Responds to NRC Re Violations Noted in IE Insp Repts 50-498/83-11 & 50-499/83-11.Corrective Actions: Cosmetic Repairs Made to Concrete Surface W/Exceptions of One Structural Surface
ML20080J129
Person / Time
Site: South Texas  
Issue date: 08/24/1983
From: Oprea G
HOUSTON LIGHTING & POWER CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20080J107 List:
References
ST-HL-AE-998, NUDOCS 8309260203
Download: ML20080J129 (3)


Text

.

The Light comPuy ii""s,"" i ix 'i"x & i

<< i o. ii"x iroo ii""s"~. rex >s 77""i <7'a> 22 -92 > i n

August 24, 1983 ST-HL-AE-998 File Number: G2.4/C10.1.1 N[g@[N!]\\V/[g 3 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission s

I 611 Ryan Plaza Drive, Suite 1000 AUG 2 91983 Arlington, Texas 76012 d

Dear Mr. Collins:

South Texas Project Units 1 & 2 Decket Nos. STN 50-498, STN 50-499 Response to Notice of Violation Pursuant to the provisions of 10CFR2.201 enclosed is Houston Lighting &

Power Company's response to the Notice of Violation 50-498/83-11-01 dated July 25, 1983.

If you should have any questions regarding this matter, please contact Mr. Michael E. Powell at (713) 877-3281.

Very truly yours, G. W. Oprea, Jr.

Executive Vice President LJK/mg Attachment

} h' 6 '

/

8309260203 030919 PDR ADOCK 05000490 G

PDR

llouston Lighting & Power Company August 24, 1983 cc:

G. W. Oprea, Jr.

ST-HL-AE-998 J. H. Goldberg File Number: G2.4/

J. G. Dewease C10.1.1 J. D. Parsons Page 2 D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A.

lalker S. M. Dew J. T. Collins (NRC)

A. Vietti (NRC)

W. M. Hill, Jr.

(NRC)

M. D. Schwarz (Baker & Botts)

R. Gordon Gooch (Baker &Botts)

J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)

STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.

20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg fir. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 Un1versity of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.

P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.

20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.

Citizens Concerned About Nuclear Power c/o its. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Robert G. Perlis, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Revision Date 07-05-83

=

Attachment ST-HL-AE-998 flouston Lighting & Power Company Page 1 of 1 South Texas Project Units 1 & 2 Response to Notice of Violation I.

STATEMENT OF APPARENT VIOLATION Criterion V to Appendix B of 10 CFP, Part 50, states, " Activities affecting quality shall be prescribed by documerited instruction, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures or drawings."

Contrary to the above, Specification for Concrete Construction 2A010CS0028 and Construction Procedure CSP-4 Concrete Placement do not adequately address the placing of concrete on a sloping surface or the free-form method. On June 3, 1983, Concrete Placement 1-RC-W-210-013/CSI-R10 was placed by the free-form method and the craft (finishers, vibrators) involved had insufficient experience and no apparent ' instruction prior to this placement and type method used.

II.

CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE~RESULTS ACHIEVED 1)

Nonconformance report (NCR) #CC-00565 was generated in accordance with Ebasco's Quality Program to ensure proper engineering evaluation of the' subject placement.

Engineering evaluation resulted in cosmetic repairs to the concrete surface with the exception of one (1) structural repair. All the repair work has

-been completed.

2)

Specification 2AQ10CS0028 Rev. I has been reviewed and it was determined that the specification adequately addressed the placing and finishing of concrete on a sloping surface.

3)

Construction procedure CSP-4, Concrete Placement, Rev.1, was clarified by issuing an interim change prior to the next placement

(#1-RC-W-214-015/1-RC-W-218-017) on the Unit 1 dome. Clarification to CSP-4 included provisions for a documented coordination meeting prior to placing free-formed concrete with appropriate personnel from Quality Control, Engineering and Construction.

The placement on June 30, 1983 was successfully completed.

III. CORRECTIVE STEPS THAT WILL BE TAKEN TO AVOID FURTHER VIOLATIONS The Unit 1 dome was satisfactorily completed using the aforementioned methods.

Future free-form placements on steeply inclined surfaces will be performed in accordance with approved procedures that provide appropriate controls.

IV. THE DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED All appropriate concrete placement controls for free-form work were established and implemented by June 30, 1983.