ML20080J050
| ML20080J050 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/20/1983 |
| From: | Harrington W BOSTON EDISON CO. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| 83-241, NUDOCS 8309260136 | |
| Download: ML20080J050 (1) | |
Text
BOSTON EDiBON COMPANY B00 BOYLSTON STREET BOSTON, MASSACHUSETTS O2199 WILLIAM D. HARRIN GTON asween vaca rasesosw?
wuotaan September 20, 1983 BECo 83-241 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 License No. DPR-35 Docket No. 50-293
Subject:
Update to Single Loop Request
References:
(A) Boston Edison letter of May 12, 1981:
Revised Request for Tech-nical Specification Changes Concerning Single Loop Operation (B) Boston Edison letter of May 31, 1983:
Proposed Change to Tech-nical Specification
Dear Sir:
In our May 31, 1983 (Reference B) letter, we proposed a change to extend the Load Line Limit for Pilgrim I.
At that time we believed that this change would affect our previous request for Single Loop Operation (Reference A), and committed to supply any such effects in an update to the Single Loop request at the conclusion of a review.
Boston Edison has completed its review and has concluded that the Single Loop settings for APRM Flux Scram and APRM Rod Block are independent of the proposed new settings for two loop operation.
Therefore, no revision to the single loop proposal (Reference A) is needed.
We believe this closes our commitment from Reference B.
Should you wish further information on this issue, please contact us.
Very truly yours, PMK/ mat 1
1 0 8309260136 830920 DR ADOCK 05000
_