Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures F3-1 Re Onsite Emergency organization,F3-14.2 Re Operations Emergency Surveys & F3-23 Re Emergency Sampling
ML20080B198
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/15/1983
From: Ward E
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20080B182 List:
References
NUDOCS 8308040664
Download: ML20080B198 (2)


Text

, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ __

l l

Northem States Power Company 414 Nellet Mae Minneapoks. Minneseta $540t

* "*'S' "30-550 July 15,1983 Regional Administrator Region III U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES Furnished with this letter is one copy of Revisions 21 and 22 to the NSP Prairie Island Nuclear Emergency Plan Implementing Procedures. These revisions include the following procedures:

REV 21

  • F3 Table of Contents Rev 21 F3-1 Onsite Emergency Organization (Page 1 thru 18) Rev 3 F3-4 Responsibilities During an Alerg, Site Area, or General Emergency (Page 1 thru 31) Rev 8 F3-6 Activation and Operation of Technical Support Center (Page 1 thru 9) Rev 3 F3-7 Activation and Operation of Operational Support Center (Page 1 thru 9) Rev 4 F3-14.2 Operations Emergency Surveys (Page 1 thru 15) Rev 2 F3-15 Responsibilities of the Radiation Survey Teams During A Radioactive Airborne Release (Page 1 thru 26) Rev 6 F3-16 Responsibilities of the Radiation Survey Teams During a Radioactive Liquid Release (Page 1 thru 17) Rev 4 F3-18 Thyroid Iodine Blocking Agent (Potassium Iodine) (Page 1 thru 8) Rev 2 F3-20 Manual Determination of Radioactive Release Concentrations (Page 1 thru 20) Rev 4 F3-21 Establishment of a secondary Access Control Point (Page 1 thru 4) Rev 3
  • F3-23 Emergency Sampling (Page 1 thru 49) Rev 5 REV 22 F Section Index Rev 6
  • F3 Table of Contents Rev 22
  • F 3-23 Emergency Sampling (Page 1 thru 50) Rev 6 F3-23.1 Emergency Hoteell Procedure (Page 1 thru 5) Rev 0 F3-23.2 Post Accident Chloride Analysis by Ion Exchange Chromatography (Page 1 thru 10) Rev 0
  • Enter latest revision only.

XooS 1 -

8308040664 830726 PDR F ADOCK 05000282 PDR

NORTHERN CTATE3 PCWER COMPANY NRC Region III July 15, 1983 Page 2 Some of these procedures include names and/or telephone numbers of persons having responsibility under the Emergency Plan. To maintain the confidentiality of the above information for reasons of privacy and plan effectiveness, we have deleted names and/or telephone numbers from the copies which are sent to NRR because portions of these documents will be docketed.

E C Ward P E Manager-Nuclear Environmental Services ECW/GDH/ dab cc: Director of NRR (2)

NRC Resident Inspector (w/o attachment)

G Charnoff (w/o attachment)