ML20080B218

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-2-120 Re Natural emergencies,EP-2-140 Re Reentry & EP-2-150 Re Emergency Records.W/O Encl
ML20080B218
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/01/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20080B217 List:
References
W3F83-0254, W3F83-254, NUDOCS 8308040697
Download: ML20080B218 (2)


Text

___

LoulSIANA P O W E R & L I G H T! P o sox 6008

  • NEW OnLEANS LOutSIANA 70174 242 cetAnaNoe srneer
  • [504) 366-2345 Nu90sEU

}

June 1, 1983

.,' ' s !

-lt',W3F83-0254

' ~ '

JUV - 3 93)

Mr. John T. Collins Regional Administrator

~

US NRC Region IV f

611 Ryan Plaza Drive - Suite 1000' ~~~

"~

Arlington, TX 76011 SUBJ ECT:

Waterford 3 SES Emergency Plan Implementing Documents Dear Mr. Collins In accordance with 10 CFR 50.47, transmitted herewith are two copies of the Waterford 3 Steam Electric Station revisions to the Emergency Plan I'mplementing Documents.

These revisions are as follows:

EP-2-030 Emergency Radiation Exposure Guidelines and Controls, Rev 1, Change 1 EP-2-033 Administration of Iodine Blocking Agents, Rev 1, Change 1 EP-2-090 Accident Assessment, Rev 1, Change 1 EP-2-110 Man-Caused Emergencies, Rev 1, Change 1 EP-2-120 Natural Emergencies, Rev 1, Change 1 EP-2-130 Emergency Team Assignments, Rev 1, Change 1 EP-2-140 Reentry, Rev 1, Change 1 EP-2-150 Emergency Records, Rev 1, Change 1 EP-3-060 Emergency Communications Guidelines, Rev 1, Change 1 Please remove the old revisiens, replacing them with the revisions outlined above.

The superseded documents should be destroyed.

l lL g' h ;

8308040697 830726 DR ADOCK 05000 j/C

- -wf-

~

~

Page 2 W3F83-0254 Also enclosed are four white binders with Waterford 3 SES Emergency Plan Implementing Documents cover sheets and spine covers.

Two books are marked controlled copy 027 the other two books are controlled copy 028.

Due to the numerous procedures it is suggested the Implementing Documents be posted in two volumes.

If there are any questions pertaining to this submittal, please contact R. Azzarello at (504) 464-3292.

Very tr ly yours, j

l 7

W" F. J. Drummond Project Support Manager - Nuclear FJD/GPB/lmc Attachment cc:

w/o

Attachment:

E. L. Blake, L.

Constable, J.

Wilson, D.

Perrotti, C. Hackney, S.E. Turk, G. Groesch

.(I e

._.