ML20080J049

From kanterella
Jump to navigation Jump to search
Significant Const Deficiency Rept 42-R1 Re Hma Auxiliary Relays.Initially Reported on 831213.Electrical Outage Scheduled in Feb 1984 to Complete Corrective Actions.Next Rept Will Be Submitted on 840224
ML20080J049
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
42-R1, W3K84-0209, W3K84-209, NUDOCS 8402140431
Download: ML20080J049 (2)


Text

.

LDUISIANA 24a octanoNoe S1nter P O W E R & L I G H T7 P O BOX 6008 . NEW ORLEANS. *LOUISIANA (504) 366-2345 70174 UTruTIES SYSTEM January 31, 1984 W3K84- 0209 Q-3-A35.07.42R1

$@$UN$

Mr. Tohn T. Collins Regional Administrator, Region IV FEB - 6 1984 U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 -

y Arlington, Texas 76012

REFERENCE:

LP&L letter W3K83-1957 dated December 13, 1983

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Dacket No. 50-382 Significant Construction Deficiency No. 42-R1 "HMA Auxiliary Relays" Interim Report The above referenced letter indicated submittal of the Final Report to the USNRC on January 31, 1984.

At the present time, a plant electrical outage is scheduled to complete the final corrective action in early February 1984.

The Final Report will be submitted to the USNRC on February 24, 1984 Very truly yours, WW &

T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l

0 h PDR IE.27 l fo

km : '7l Mr. John T. Collins

-January 31, 1984-W3K84-0209 Page 2 cc:- Director-Office of Management Information and Program Control 1U. S. Nuclear Regulatory Commission Washington, D.C.- 20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.