump to search
Interim Deficiency Repts Re Unverified Computer Code for Main Feedwater Pipe Supports.Issue Expected to Be Resolved & Final Rept Submitted by 840309
ML20080J922
Person / Time
Site: Vogtle  
Issue date: 02/07/1984
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-310, GN-314, NUDOCS 8402150241
Download: ML20080J922 (2)


Text

-.

Georga Power corrcny 333 P cdmont Avenue At'anta. Gaorya 30308 Telenhone 404 526-7726 Ma&ng Address l

Post Office Box 45C Atlanta, Georg'a 30301 h

84 FEB13 A 9: 32 Georgia Power D. O. Foster t% sournern eet system bce President and Genera! Manager Vogtie Pto;ect February 7, 1984 United States Nuclear Regulatory Commission File:

X7BG03-M34 Office of Inspection and Enforcement Log:

GN-314 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Reference:

Vogtle Electric Generating Plant - Units 1 and 2, 50-424, 50-425; Main Feedwater Pipe Supports - Unverified Computer Code, GN-242 dated July 14, 1983 Attention: Mr. James P. O'Reilly Gentlemen:

In our previous correspondence on this issue, Georgia Power Company indicated that the final report could be expected by February 3, 1984.

The previous letter also indicated that new input data for the computer program could be expected from Anchor Darling Valve Co. in 12 to 16 weeks.

In reality, it took over 20 weeks to obtain the input data. There-fore, Georgia Power Company now expects this issue to be resolved on or before March 9, 1984.

This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

Your jtruly,

/

/-

/

UV a

D. O. Foster D0F:js 8402150241 840207 gDRADOCK 05000424 PDR OWICIALCDPY d/26

~

i I O

Georgia Power Company 333 Piedmont Avenue Atlanta, Georg:a 30308 Telephone 404 526 7726 MaSng Address:

Post Of fice Box 4545 Attanta. Georg a 30302.

84 FEB13 A 9: 32 Georgia Power D. O. Foster the souttern electic sys'em Vice President and General Manager.

Vogtle Propct February 7, 1984 United States Nuclear Regulatory Commission File: X78G03 - M34 Office of. Inspection'and Enfoi cement Log:

GN-310 Region II-Suite 3100-

.101 Marietta Street Atlanta, Georgia 30303

Reference:

Vogtle Electric Generating Plant - Units 1 and 2, 50-424, 50-425; Unverified Computer Code-Main Feedwater Pipe Supports, GN-242 dated July 14, 1983

' Attention: Mr. James P. O'Reilly Gentlemen:

In our previous correspondence on this issue, Georgia Power Company indicated that the final report could be expected by February 3,1984.

The previous letter also indicated that new input data for the computer program could be expected from Anchor Darling Valve Company in 12' to 16 weeks.- In reality, it took over 20 weeks to obtain the input data.

'Therefore, Georgia Power Company now expects this issue to be resolved on or. before March 9,1984.

This response contains no proprietary information and may be placed i

in the NRC Public Document Room upon receipt.

Your tr 1,

7 dster D0F/REF/cc xc:

U. S. Regulatory Commission Document Control Desk Washington, D. C.

20555 R. J. Kelly R. H. Pinson E. D. Groover R. E. Conway B. M. Guthrie L. T. Gucwa G. F. Head R.'A. Thomas M. Malcom

.J. T. Beckham, Jr.

.J. A. Bailey G. Bockhold, Jr.

D. N. MacLemore

0. Batum P. D. Rice D. E. Dutton H. H. Gregory, III J. L. Vota W. F. Sanders C. W. Hayes OFFICIAL COPY

,