Forwards Payment of Civil Penalty Imposed as Result of Bolting Problems Identified in Enforcement Action 82-136. Commitment to Const & Operation Quality Reaffirmed
ML20080C119
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/27/1983
From: Reed C
COMMONWEALTH EDISON CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
7043N, EA-82-136, NUDOCS 8308190136
Download: ML20080C119 (2)


Text

-

bCS Commonwsaith Edison

{/.

One Drst National Plaza. Chicago. Ilhnois

\\

Address Reply to: Post Office Box 767 Chicago lilinois 60690 July 27, 1983 FIIa copy s

Mr. Richard DeYoung, Director Of fice of Inspection and Enforcement-U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Braidwood Generating Station Units 1 & 2 Proposed Civil Penalty NRC Docket Nos. 50-456 and 50-457 Reference (a):

June 27, 1983, letter from R. C.

DeYoung to J.

J. O'Connor.

Dear Mr. DeYoung:

This letter constitutes Commonwealth Edison's response to the " Order I nposing Civil Monetary Penaltics" dated June 27, 1983, served by yoJr letter of June 27, 198h Enclosed is our check for

$100,000 in l'all payment of the civil penalty imposed against Braidwood Station.

Although we are not convinced that the significance of the bolting problems at Byron and Braidwood rises to the magnitude of the fine levied, we nevertheless believe it is in the interest of -

all to remit the full per:alty.

Edison's commitment to quality in the construction and operation of Braidwood Station remalns firm and complete; any continued controversy in this matter at this time'will only detract from the overall perception of this commitment.

Very truly yours, Cee

\\

Cordell Reed Vice-President Im cc:

J. G. Keppler N000 IlI G308190136 830727 PDR ADOCK 05000456 Ia i

i L

0 Plm fCC(4 WlO Ch%K 7043N s

e

1 Stoc k Form i t 14 i

Octooer 196'

7. tie 'i m io6 BILL FOR COLLECTION G AO sfanual Bill No.

1 U.S. l'uclear Regulatory Codmission Date duly 29, 1983 i Department or Estabbshment and Bureau or Officej Washinqton, DC 20553

  1. Address:

P.4 TER:

Commonwealth Edison Company P.O. Box 7C7 This butt should be returned by the Chicago, IL COGSG pv<r =<4 4,s r,mtrianu.

l SEE INSTRilCTIONS BELO U'.

l l

Date DESCRIPTION Quantity Amount Unic Price Cost Per 7/29/03 Full payment for CP imposed for EA 32-136,

Docket i;os. 50-456 and 30-437, dated June 27, 1983 5100,000.00 I

}

I I

l i

i l

l

.lalOU.\\T DUE T///S n/LL.

5100,000.00 This is not <u receipt INSTilUC1'loNS l' ender..: p.n ment ol the alkn e hill m n he nt.ule m t ash. l'nurel States pental numrv ortirr. espress monev ortler, bank dratt. or check, to ihi othe r imhi. ural

,m h tember. a ben m ans other hirm than. ash, shoulti he ifraw n to the oreter ol' the Departrnent or Estabiishment n< t Ib u r,m..i t )t he r nuun atro ahos e It r. ripis will be nsurel in.11..ncs w herr < ash n t ra rn ret.uul unis u pon i rq uest w hrn renuttant e n m ans other form. If tender of p.n mr n e of i hn inll n..e hrr t ha n..n h os f nit ril we.u rs postal mones or.lcr. t hr tra ript shall not bri ome an acquittance until such ernelrr h.n twen. Irair.1 amt t he a mment t ri rn rel in ihr ()cpar teurvit or l'stahinhment and ibu rau or t)lha r imhcated above.

I'.uiur e i.. s e e e n e a i e.. ipt toe a..n h p.n men t s hool.1 he ps iunpel s r e p.o iril bs the pasrt to the. hirf atteusnistrative officer of the bu: rau..e aci n s me tu t.un.1 aliin c

  • 4n s unn s t epistisi; o+, tcs : n4 o. m.an

_