Forwards Bechtel Ltr to Util Re Completion of Work Noted as Deficiency in Diesel Generator Bldg Notice of Violation. Installation Dates Derived from Various Unofficial But Reliable Documents.Certificate of Svc Encl
ML20080F792
Person / Time
Site: Midland
Issue date: 09/14/1983
From: Williams F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), ISHAM, LINCOLN & BEALE
To:
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8309190399
Download: ML20080F792 (7)


Text

r o

e ISHAM, LINCOLN & BEALE 00CKETED COUNSELORS AT LAW '3 q C rosina$1NAroNAoua CHICAGO. 6LUNots 606o2 83 SEP 16 P'2:06 3

DWARD $ ISHAM. 1872 1902 E W WASHINGTON OFFICE W Ge i N OF!C2 OF SEC!?E! N "" h$a CCCKHit10 & 5Emr' *^$HiwarON.o.C.2aoas September 14, 1983 gaANcq 202:3nm UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

) Docket Nos. 50-329-OM CONSUMERS POWER COMPANY ) 50-330-OM

) 50-329-OL (Midland Plant, Units 1 ) 50-330-OL and 2) )

De r Administrative Judges:

Pursuant to the request by Judge Harbour during the course of the hearings on June 29, 1983 (Tr. 18648-49), I am enclosing correspondence to Consumers Power Company from Bechtel Power Corporation which furnishes information relating to the dates of completion of work noted as a deficiency in a particular paragraph of the Diesel Generator Building inspection Notice of Violation which was the subject of the questioning during that session of the hearings. As the cover letter indicates, Mr. John Milandin of Bechtel Power Corporation, Assistant Project Manager, has had responsibility for developing the tabulation and the documentation therefor.

As the cover letter also indicates, the tabulation only covers items installed and inspected by Bechtel. The remaining items not covered by the tabulation were maintenance and storage items, vendor supplied items, engineering related items, and process-type items which did not fall into the installation and inspection category. The exclusion of these non-Bechtel items is in accordance with our understanding of the scope of Judge Harbour's request (Tr. 18649).

Since receiving a copy of this correspondence in August, I have had several conversations with Mr. Milandin concerning the manner in which the information contained in the tCaulation was developed and concerning the reliability of that information. The tabulation contained as the attachment 8309190399 030914 PDR ADOCK 05000329 PDR O

Administrative Judges September 14, 1983 Page Two to the enclosure contains information on both installation and on inspection. Mr. Milandin informs me that the installation dates were derived from various documents, some of which have no official status, but which are deemed to be reliable for evidentiary and other purposes. These. installation dates were derived from material withdrawal receipts, pour records for concrete slab installation, field engineering reports and notebooks, and other similar documents. The installation dates'used for the tabulation in the attachment were estimated from the information contained in those records and thus are subject to minor uncertainties. The records upon which these dates are based could be made available, if necessary, '7 support the tabulation. With respect to the inspection tabulation, however, the inspection dates are certain because they are taken from official inspection records. Thus there is no estimation involved in the latter part of the tabulation. Mr. Milandin informs me that he has reviewed the material supporting the tabulation several times and personally vouches for its accuracy and reliability.

Yours truly, .

(*

Frederick C. Williams One of the Attorneys for Consumers Power Company FCW/syf Enclosure l

l l

_____a

Bechtel Power Corporation 777 East Eisenhower Parkway Ann Arbor, Micnigan -

Med Ageress. P.O. Box 1000. Ann Arbor, Michigan 48106 s

BLC- 17457 Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 Attention: Mr. J.W. Cook Vice President Projects, Engineering and Construction

Subject:

Midland Plant Units 1 and.2 Consumers Power Company Bechtel Job 7220 ASLB QUALITY ASSURANCE HEARINGS; DIESEL GENERATOR BUILDING EQUIPMENT INSTALLATION AND INSPECTION DATES

Reference:

NRC Region III letter to Consumers Power Company dated 2/8/83 i' This letter is in response to a request from Judge Harbour during the subject hearings (transcript pages 18648-1fs649) and forwards the attached draft tabulation of fourteen of the thirty-two diesel generator inspection items reported in the referenced letter, with assignable installation and inspection dates. These are items that were installed and inspected by Bechtel. The remaining eighteen of the thirty-two items were maintenance and storage items, vendor supplied items, engineering related items, and process-type items and were not included in the in'stallation and inspection categories.

John Milandin has researched the documentation associated with each of the items and has on file a folder for each item, with the appropriate backup documentation used to establish the installation and inspection date. It is expected that you will forward this information to the ASLB' and.all other interested parties through the appropriate channels.

