Confirms 830815 & 16 Telcons Re Remedial Soils Work Authorization.Four Wells Will Be Added to Svc Water Pump Structure Dewatering Sys.Design for Pipe Hangers Revised
ML20080C789
Person / Time
Site: Midland
Issue date: 08/17/1983
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6855, NUDOCS 8308290322
Download: ML20080C789 (1)


Text

_ _

4 i

CORSumBIS Power

~

lbrecative Afanager Midland ivoject office l PRit;CIPAL STAFF General Of fices: 1946 West Parnell flood, Jackson, MI 49201 + (517) 788 0774 gg j 74 [yp _ '~

OfRA' M

A/RA

+0

[PRP 3_LO August 17, 1983 ikea e:E

.5(),3gq unse bE 33%

F_il Mr J J l'arrison OL FILLhd 7 Midland Project Section U S Nucicar Regulatory Conn 11ssion Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUI1DRIZATION File: 0485.16 UFI:

42*05*22*04 Serial: CSC-6855 70*01

'Ihc following items were discussed in 8/15/83 and 8/16/83 telecons between Dr. Ross Landsman of NRC Region III and R. Wheeler, R. Wieland, and D. Pulm 11a of CPCo.

1.

Four (4) additional wc11s will be added to the Service Water lhp Structure Dewatering System (Reference Activity Nanber 207050605).

2.

The design for pipe hangers on lines 30" OlIBC 34, 20, and 16 in the Service Water Punp Structt~e has been revised (Refer-ence Activity Nunber 202550164).

3.

An FCR will be written to allow the installation of level C wales in the Auxiliary Building Access Shafts to proceed prior to ccopletion of Zones Z-2 and Y-2 excavations.

Dr. Landsman concurred that these three items constitute minor changes to the previously approved activities.

iOO%

JAM /RilW/klm

~LEDI 8308290322 830817 PDR ADOCK 05000329 A

PDR 22 g O

.-