Submits Revised Response to IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Sustained full-load Tests for Generators Will Be Completed in Sept 1986 for Unit 1 & Sept 1988 for Unit 2
ML20080C942
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/28/1983
From: Oprea G
HOUSTON LIGHTING & POWER CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-SSINS-6820 IEB-79-23, ST-HL-AE-982, NUDOCS 8308290395
Download: ML20080C942 (3)


Text

'

The Light Company ii....si.,,, u i,ii,,m,,-, m n.,mm ii.,,,si,,,. ws,,ou m m.mii x

July 28, 1983 h

5h 3

s

(

  1. JG i 1983 Mr. John T. Collins L

d Regional Administrator, Region IV y

Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102

Dear Mr. Collins:

South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Revised Response to IE Bulletin No. 79-23 By letter dated October 22, 1979, Houston Lighting & Power Company (HL&P) provided a response to NRC IE Bulletin No. 79-23, " Potential Failure of Emergency Diesel Generator Field Exciter Transformer."

Item 2 of the Bulletin requested that HL&P provide a schedule for the completion of a sustained full-load operation test of the emergency diesel generators. The response indicated that the estimated latest dates for completion of the tests were September 1983 for Unit 1, and September 1985 for Unit 2.

However, the schedule for completion of the tests has been changed to reflect the revised completicn date for the Project. As currently planned, sustained full-load operation tests of the STP emergency diesel generators will be completed in September 1986 for Unit 1, and September 1988 for Unit 2 If there are any questions, please contact Mr. Michael E. Powell at (713) 877-3281.

Very truly yours,

,/

rea

'YExecitive'Vice President PLW/na fl 8308290395 830728 g(

gDRADOCK05000

Ilomion I.ighting & l'ower Cornpany cc:

G. W. Oprea, Jr.

ST-HL-AE-982 J. H. Goldberg File No: G3.3 J. G. Dewease Page 2 J. D. Parsons D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins (NRC A. Vietti (NRC W. M. Hill, Jr.

(NRC M. D. Schwarz (Baker &Botts)

R. Gordon Gooch (Baker &Botts)

J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)

STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission i

Corpus Christi, Texas 78403 Washington, D. C.

20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.

P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.

20006 Austin, Texas 78711 i

Lanny Sinkin Citizens for Equitable Utilities, Inc.

Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Robert G. Perlis, Esquire Hearing Attorney l

Office of the Executive Legal Director l

U. S. Nuclear Regulatory Commission l

Washington, D. C.

20555 Revision Date 07-05-83

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter S

S Houston Lighting & Power s

Docket Nos. 50-498 Company, et al.,

5 50-499 s

South Texas Project 6

Units 1 and 2 5

AFFIDAVIT G. W. Oprea, Jr., being duly sworn, hereby deposes and says that he is an Executive Vice President of Houston Lighting & Power Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Revised Response to NRC IE Bulletin 79-23; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge and belief.

,7 3

\\c/zo d h /

' jG. W.,Wp re'a, J rf Exedutive Vice President STATE OF TEXAS 6

5 COUNTY OF HARRIS S Subscribed and sworn to before me, a Notary Public in and for Harris County, Texas this 28th day of July

,1983.

Ob O T/[

Sande Goodspeed Notary Public in andVfor the State of Texas My coninission expires:

3/24/84 k