Very y yours, f

f. "

John A. Rutger Project Mana r JAR /JM/dr 071801 4

- - - - - - , , . . _ , - _ . _ , . . _ - . _ , , - . , , - _-_m,, -. .,_-,_.__,m

  • Attcchmnt to BLC- 17457 122473 TABLUATION OF INSTALLATION AND IESPECTION DATES FOR Drum. GENERATOR BUILDIBC EQUIPMENT The itees are tabluated by time period when the installation and inspection occured.

Tha numeral and letter refer to the last two numeric / alpha characters in the referenced lotter's " notice of violation" paragraphs. Where an item falls in two or more time periods, the later time is counted. The item is shown in parenthesis when it occurs in the earlier time period.

ACTIVITY TIME PERIOD lst Half 2nd Half 1st Half 2nd Half Not Yet 79 80' 80 81 81 82 Inspected i

Iestallation ih Id la lc Ib 1p 11 Ig (1b) 4a ,

1m (Ic) in (4a) lo 2b 2c TarALS: 7 1 7 7 7 Ix pection (1g) Ig 1h 11 lb la (lb) in le lp j

in ld 2b l

lo 2e 4a TOTALS: 1 1 4 3 7 l

4 Bechtel Power Corporation i22473 Bte 17457 -

Pa 2 Ju 20, 1983

Attachment:

Tabulation of Installation and Inspection Dates for the Diesel Generator Building Equipment cc: (All w/a)

E.L. Blake (Shaw, Pittman, Potts wbridge)

D.B. Miller i

l l

l l

l s

l l

Written Response Requested: No

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In'the Matter of )

) Docket Nos. 50-329-OM CONSUMERS POWER COMPANY ) 50-330-OM

) 50-329-OL (Midland Plant, Units 1 and 2 ) 50-330-OL CERTIFICATE OF SERVICE I, Frederick C. Williams, one of the attorneys for Consumers Power Company, hereby certify that a copy of the

. attached Letter to Administrative Judges of September 14, 1983 was served upon all persons shown in the attached service list by deposit in the United States mail, first class, this 14th day of September, 1983. Persons identified with an asterisk were served by hand delivery. Persons identified with a double asterisk were served by Express Mail, fa Frederick C. Williams l

l i

1 l

l l

,' SERVICE LIST Frank J. Kelley, Esq. Steve Gadler, Esq.

Attorney General-of the 2120 Carter Avenue State of Michigan St. Paul,. Minnesota 55108 Carole Steinberg, Esq.

Assistant Attorney General Atomic Safety & Licensing Environmental Protection'Div. Appeal Panel 720 Law Building U.S. Nuclear Regulatory Comm.

Lansing, Michigan 48913 Washington,.D. C. 20555 Myron M. Cherry, Esq. Mr. Scott W. Stucky Cherry & Flynn Chief, Docketing & Services 4

Suite 3700 U.S. Nuclear Regulatory Comm.

Three First National Plaza Office of the Secretary Chicago, Illinois 60602 Washington, D. C. 20555 Mr. Wendell H. Marshall Ms. Mary Sinclair 4625 S. Saginaw Road 5711 Scmmerset Street Midland, Michigan 48640 Midland, Michigan 48640

  • Charles Bechhoefer, Esq.
  • William D. Paton, Esq.

Atomic Safety & Licensing Counsel for the NRC Staff Board Panel U.S. Nuclear Regulatory Comm.

U.S. Nuclear Regulatory Comm. Washington, D. C. 20555 Washington, D. C. 20555 Atomic Safety & Licensing

    • Dr. Frederick P. Cowan Board Panel 6152 N. Verde Trail U.S. Nuclear Regulatory Ccmm.

Apt. B-125 Washington, D. C. 20555 Boca Raton, Florida 33433 Ms. Barbara Scamiris Mr. D. F. Judd 5795 North River Road Babcock & Wilcox Route 3 P.-O.' Box 1260 Freeland, Michigan 48623 Lynchburg, Virginia -24505

  • Dr. Jerry Harbour James E. Brunner, Esq. Atomic Safety & Licensing Consumers Power Company Board Panel 212 West Michi U.S. Nuclear Regulatory Comm.

Jackson, Michi~gan gan Avenue 49201 Washington, D. C. 20555 i

l *Lynne Bernabei Michael I. Miller, Esq.

Thomas Devine Philip P. Steptoe, Esq.

Louis Clark Isham, Lincoln & Beale

(-

Government Accountability Project Three First National Plaza of the Institute for Policy StixEes. Chicago, Illinois 60602

' 1901 Q Street, N.W. ,

Washington, D. C. 20009 l

[

i ~

i